Natural Disasters, Fires, Occupational Accidents and Other Accidents
First written in FY2016. 3 of 8 entries say "Materialised", first in FY2020-Q3. Latest entry: FY2026.
EnBio Holdings,Inc moved to the "Worse" side of this theme in 2025, 7 years after the typical company in this theme (2018).
The whole theme swung hardest in 2021: 6 of 8 companies on the "Worse" side.
3 other companies' latest entry also says "Materialised".
- FY2026MaterialisedAnnual report
「Insurance proceeds received during the consolidated fiscal year consisted of insurance payments and other amounts received for damage caused by the theft of cables at the EBH Chiba-Wakaba Power Plant, owned by our consolidated subsidiary Vega Solar G.K., in March 2025.」
Regarding risks from natural disasters, fires, accidents and other events, cable theft at the solar power plant actually occurred, resulting in repair costs and an operating shutdown. - FY2025MaterialisedAnnual report
「During the consolidated fiscal year, civil-engineering repair costs were incurred at the mega-solar power plant in Shika, Ishikawa Prefecture, as a result of the 2024 Noto Peninsula Earthquake, among other factors that reduced profit.」
The natural-disaster risk materialised as civil-engineering repair costs at the solar power plant following the Noto Peninsula Earthquake. - FY2022MitigatedAnnual report
「Earthquakes occurred off the coast of Miyagi Prefecture in May 2021, in the Noto region of Ishikawa Prefecture in September, in northwestern Chiba Prefecture in October, and off the coast of Miyagi Prefecture in March 2022, but these earthquakes had no impact on our power plants, including those of Group companies.」
The company states that several earthquakes occurred but had no impact on the power plants. - FY2021MitigatedAnnual report
「Earthquakes occurred off the coast of Fukushima Prefecture in February and off the coast of Miyagi Prefecture in March, but these earthquakes had no impact on our power plants, including those of Group companies.」
The company states that the power plants were unaffected when the earthquakes occurred, and no actual impact from natural disasters was identified. - FY2021-Q1MitigatedAnnual report
「Although revenue declined because some power plants were shut down after being affected by Typhoon Hagibis, which struck on 12 October 2019, profit increased because insurance proceeds and other amounts for business-interruption compensation during the shutdown period were received during the first quarter of the current fiscal year. All power plants affected by Typhoon Hagibis have now resumed operations.」
Although the effects of the power-plant shutdowns caused by Typhoon Hagibis remained, insurance proceeds and other amounts were received, and all affected power plants resumed operations. - FY2020-Q3MaterialisedAnnual report
「Some of our power plants were affected by Typhoon Hagibis, which struck on 12 October 2019, but they are expected to be restored sequentially.」
The natural-disaster risk materialised as Typhoon Hagibis affected some power plants, which were expected to be restored sequentially. - FY2017RestatedAnnual report
「Our company places safety first and has established a safety and health council involving labour and management, while working to prevent accidents through measures including safety patrols and safety training.」
The company reiterates accident-prevention measures involving the safety and health council, safety patrols and safety training. - FY2016First statedAnnual report
「Our Group places safety first and has established a safety and health council involving labour and management, while working to prevent accidents through measures including safety patrols and safety training. However, if a serious industrial accident or other accident were to occur, operations could be disrupted, potentially affecting business performance and other matters.」
The company identifies the safety and health council, safety patrols and safety training as countermeasures.