Komori
ENEOS Holdings (5020) · InitiativeAdvanced

Development and Utilization of Renewable Energy Generation Assets

First written in FY2018. 12 of 15 entries say "Advanced", first in FY2019. Latest entry: 2026-08-07.

15entries
9years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2019 – FY20252018: 120182019: 120192020: 120202021: 220212022: 220222023: 120232024: 220242025: 220252026: 32026
Same theme, other companies
Expanding the Solar, Wind and Biomass Power PortfolioA theme 31 companies write about · 0 as a headwind · 38 as a tailwind

The whole theme swung hardest in 2025: 2 of 20 companies on the "Worse" side.

19 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 31 companies compared. The sentences above are computed from all 31.
Full recordFilings, disclosures and news, newest first
  1. 2026-08-07AdvancedEarnings

    「In the renewable energy business, although generation increased as new solar power plants commenced operations, profit and loss were broadly in line with the same period of the previous year because of unfavorable weather conditions.」

    New solar power plants commenced operations, confirming an increase in renewable energy generation.
  2. FY2026AdvancedAnnual report

    「Specifically, we commenced operations at a total of 14 wind and solar power plants. We are also promoting the installation of batteries alongside solar power plants to reduce the risk of output curtailment and ensure a stable supply of renewable energy, and have commenced operations at a total of 5 such facilities.」

    Progress was made toward commencing operations at 14 renewable power plants and 5 facilities with co-located battery storage. Meanwhile, impairment losses associated with the cancellation of development at certain projects continued.
  3. 2026-05-14AdvancedEarnings

    「Specifically, we commenced operations at a total of 14 wind and solar power plants. We are also promoting the installation of batteries alongside solar power plants to reduce the risk of output curtailment and ensure a stable supply of renewable energy, and have commenced operations at a total of 5 such facilities.」

    Progress was made from commencing operations at renewable energy power plants to commencing operations at co-located battery facilities designed to reduce the risk of output curtailment.
  4. FY2026-H1New power plant operations alongside impairment losses from cancelled development projectsAnnual report

    「Renewable power generation increased as new solar and onshore wind plants came online, but profit declined year on year due to the recognition of impairment losses and other charges associated with the cancellation of development at certain projects.」

    Power generation increased as new solar and onshore wind plants came online, while profit declined due to impairment losses and other charges associated with the cancellation of development at certain projects.
  5. FY2025AdvancedAnnual report

    「More specifically, the company began operating a total of 12 onshore wind and solar power plants.」

    The renewable energy business progressed to the start of operations at 12 sites, including multiple projects that newly commenced operations.
  6. FY2025-H1AdvancedAnnual report

    「In the renewable energy business, generation increased as multiple solar and onshore wind projects began operations. However, the impact of operating stoppages caused by unfavorable weather, the earthquake disaster and equipment abnormalities meant that earnings were broadly in line with the same period of the previous year.」

    In the renewable energy business, multiple solar and onshore wind projects began operations, increasing power generation.
  7. FY2024AdvancedAnnual report

    「The company began operating a total of 11 wind and solar power plants in Japan and overseas. In addition, a project company represented by the group was selected as the operator for offshore wind power projects off Happo Town and Noshiro City in Akita Prefecture.」

    The renewable energy business progressed to the start of operations at 11 sites, the selection of the Happo-Noshiro offshore wind project, and generation capacity of 1.241 million kW as of the end of March 2024.
  8. FY2023AdvancedAnnual report

    「As a result of these business activities, the company secured total generation capacity of approximately 1.25 million kW, including facilities under construction, and achieved its target of total renewable energy generation capacity of 1 million kW in Japan and overseas by the end of fiscal 2022.」

    Total renewable energy generation capacity increased from approximately 1.22 million kW to approximately 1.25 million kW, and business and asset integration with JRE also progressed.
  9. FY2022AdvancedAnnual report

