Implementation of a production management system for bright steel bars

First written in FY2016. 3 of 6 entries say "Advanced", first in FY2017. Latest entry: FY2026.

6entries
11years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2017 – FY2019OtherFY2023 – FY20242016: 120162017: 120172018: 020182019: 120192020: 020202021: 020212022: 020222023: 120232024: 120242025: 020252026: 12026
Same theme, other companies
Strengthening the Order Management and Production Control SystemsA theme 4 companies write about · 0 as a headwind · 4 as a tailwind

2 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「SANYU CO.,LTD. Osaka Prefecture Bright steel bars and steel wire for cold heading division Core system renewal ¥300 million ¥15.76 million paid to date Internal funds June 2025 October 2027 -」

    Following a review of investment related to the production management system, the core system renewal has been specified as a total investment of ¥300 million, with ¥15.76 million paid to date, work commencing in June 2025 and completion scheduled for October 2027.
  2. FY2024Re-recording of investment related to the production management systemAnnual report

    「Increase in software (Hirakata Plant) Head office production management system ¥8.5 million (Kyushu Plant) Modification of Kyushu production management system ¥5.8 million」

    Following the 2023 review of the development plan and impairment, ¥8.5 million for the head office production management system at the Hirakata Plant and ¥5.8 million for modifications to the Kyushu production management system are listed as increases in software.
  3. FY2023Review of the production management system development plan and impairmentAnnual report

    「The development costs for the production management system had been recorded for the above assets as software under construction included in other intangible fixed assets. Following the decision to review the development plan, the originally anticipated benefits were no longer expected, so the carrying amount was reduced to the recoverable amount, and part of the reduction was recorded as an impairment loss under extraordinary losses. The recoverable amount was measured based on value in use, but because no future cash flows were expected, the recoverable amount was assessed at zero.」

    Following a review of the production management system development plan, the originally anticipated benefits and future cash flows were no longer expected, and an impairment loss of ¥13.473 million was recorded for software under construction.
  4. FY2019AdvancedAnnual report

    「Increase in tools, furniture and fixtures (Yao Plant) Production management system server ¥13.1 million」

    The acquisition of a server for the production management system at the Yao Plant, costing ¥13.1 million, is listed as an increase in property, plant and equipment. The completion date itself is not stated, but investment related to the implementation is continuing.
  5. FY2017AdvancedAnnual report

    「The bright steel bar production management system was scheduled for completion in March 2017, but the expected completion date is likely to be pushed back to January 2018 due to improvements to the specifications.」

    ¥48.832 million was recorded for Phase 1 of the production management system, while Phase 2 is also proceeding, and the scheduled completion date was postponed to January 2018.
  6. FY2016First statedAnnual report

    「The bright steel bar production management system was scheduled for completion in January 2016, but the expected completion date is likely to be pushed back to March 2017 due to improvements to the specifications.」

    The scheduled completion of the production management system implementation was postponed due to improvements to the specifications.
Moved together

"Securing earnings, improving productivity, and reducing costs" moved the same way as this thread, in the same document, in 3 of its 6 moves.

333332★123456
  1. ★This thread
  2. 1Securing earnings, improving productivity, and reducing costs3×
  3. 2Expanding sales volume through deeper engagement with existing customers and new customer development3×
  4. 3Maintaining stable dividends3×
  5. 4Optimizing the group's production structure and improving productivity and quality3×
  6. 5Investment to improve quality and production efficiency, including seismic retrofitting3×
  7. 6Passing higher steel prices through to product prices2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Sanyu's next results are scheduled for 2026-11-04. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.