Zero CO2 Emissions at Niigata Plant

First written in FY2022. 2 of 4 entries say "Advanced", first in FY2023. Latest entry: FY2026.

4entries
5years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2022AdvancedFY2023 – FY20262022: 120222023: 120232024: 020242025: 120252026: 12026
Same theme, other companies
Calculation of GHG emissions (Scope 1–3), setting reduction targets, and procuring renewable energyA theme 1103 companies write about · 10 as a headwind · 1160 as a tailwind

The whole theme swung hardest in 2018: 1 of 6 companies on the "Worse" side.

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 191 companies compared. The sentences above are computed from all 191.Comparing 200 of the theme's 1171 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「From November 2024, we switched all gas used at the Niigata Plant to carbon-neutral (CN) gas. At the Kumamoto Business Office, which was established in November 2025, CO2 emissions were effectively zero through the use of electricity from renewable sources and other measures. As a result, we achieved target a above in the fiscal year ending March 2025 and target b above in the fiscal year ending March 2026.」

    The company states that it achieved its targets of reducing domestic Scope 1 and 2 emissions by 35% in the fiscal year ended March 2025 and by 46% in the fiscal year ended March 2026. Scope 1 emissions at the Niigata Plant have fallen to zero, but the target of zero CO2 emissions across the Niigata Plant, including Scope 2 and other emissions, remains in place.
  2. FY2025RaisedAnnual report

    「a. Reduce domestic Scope 1 and 2 emissions by 35% by the fiscal year ending March 2027 (base year: fiscal year ended March 2014) b. Reduce domestic Scope 1 and 2 emissions by 46% by the fiscal year ending March 2031 Achieve “Zero CO2” by offsetting Scope 1 and 2 emissions from the Niigata Plant to zero c. Achieve carbon neutrality for domestic Scope 1 and 2 emissions by the fiscal year ending March 2051」

    In addition to the previous Zero CO2 target for the Niigata Plant, the company expanded the scope and time horizon to include a 35% reduction by 2027, a 46% reduction by 2031, and carbon neutrality for domestic Scope 1 and 2 emissions by 2051. The company states that the 2027 target was achieved in the fiscal year ending March 2025 through the switch to carbon-neutral gas in November 2024.
  3. FY2023AdvancedAnnual report

    「Achieve “Zero CO2” by offsetting Scope 1 and 2 emissions from the Niigata Plant to zero by the fiscal year ending March 2031」

    For the Niigata Plant, combined Scope 1 and 2 emissions for the fiscal year ended March 2023 were 606t-CO2, and totaled 539t-CO2 after deducting 67t of offsets. Solar power generation equipment was also installed at the Niigata Plant at a cost of ¥54 million.
  4. FY2022First statedAnnual report

    「To address climate change risks, we established “Zero CO2” at the Niigata Plant as a specific CO2 reduction target. We aim to offset the entire annual CO2 emissions generated at the Niigata Plant by the fiscal year ending March 2031.」

    The company has disclosed for the first time a climate change target with a quantified target, deadline and means: offsetting all annual CO2 emissions from the Niigata Plant by the fiscal year ending March 2031.
Moved together

"Balancing Stable Dividends with Retained Earnings and Business Investment" moved the same way as this thread, in the same document, in 3 of its 4 moves.

333332★123456
  1. ★This thread
  2. 1Balancing Stable Dividends with Retained Earnings and Business Investment3×
  3. 2Earnings Base Centered on Overseas Pharmaceutical Sales3×
  4. 3Advancing Local Overseas Production and Diversifying Production and Supply Systems3×
  5. 4Postponement of plans to construct and renovate research institute facilities3×
  6. 5Establishment of a semiconductor-related research and manufacturing site in Kumamoto Prefecture3×
  7. 6Strengthening the Sales Network and Overseas Sales Operations Through Overseas Subsidiaries2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Jcu's next results are scheduled for 2026-11-05. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.