    「As a result of these initiatives, total generation capacity from renewable energy in Japan and overseas, including facilities under construction, was approximately 1.22 million kW as of the end of the fiscal year.」

    Total renewable energy generation capacity reached approximately 1.22 million kW, exceeding the target level of more than 1 million kW at the end of fiscal 2022.
  10. FY2022-Q3AchievedAnnual report

    「ENEOS株式会社, a subsidiary in the energy segment, entered into an agreement on 11 October 2021 to acquire all shares of Japan Renewable Energy Co., Ltd. (JRE), which is wholly owned by GS Renewable Holdings GK, whose ownership interests are held 75% by an affiliate invested in by The Goldman Sachs Group, Inc. and 25% by an affiliate invested in by the Government of Singapore Investment Corporation. The acquisition was completed on 14 January 2022. As a result, JRE and its subsidiaries became subsidiaries of the company.」

    The acquisition of all shares of JRE to expand the renewable energy business was completed on 14 January 2022, and JRE and its subsidiaries became consolidated subsidiaries.
  11. FY2022-Q2AdvancedAnnual report

    「Following the acquisition of all shares of JRE, ENEOS's total generation capacity from renewable energy facilities in operation or under construction in Japan and overseas will be approximately 1.22 million kW (as of September 2021). Going forward, ENEOS aims to become Japan's leading renewable energy company by combining the expertise it has developed as an energy company with JRE's business development capabilities.」

    For the renewable energy business, the company signed an agreement to acquire all shares of JRE and indicated that total generation capacity in operation or under construction after the acquisition was expected to be approximately 1.22 million kW. The acquisition was scheduled to close in late January 2022.
  12. FY2021AdvancedAnnual report

    「The company began commercial operation of the Muroran Biomass Power Plant, one of the largest domestic biomass power plants. It also agreed to consider jointly developing a large-scale biomass power project with eREX Co.,Ltd.」

    The renewable energy business progressed to the start of commercial operation at the Muroran Biomass Power Plant and consideration of jointly developing a large-scale project.
  13. FY2020AdvancedAnnual report

    「The company participated in one of Taiwan's largest offshore wind power projects and entered into a business and capital alliance with リニューアブル・ジャパン株式会社.」

    In the renewable energy business, the company progressed to participating in an offshore wind power project in Taiwan and entering into a business and capital alliance with リニューアブル・ジャパン.
  14. FY2019AdvancedAnnual report

    「In the renewable energy business, the company established a specialized organization to develop the business flexibly and decided to participate in Taiwan's largest offshore wind power project to gain expertise in offshore wind power generation, which offers substantial development potential worldwide.」

    The company progressed to establishing a specialized renewable energy organization and deciding to participate in an offshore wind power project in Taiwan.
  15. FY2018First statedAnnual report

    「In the renewable energy business, the company is engaged in power generation using solar and wind power. In August 2017, it began construction of an environmentally friendly power plant fueled by woody biomass in Muroran.」

    In addition to solar and wind power, the company began construction of a woody biomass power plant, giving concrete form to the development and utilization of renewable energy sources.
Moved together

"Review of the Upstream Portfolio Through Selectivity and Focus" moved the same way as this thread, in the same document, in 8 of its 15 moves.

877777★123456
  1. ★This thread
  2. 1Review of the Upstream Portfolio Through Selectivity and Focus8×
  3. 2Flexible Capital Policy Through Share Repurchases7×
  4. 3Policy of continuing stable dividends while reflecting consolidated performance7×
  5. 4Significant interest-bearing debt and constraints on financial flexibility7×
  6. 5Portfolio Transformation toward Growth and Core Businesses under the 2040 Long-Term Vision7×
  7. 6JX Group-Wide Internal Control and Compliance Framework7×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for ENEOS Holdings yet. It last moved in the Earnings of 2026-08-07: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Development and Utilization of Renewable Energy Generation Assets | ENEOS Holdings,Inc. (5020) | Komori