Komori
Nippon Hume (5262) · InitiativeAdvanced

Digitalization of Design and Construction Management, BIM/CIM, and Value-Added Services

First written in FY2021. 16 of 17 entries say "Advanced", first in FY2022-Q2. Latest entry: FY2027-H1.

17entries
6years
3from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2022-Q2 – FY2027-H12021: 220212022: 320222023: 320232024: 220242025: 220252026: 52026
Same theme, other companies

0 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2027-H1AdvancedAnnual report

    「We introduced inspection and diagnostic technologies under the “No Entry” concept, which keeps people out of hazardous pipelines, including the HS Monitor corrosion-risk monitoring system and internal pipeline inspections using small drones. We also proposed preventive-maintenance infrastructure management extending through subsequent repairs, rehabilitation and renewal.」

    The scope of digitalization was expanded from design and construction management to internal pipeline inspections and diagnostics using the HS Monitor and small drones, advancing preventive-maintenance services to the proposal stage.
  2. FY2026AdvancedAnnual report

    「Particularly in the sewerage field, we are strengthening an integrated service structure covering everything from surveys and diagnosis through renewal, while also working to enhance inspections and diagnosis using digital technologies such as drones.」

    We are expanding the scope of digitalization from design and construction management to infrastructure inspections and diagnosis using drones and other technologies, with the aim of providing infrastructure management services covering everything from surveys through renewal.
  3. 2026-06-02AdvancedGeneral Meeting of Shareholders

    「・ICT施工管理システム「Pile-ViMSys」の活用拡大により、施工品質と生産性の向上を進めました。」

    ICT施工管理システムの活用拡大を、施工品質・生産性向上の実績として記載した。
  4. FY2026-H1AdvancedAnnual report

    「・ We introduced NH-GFAS, an automated drafting system for precast guardrails, reducing design time by approximately 70%. By accelerating estimates and proposals, we aim to expand orders.」

    We introduced NH-GFAS, an automated drafting system for precast guardrails, reducing design time by approximately 70%. We aim to expand orders by accelerating estimates and proposals.
  5. FY2025AdvancedAnnual report

    「We added a pile layout drawing function to the ICT construction management tool Pile-ViMSys®, improving on-site construction efficiency and quality control.」

    A pile layout drawing function was added to Pile-ViMSys®, enabling real-time monitoring based on the positional relationship with design drawings, as well as remote checking and approval.
  6. FY2025-H1AdvancedAnnual report

    「The company added a pile layout plan function to the ICT construction management system Pile-ViMSys®. This makes it possible not only to monitor pile construction progress in real time with the same positional relationships as in the design drawings, but also to check and approve it remotely. Going forward, the company will continue to expand the system’s functions, improve safety and increase construction management efficiency through the ICT construction management system, and work to automate construction, for which a specific vision has been established under the Ministry of Land, Infrastructure, Transport and Tourism’s i-Construction 2.0, in an effort to innovate pile construction.」

    The addition of a pile layout drawing function to Pile-ViMSys® enables real-time monitoring of construction progress and remote checking and approval. It also demonstrates efforts to automate construction based on i-Construction 2.0.
  7. FY2024-Q3AdvancedAnnual report

    「The company’s electronic whiteboard construction photography application VimSys Camera (ヴィムシスカメラ)® passed the Ministry of Land, Infrastructure, Transport and Tourism’s authenticity verification and small blackboard information integration function tests and received certification. By adding the VimSys Camera (ヴィムシスカメラ)® function to the company’s already operational integrated pile construction management system, Pile-ViMSys (パイルヴィムシス)®, it became possible to check and approve construction progress in real time from a remote location. As part of its efforts to improve design efficiency, the company enhanced the functions of its pile design software and shortened design time for core operations.」

    The company passed the Ministry of Land, Infrastructure, Transport and Tourism’s tests and obtained certification, enabled remote checking and approval through integration with Pile-ViMSys, and enhanced its pile design software to shorten design time.
  8. FY2024-Q2AdvancedAnnual report

