Multifaceted Quality Control and Safety and Environmental Management for Large-Scale Projects

First written in FY2021. 3 of 7 entries say "Restated". Latest entry: FY2026.

7entries
6years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2021 – FY2024-Q1AdvancedFY2025 – FY20262021: 120212022: 120222023: 220232024: 020242025: 220252026: 12026
Same theme, other companies
Strengthening Risk and Quality Management for M&A and Large-Order ProjectsA theme 5 companies write about · 0 as a headwind · 5 as a tailwind

1 other company's latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「For soil contamination remediation projects with contract values exceeding a specified amount, we will apply the percentage-of-completion method and seek to improve accuracy through timely monthly cost management.」

    For quality and cost control on large projects, the company continued applying the percentage-of-completion method to construction projects above a specified amount and managing costs monthly, while also demonstrating actual results from shortening construction periods and improving costs through DX and other measures.
  2. FY2026-H1AdvancedAnnual report

    「In the soil contamination remediation business, we are advancing initiatives including proposals for risk-based methods and performance-guaranteed construction, thorough construction quality, cost and schedule management, and improved operational efficiency through DX.」

    In addition to conventional quality and cost management, the company has expressly identified thorough schedule management and expanded the scope of management for soil contamination remediation projects.
  3. FY2025AdvancedAnnual report

    「For soil contamination remediation projects with contract values exceeding a specified amount, we will apply the percentage-of-completion method and seek to improve accuracy through timely monthly cost management.」

    The company added a specific management method for quality and cost control of large-scale projects, combining the percentage-of-completion method with monthly management.
  4. FY2024-Q1RestatedAnnual report

    「We are advancing initiatives including construction quality control, thorough construction cost management and operational efficiency improvements through digital transformation.」

    The company continues to advance construction quality control, cost management and efficiency improvements through digital transformation.
  5. FY2023RestatedAnnual report

    「We will pursue risk management by thoroughly implementing a quality control system under which sales, engineering and construction personnel review projects from multiple perspectives to improve quality and reduce costs, while further strengthening safety measures led by the Safety and Quality Control Office.」

    For large-scale projects, the company continues multifaceted management by sales, engineering and construction personnel, cost reduction and safety measures led by the Safety and Quality Control Office.
  6. FY2022RestatedAnnual report

    「We will pursue risk management by thoroughly implementing a quality control system under which sales, engineering and construction personnel review projects from multiple perspectives to improve quality and reduce costs, while further strengthening safety measures led by the Safety and Quality Control Office.」

    The company is reaffirming its policy of multifaceted quality and cost management by sales, engineering and construction personnel, together with safety management, for large-scale projects.
  7. FY2021First statedAnnual report

    「We recognise that large-scale projects entail significant business risks, with profits potentially exceeding or falling short of expectations depending on the quality of quality and cost management. We will pursue risk management by thoroughly implementing a quality control system under which sales, engineering and construction personnel review projects from multiple perspectives to improve quality and reduce costs, while further strengthening safety measures by enhancing the Safety and Environmental Office.」

    To address profit fluctuation risks in large-scale projects, the company has identified multifaceted management by sales, engineering and construction personnel, cost reduction and reinforcement of the Safety and Environmental Office as new priority issues.
Moved together

"Expanding the Scope of Environmental Services through Investment in Infrastructure" moved the same way as this thread, in the same document, in 3 of its 7 moves.

333222★123456
  1. ★This thread
  2. 1Expanding the Scope of Environmental Services through Investment in Infrastructure3×
  3. 2Technology Development for Newly Regulated and Difficult-to-Treat Substances3×
  4. 3Policy of prioritizing growth investment and strengthening retained earnings3×
  5. 4Expansion of Renewable Energy Business2×
  6. 5Acquisition, remediation and resale or leasing of contaminated land2×
  7. 6Improving the ratio of prime-contract orders and reducing the cost ratio through greater management efficiency2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for EnBio Holdings,Inc yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Multifaceted Quality Control and Safety and Environmental Management for Large-Scale Projects | EnBio Holdings,Inc (6092) | Komori