Damage to Facilities in Nagano Prefecture from Typhoon No. 19

First written in FY2020-Q1. 3 of 10 entries say "Worsened", first in FY2020-Q2. Latest entry: FY2026.

10entries
8years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseWorsenedFY2020-Q1 – FY2020MitigatedFY2021-Q3 – FY2021RestatedFY2023 – FY20252019: 12020: 420202021: 220212022: 020222023: 120232024: 020242025: 120252026: 12026
Same theme, other companies

Takamisawa moved to the "Worse" side of this theme in 2019, 1 year before the typical company in this theme (2020).

The whole theme swung hardest in 2018: 21 of 93 companies on the "Worse" side.

29 other companies' latest entry also says "Mitigated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 196 companies compared. The sentences above are computed from all 196.Comparing 200 of the theme's 369 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2026MitigatedAnnual report

    「The group will work to reduce risks through the formulation and review of its business continuity plan (BCP).」

    In response to the impact of natural disasters and infectious diseases on business activities, the company explicitly states that it will reduce risks through the formulation and review of its BCP.
  2. FY2025RestatedAnnual report

    「If natural disasters such as earthquakes, typhoons, or floods damage production facilities or halt operations and disrupt the continuity of business activities, the Group's results may be affected.」

    The risk of equipment damage and operational stoppages caused by natural disasters continues to be disclosed as a major risk.
  3. FY2023RestatedAnnual report

    「If natural disasters such as earthquakes, typhoons, or floods damage production facilities or halt operations and disrupt the continuity of business activities, the Group's results may be affected.」

    The risk of equipment damage and operational stoppages caused by natural disasters continues to be disclosed as a general major risk.
  4. FY2021MitigatedAnnual report

    「As restoration work at sites in Nagano Prefecture damaged by Typhoon Hagibis gathered pace, sales and profits increased, supported by strong sales of civil engineering materials such as concrete products for public- and private-sector construction projects.」

    Regarding the impact of the typhoon damage on the business, restoration work at the damaged sites gathered pace, and this was disclosed as a recovery in results in the construction-related business.
  5. FY2021-Q3MitigatedAnnual report

    「Recovery work at disaster sites in Nagano Prefecture affected by the Reiwa 1 East Japan Typhoon got into full swing, while civil engineering materials such as concrete products for public- and private-sector construction projects performed strongly, resulting in higher revenue and profit.」

    Restoration work at sites damaged by the typhoon accelerated, and this was disclosed as a recovery in results in the construction-related business.
  6. FY2021-Q1RestatedAnnual report

    「Impact of damage to an automotive inspection and repair facility and the resulting suspension of operations caused by Typhoon Hagibis」

    The impact of damage to the automotive inspection and repair facility and the resulting suspension of operations caused by Typhoon Hagibis continued into the first quarter of the current fiscal year.
  7. FY2020WorsenedAnnual report

    「The Company sustained damage from Typhoon Hagibis in October 2019 and recorded ¥1,072 million in losses from the disaster. The breakdown was ¥73 million for the loss of inventories, ¥209 million for the loss of fixed assets, and ¥788 million for restoration and other costs.」

    Losses recorded for damage caused by Typhoon Hagibis increased from ¥627 million for the cumulative third quarter to ¥1,072 million for the full year, providing a more definitive picture of the damage and restoration costs.
  8. FY2020-Q3WorsenedAnnual report

    「The Company sustained damage from Typhoon Hagibis in October 2019 and recorded ¥627 million in losses from the disaster. The breakdown was ¥73 million for the loss of inventories, ¥197 million for the loss of fixed assets, and ¥357 million for restoration and other costs. Costs and other items that are difficult to reasonably estimate at this time are not included, so the recorded amount may change in the future.」

    Losses recorded for damage caused by Typhoon Hagibis were quantified and increased from ¥405 million in the previous quarter to ¥627 million. The disclosure included the breakdown of losses of inventories and fixed assets and restoration and other costs, as well as the possibility of future changes.
  9. FY2020-Q2WorsenedAnnual report

    「The Company sustained damage from Typhoon Hagibis in October 2019 and recorded ¥405 million in losses from the disaster. The breakdown was ¥62 million for the loss of inventories, ¥179 million for the loss of fixed assets, and ¥163 million for restoration and other costs. Costs and other items that are difficult to reasonably estimate at this time are not included, so the recorded amount may change in the future.」

    The damage caused by Typhoon Hagibis was quantified as ¥405 million in losses. The breakdown was ¥62 million for the loss of inventories, ¥179 million for the loss of fixed assets, and ¥163 million for restoration and other costs, with the possibility of future changes also disclosed.
  10. FY2020-Q1MaterialisedAnnual report

    「The Chikuma River embankment breached during Typhoon Hagibis in October 2019, damaging the Company's business locations in Nagano Prefecture. Fortunately, there were no casualties among employees or others. The amount of the impact on financial condition and business results is currently being calculated.」

    Business locations in Nagano Prefecture were damaged when the Chikuma River embankment breached during Typhoon Hagibis. There were no casualties, and the amount of the impact on financial condition and business results is being calculated.
Moved together

"Guarantee of 信州生コン’s Debt" moved the same way as this thread, in the same document, in 6 of its 10 moves.

654433★123456
  1. ★This thread
  2. 1Guarantee of 信州生コン’s Debt6×
  3. 2Guarantees of Indebtedness for Housing-Loan Customers5×
  4. 3Increase in Total Assets and Liabilities and Decline in Equity Ratio4×
  5. 4Decline in Fresh Produce Handling Volumes Due to Adverse Weather4×
  6. 5Strengthening Sales Capabilities and Proposal-Based Sales3×
  7. 6Sluggish fuel demand and falling crude oil prices3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Takamisawa's next results are scheduled for 2026-11-06. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.