Komori
Japan Insulation (5368) · RiskRestated

Risk of Production and Construction Delays Caused by Natural Disasters

First written in FY2021. 4 of 5 entries say "Restated". Latest entry: FY2026.

5entries
6years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2021 – FY20262021: 120212022: 120222023: 120232024: 120242025: 020252026: 12026
Same theme, other companies

The whole theme swung hardest in 2020: 75 of 117 companies on the "Worse" side.

103 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 199 companies compared. The sentences above are computed from all 199.Comparing 200 of the theme's 493 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2026RestatedAnnual report

    「If a major earthquake, storm or flood, epidemic, or other natural disaster were to occur at any of these sites, substantial costs could arise from safety checks related to restoring the facilities owned by the Group, delays in construction work on projects under construction, and shipment delays resulting from a temporary suspension of production, potentially affecting the financial position and operating results.」

    The risks of production stoppages, shipment delays and construction delays caused by natural disasters and epidemics continue to be disclosed.
  2. FY2024RestatedAnnual report

    「If a major earthquake, storm or flood, epidemic, or other natural disaster were to occur at any of these sites, substantial costs could arise from safety checks related to restoring the facilities owned by the Group, delays in construction work on projects under construction, and shipment delays resulting from a temporary suspension of production, potentially affecting the financial position and operating results.」

    The risks of production stoppages, shipment delays and construction delays caused by natural disasters and epidemics continue to be disclosed.
  3. FY2023RestatedAnnual report

    「If a major earthquake, storm or flood, epidemic, or other natural disaster were to occur at any of these sites, substantial costs could arise from safety checks related to restoring the facilities owned by the Group, delays in construction work on projects under construction, and shipment delays resulting from a temporary suspension of production, potentially affecting the Group's financial position and operating results.」

    The risks of production stoppages, shipment delays and construction delays caused by natural disasters and epidemics continue to be disclosed.
  4. FY2022RestatedAnnual report

    「If a major earthquake, storm or flood, or other natural disaster were to occur at any of these sites, substantial costs could arise from safety checks related to restoring the facilities owned by the Group, delays in construction work on projects under construction, and shipment delays resulting from a temporary suspension of production, potentially affecting the Group's financial position and operating results.」

    The risks of production stoppages, shipment delays and construction delays caused by natural disasters continue to be disclosed.
  5. FY2021First statedAnnual report

    「If a major earthquake, storm or flood, or other natural disaster were to occur at any of these sites, substantial costs could arise from safety checks related to restoring the facilities owned by the Group, delays in construction work on projects under construction, and shipment delays resulting from a temporary suspension of production, potentially affecting the Group's financial position and operating results.」

    The impact of natural disasters on domestic and overseas production sites, projects under construction and shipments was disclosed for the first time as a separate risk.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
Japan Insulation's next results are scheduled for 2026-11-12. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.