    「In the foundation business, the company upgraded its pile design software to improve design productivity and implemented additional functions in the ICT construction management system Pile-ViMSys® (パイルヴィムシス). It also established a BIM/CIM Promotion Office to promote productivity improvements for precast products using 3D design models.」

    The digitalisation initiatives progressed to updating the pile design software, implementing additional Pile-ViMSys functions and establishing a BIM/CIM Promotion Office.
  9. FY2024-Q1AdvancedAnnual report

    「As a technology research and development highlight for the first 3 quarters of the current consolidated fiscal year, the company announced on 20 April 2023 that it had developed manufacturing technology for precast products using artificial intelligence (AI). It will promote more consistent quality and labour savings in the manufacture of precast concrete products, thereby seeking to further enhance competitiveness.」

    In addition to its digitalisation initiatives focused on design and construction management, the company developed AI-enabled manufacturing technology for precast products, expanding the focus to quality stabilisation and labour savings.
  10. FY2023-Q3AdvancedAnnual report

    「In the foundation business, the company upgraded its pile design software to improve design productivity and implemented additional functions in the ICT construction management system Pile-ViMSys® (パイルヴィムシス). It also established a BIM/CIM Promotion Office to promote productivity improvements for precast products using 3D design models.」

    The company specified concrete progress in digitalisation, including an upgrade to its pile design software, implementation of additional Pile-ViMSys functions and establishment of a BIM/CIM Promotion Office.
  11. FY2023-Q2AdvancedAnnual report

    「Promoting nationwide implementation of Pile-ViMSys®, an ICT construction management system for piling work, and shortening construction management time through functional enhancements」

    The company specified the scope and expected benefits of its digitalisation initiatives: nationwide deployment of Pile-ViMSys and shorter construction management times through enhanced functionality.
  12. FY2023-Q1AdvancedAnnual report

    「The company worked to implement Pile-ViMSys®, a next-generation DX construction management system, at actual construction sites and add functionality.」

    The company disclosed specific progress in digitalising construction management by deploying Pile-ViMSys at actual construction sites and adding functions.
  13. FY2022-Q3AdvancedAnnual report

    「As part of its response to digitalisation, the company worked to expand the functions of its next-generation DX construction management system, Pile-ViMSys, and to develop business systems for greater automation and efficiency.」

    Regarding the digitalisation of design and construction management, the company disclosed specific progress through expanded Pile-ViMSys functionality and the development of business systems for automation and efficiency.
  14. FY2022-Q2AdvancedAnnual report

    「The company released Pile-ViMSys (パイルヴィムシス), a next-generation DX construction management system designed to improve both construction quality and efficiency for foundation pile installation, as a key digitalisation initiative in its growth strategy.」

    Regarding its policy of digitalising design and construction management, the company released a specific system designed to improve the quality and efficiency of foundation pile installation.
  15. FY2021First statedAnnual report

    「Promote digitalisation from design through construction management to improve efficiency and quality control The company will continue to address the ageing of social infrastructure and environmental issues, while strengthening its DX (digital transformation) initiatives. ・Creation of value-added services using digital technologies To address the ageing of social infrastructure and environmental issues, as well as shortages of skilled workers and the need to improve productivity at construction sites, the company will expand its products and promote the provision of services compatible with BIM/CIM.」

    The new plan brings together, for the first time as individual initiatives, the digitalisation of design and construction management, DX, services using digital technologies and BIM/CIM compatibility.
Moved together

"Product Technology Development and Quality Enhancement" moved the same way as this thread, in the same document, in 14 of its 17 moves.

141312111110★123456
  1. ★This thread
  2. 1Product Technology Development and Quality Enhancement14×
  3. 2Development of Construction Methods and Improvement of Construction Quality13×
  4. 3Addressing the Aging of Social Infrastructure12×
  5. 4Expansion into Sewerage Diagnostics and Renewal, Real Estate, and Environmental-Related Fields11×
  6. 5Development and Growth of the Environment and Energy Business11×
  7. 6Expansion of Business Areas and Differentiation through Sales and Core Technologies10×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Nippon Hume yet. It last moved in the Results of 2026-08-07: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Digitalization of Design and Construction Management, BIM/CIM, and Value-Added Services | Nippon Hume Corporation (5262) | Komori