Risks in Estimating Revenue and Costs under the Percentage-of-Completion Method

First written in FY2021. 4 of 5 entries say "Restated". Latest entry: FY2026.

5entries
6years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2021 – FY20262021: 120212022: 120222023: 120232024: 120242025: 020252026: 12026
Same theme, other companies
Uncertainty in Cost and Progress Estimates for Construction Revenue RecognitionA theme 124 companies write about · 121 as a headwind · 2 as a tailwind

The whole theme swung hardest in 2022: 10 of 85 companies on the "Worse" side.

53 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 124 companies compared. The sentences above are computed from all 124.
Full recordFilings, disclosures and news, newest first
  1. FY2026RestatedAnnual report

    「Estimates of total construction costs and other amounts are calculated by estimating the costs of all construction work required through completion and handover. If the scope of work changes after construction begins, estimates are revised in a timely and appropriate manner.」

    The risks associated with estimating and re-estimating the degree of completion, revenue from completed construction contracts and construction costs continue to be disclosed.
  2. FY2024RestatedAnnual report

    「Estimates of total construction costs and other amounts are calculated by estimating the costs of all construction work required through completion and handover. If the scope of work changes after construction begins, estimates are revised in a timely and appropriate manner.」

    The risks associated with estimating and re-estimating revenue, costs and the degree of completion as construction progresses continue to be disclosed.
  3. FY2023RestatedAnnual report

    「Estimates of total construction costs and other amounts are calculated by estimating the costs of all construction work required through completion and handover. If the scope of work changes after construction begins, estimates are revised in a timely and appropriate manner.」

    The risks associated with estimating and re-estimating revenue, costs and the degree of completion as construction progresses continue to be disclosed.
  4. FY2022RestatedAnnual report

    「Estimates of total construction costs and other amounts are calculated by estimating the costs of all construction work required through completion and handover. If the scope of work changes after construction begins, estimates are revised in a timely and appropriate manner.」

    The risks associated with estimating and re-estimating revenue, costs and the degree of completion as construction progresses continue to be disclosed.
  5. FY2021First statedAnnual report

    「Estimates of total construction costs and other amounts are calculated by estimating the costs of all construction work required through completion and handover. If the scope of work changes after construction begins, estimates are revised in a timely and appropriate manner.」

    The risk that estimates of revenue, costs and the degree of completion under the percentage-of-completion method may affect business performance was disclosed for the first time as a separate critical accounting estimate.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
Japan Insulation's next results are scheduled for 2026-11-12. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.