Komori
Tenryu Saw Mfg. (5945) · RiskWorsened

Suspension of head-office factory operations due to the Tokai earthquake and other events

First written in FY2017. 3 of 6 entries say "Restated". Latest entry: FY2025.

6entries
9years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2017 – FY2019WorsenedFY20202017: 120172018: 120182019: 120192020: 120202021: 020212022: 020222023: 020232024: 120242025: 12025
Same theme, other companies

The whole theme swung hardest in 2018: 34 of 133 companies on the "Worse" side.

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 188 companies compared. The sentences above are computed from all 188.Comparing 200 of the theme's 563 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2025Explicit identification of the risk of supply disruptionsAnnual report

    「If production facilities or equipment are damaged, or supplies of electricity, water, gas or other utilities are interrupted, or domestic or international logistics are disrupted, operations may be interrupted, potentially delaying production and shipments.」

    Explicitly identifies interruptions in electricity, water, gas and other utility supplies as factors that may interrupt operations, in addition to natural disasters, equipment damage and logistics disruptions.
  2. FY2024RestatedAnnual report

    「If the Group's production facilities or equipment suffer significant damage due to natural disasters such as earthquakes beyond the Group's control, accidents such as fires, terrorism in Japan or overseas, or other causes, or if domestic or international logistics are disrupted, the Group's operations may be interrupted and production and shipments delayed, which may have a material adverse effect on the Group's operating results and financial condition.」

    Explicitly adds disruptions to domestic and international logistics to the risks relating to natural disasters, fires and terrorism affecting production facilities and equipment, including the head-office factory.
  3. FY2020WorsenedAnnual report

    「If the Group's production facilities or equipment suffer significant damage due to natural disasters such as earthquakes beyond the Group's control, accidents such as fires, terrorism in Japan or overseas, or other causes, the Group's operations may be interrupted and production and shipments delayed, which may adversely affect the Group's operating results and financial condition.」

    Broadens the scope from earthquake risks at the head-office factory in Shizuoka Prefecture to the risk of operational interruptions caused by natural disasters, fires, terrorism and other events affecting production facilities and equipment generally.
  4. FY2019RestatedAnnual report

    「We have long implemented measures to prepare for anticipated earthquakes and other disasters, but if an event occurs that interrupts factory operations, it may adversely affect the Group's operating results and financial condition.」

    Reiterates the risk of interruption of operations at the head-office factory in Shizuoka Prefecture due to anticipated earthquakes and other disasters, as well as the implementation of countermeasures.
  5. FY2018RestatedAnnual report

    「The head-office factory, which is central to the Group's business activities, is located in Shizuoka Prefecture. We have long implemented measures to prepare for anticipated earthquakes and other disasters, but if an event occurs that interrupts factory operations, it may adversely affect the Group's operating results and financial condition.」

    Reiterates the risk of interruption of operations at the head-office factory in Shizuoka Prefecture due to anticipated earthquakes and other disasters, as well as the implementation of countermeasures.
  6. FY2017First statedAnnual report

    「The head-office factory, which is central to the Group's business activities, is located in Shizuoka Prefecture. We are implementing measures to prepare for the anticipated Tokai earthquake, but if an event occurs that interrupts factory operations, it may adversely affect the Group's operating results and financial condition.」

    States that the potential interruption of operations at the head-office factory in Shizuoka Prefecture due to the Tokai earthquake and other events may affect operating results and financial condition, and that countermeasures are being implemented.
Moved together

"Sharp exchange-rate fluctuations and uncertainty over overseas economies" moved the same way as this thread, in the same document, in 2 of its 6 moves.

22222★12345
  1. ★This thread
  2. 1Sharp exchange-rate fluctuations and uncertainty over overseas economies2×
  3. 2Weakness or stagnation in domestic and overseas markets2×
  4. 3Price competition with low-priced products from China, Europe and elsewhere2×
  5. 4Sales concentration in major customer Makita Corporation2×
  6. 5Uncertainty in overseas economies due to US economic policy and geopolitical risks2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Tenryu Saw Mfg.'s next results are scheduled for 2026-11-09. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.