Construction Quality and Contract Nonconformity Liability Risk
First written in FY2022. 3 of 4 entries say "Mitigated", first in FY2026. Latest entry: 2026-10-22.
The whole theme swung hardest in 2026: 7 of 39 companies on the "Worse" side.
9 other companies' latest entry also says "Mitigated".
- 2026-10-22MitigatedEarnings presentation
「大工育成と確かな施工品質の確保を目的として株式会社セレ工務店(100%出資の連結子会社) を2026年7月1日付で新規設立しました。」
施工子会社の設立目的を大工育成と施工品質の確保として明示し、品質・契約不適合リスクへの対応を具体化している。 - FY2027-H1MitigatedAnnual report
「The Construction Company worked to improve holidays and working hours at construction sites, including those of subcontractors, and promoted shorter construction periods, improved construction quality and safety measures.」
The company is continuing to address quality and contractual non-conformity risks by improving working conditions, including for subcontractors, shortening construction periods, improving construction quality and implementing safety measures. - FY2026MitigatedAnnual report
「The Group continuously establishes and enforces quality-related rules and manuals and conducts training. It also assigns dedicated internal control personnel to the Design Company, Construction Company and Chiba Factory Company, working to improve the effectiveness of quality control at each stage and prevent recurrence.」
The company has assigned dedicated internal control personnel to the Design, Construction and Chiba Factory companies, strengthening its quality control and recurrence-prevention systems. - FY2022First statedAnnual report
「The Group takes every precaution to ensure quality. However, if liabilities for non-conformity of contracts or other issues beyond the anticipated scope arise, substantial costs may be incurred and the Group's reputation may be significantly damaged, potentially affecting the Group's performance.」
The company lists self-inspections, in-process inspections, external inspections, client inspections and regulatory inspections as countermeasures.