Komori
TAKADAKIKO(Steel Construction) (5923) · InitiativeAdvanced

Improving Productivity, Quality and Working Conditions through BIM/CIM

First written in FY2021. 5 of 6 entries say "Advanced", first in FY2022. Latest entry: FY2026.

6entries
6years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2021AdvancedFY2022 – FY20262021: 120212022: 120222023: 120232024: 120242025: 120252026: 12026
Same theme, other companies

The whole theme swung hardest in 2022: 1 of 11 companies on the "Worse" side.

11 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 26 companies compared. The sentences above are computed from all 26.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「We jointly researched and developed the digital-twin construction management system DX Twin View with 千代田測器株式会社, based on diverse data collected using ICT technologies.」

    Building on research into BIM, CIM and MR, we jointly developed a digital-twin construction management system. We plan to use it in our own construction projects and sell it externally.
  2. FY2025AdvancedAnnual report

    「We jointly researched and developed the digital-twin construction management system DX Twin View with 千代田測器株式会社, based on diverse data collected using ICT technologies.」

    Building on research into BIM/CIM and MR, we jointly developed a digital-twin construction management system. We plan to use it in our own construction projects to improve quality through real-time reconstruction of construction conditions and visualization of management values. We also jointly developed an automated coating-thickness reporting system and plan to sell it externally.
  3. FY2024AdvancedAnnual report

    「We are also working to introduce 4D schedules that can simulate construction plans using BIM/CIM and to develop an erection management system using a digital twin.」

    The initiative moved from research and study of BIM/CIM to the practical use of 4D schedules and development of a digital-twin erection management system.
  4. FY2023AdvancedAnnual report

    「We are also developing a steel bridge erection planning and erection management system using mixed reality with MR devices.」

    The company moved from researching and examining BIM/CIM to developing a steel bridge erection planning and erection management system using MR devices.
  5. FY2022AdvancedAnnual report

    「We are also conducting advanced research on steel bridge erection planning using mixed reality with MR devices.」

    In addition to researching and examining digital technologies such as BIM/CIM, the company developed a specific initiative for advanced research into steel bridge erection planning using MR devices.
  6. FY2021First statedAnnual report

    「We are researching and examining the latest developments in BIM/CIM to improve productivity and quality and working conditions through digital technologies such as ICT and AI, which have attracted increasing attention in recent years.」

    The company newly disclosed an initiative to research and examine the latest developments in BIM/CIM using digital technologies such as ICT and AI.
Moved together

"Human Resources Development Aimed at Revitalizing Organizations Across Boundaries" moved the same way as this thread, in the same document, in 5 of its 6 moves.

543333★123456
  1. ★This thread
  2. 1Human Resources Development Aimed at Revitalizing Organizations Across Boundaries5×
  3. 2Capital Investment to Ensure Consistent Quality and Use of Retained Earnings for Business Expansion4×
  4. 3Introduction of a Restricted Stock Compensation Plan3×
  5. 4Interest Rate Risk3×
  6. 5Significant increase in order intake in the steel structures business3×
  7. 6Liquidity Risk Relating to Funding3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for TAKADAKIKO(Steel Construction) yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Improving Productivity, Quality and Working Conditions through BIM/CIM | TAKADAKIKO(Steel Construction)CO.,LTD. (5923) | Komori