Komori
Air Water (4088) · InitiativeAdvanced

Expansion of power generation operations tailored to regional characteristics

First written in FY2016. 10 of 20 entries say "Advanced", first in FY2017-Q1. Latest entry: FY2026.

20entries
11years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2018-Q1 – FY2018AchievedFY2021-Q3 – FY2021AdvancedFY2023-Q3 – FY2024-Q3RestatedFY2025-H12016: 320162017: 220172018: 120182019: 220192020: 420202021: 220212022: 120222023: 220232024: 220242025: 020252026: 12026
Same theme, other companies
Expansion of power generation operations tailored to regional characteristicsA theme 3 companies write about · 0 as a headwind · 4 as a tailwind

1 other company's latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「In the power business, the procurement price of PKS (palm kernel shells), the main fuel for the Onahama Biomass Power Plant, remained low, while stable operations were maintained with no unplanned shutdowns.」

    For the power generation business, the company disclosed a specific record of stable operations, with no unplanned shutdowns, in addition to stable PKS procurement prices.
  2. FY2025-H1RestatedAnnual report

    「Nihonkai Suisan Co., Ltd. reported higher revenue and operating profit than in the same period of the previous year as sales volumes of industrial salt recovered, the Kanda biomass power plant, which began commercial operation in August 2023, operated steadily, and water-treatment construction-related business performed well. In the power business, operating profit at the Onahama biomass power plant exceeded the previous year's level, helped by stable PKS prices and cost-reduction initiatives.」

    The company continues to explain the benefits of stable operations at the Kanda and Onahama biomass power plants, stable PKS prices and cost reductions.
  3. FY2024-Q3AdvancedAnnual report

    「In the power business, results exceeded those of the same period of the previous year, as marine transportation costs for power generation fuel followed a downward trend and the Kanda Biomass Power Plant (Kanda, Fukuoka) commenced commercial operations in August 2023.」

    The Kanda Biomass Power Plant began commercial operations in August 2023, marking the expansion of the power generation business through a new operating track record.
  4. FY2024-Q1AdvancedAnnual report

    「The Power Business remained on a recovery trend as the Onahama Wood Biomass Dedicated-Fuel Power Plant continued to operate stably, marine transportation costs for power-generation fuels such as PKS (palm kernel shells) and wood pellets declined along with the downturn in shipping market conditions, and measures to ease vessel congestion at unloading port facilities made progress.」

    It explains that the power generation business entered a recovery phase as a result of stable operations at the Onahama Power Station, lower marine transportation costs for fuel, and progress in measures to reduce demurrage.
  5. FY2023-Q3AchievedAnnual report

    「The acquisition and transfer were completed on 18 January 2023. As a result, AWEP Yamaguchi became a wholly owned subsidiary of Chugoku Electric Power, while AWEP Onahama became a wholly owned subsidiary of the Company.」

    For the Hofu and Onahama biomass power generation businesses, the transfer of AWEP Yamaguchi shares and acquisition of AWEP Onahama shares were completed on 18 January 2023, progressing from the planning stage in the previous filing to completion.
  6. FY2023-Q2ReframedAnnual report

    「The Company will transfer to Chugoku Electric Power its 51% stake in AWEP Yamaguchi, which it owns, and acquire from Chugoku Electric Power its 49% stake in AWEP Onahama. As a result, AWEP Yamaguchi will become a wholly owned subsidiary of Chugoku Electric Power, and AWEP Onahama will become a wholly owned subsidiary of the Company.」

    Regarding the biomass power generation businesses in Hofu and Onahama, the company decided to restructure its power generation business interests, scheduled to be implemented in mid-January 2023, with the stake in the Yamaguchi Power Plant transferred and the Onahama Power Plant changed to a wholly owned subsidiary.
  7. FY2021AdvancedAnnual report

    「In addition to the 2 woody biomass power plants that newly began operations in 2021, Ako No. 2 and Onahama, improved profitability in the chemical-related, medical-related lifestyle healthcare, and agriculture and food-related businesses, which had progressed through the previous fiscal year, is expected to contribute to earnings growth.」

    The company states that the two wood biomass power plants, Ako No. 2 and Onahama, began operations in 2021, confirming the expansion of the power generation business at the operating stage.
  8. FY2021-Q3AchievedAnnual report

    「The Akō No. 2 Biomass Power Plant, which had been under construction, began commercial operations on 2 January 2021 and is operating smoothly.」

    The Akō No. 2 Biomass Power Plant, which had been under construction, commenced commercial operations on 2 January 2021, bringing a concrete plan to expand the power generation business into operation.
  9. FY2021-Q2RestatedAnnual report

    「In the other businesses, stable operations continued at the woody biomass and coal co-fired power plant in Hofu, Yamaguchi Prefecture. However, profit was lower than in the same period of the previous year due to a planned shutdown for periodic inspections.」

    While stable operations continued at the Hofu Biomass and Coal Co-firing Power Plant, planned shutdowns for periodic inspections affected profit.
  10. FY2021-Q1AdvancedAnnual report

    「Construction of the Ako No. 2 Biomass Power Plant, scheduled to begin operations in October this year, progressed smoothly as planned.」

    Regarding the power generation business, it was disclosed that the Akō No. 2 Biomass Power Plant was under construction as planned toward its scheduled start of operations in October 2020.
  11. FY2020AdvancedAnnual report

    「The construction plan for a dedicated wood biomass power plant in Iwaki, Fukushima Prefecture, targeted to begin operations in April 2021, also progressed steadily.」

    In the power generation business, construction is under way on a dedicated woody biomass power plant in Iwaki, Fukushima Prefecture, targeted to begin operations in April 2021, in addition to the stable operation of the Hofu Power Plant. The disclosure indicates that the plan is progressing.
  12. FY2020-Q3RestatedAnnual report

    「The power business performed steadily, with stable operations continuing at the Hofu Biomass and Coal Co-fired Power Plant, which began operating in July last year.」

    The company continues to confirm the stable operation of the Hofu biomass and coal co-fired power plant and its contribution to performance.
  13. FY2020-Q2AdvancedAnnual report

    「The Power business progressed smoothly as stable operations continued at the Hofu biomass and coal co-fired power plant, which began operations in July this year.」

    The Hofu biomass and coal co-fired power plant began operations in July this year, and stable operations have continued. The start of monetization of the power generation business is also included in the explanation of overall performance.
  14. FY2020-Q1RestatedAnnual report

    「The environmental business performed weakly due to lower sales of magnesium hydroxide, but the food business, centered on nori seaweed, and the wood biomass power generation business performed solidly and offset the impact.」

    The company explained that continuing power-generation businesses tailored to regional characteristics, including woody biomass power generation, complemented the performance of the seawater-related business.
  15. FY2018AdvancedAnnual report

    「Total capital expenditure for the consolidated fiscal year, including intangible assets, was ¥61.309 billion. Major projects included a cryogenic air separation plant constructed in Kakogawa, Hyogo Prefecture, in the industrial gases business, a biomass and coal co-fired power plant under construction in Hofu, Yamaguchi Prefecture, and a biomass power plant under construction in Ako, Hyogo Prefecture, in the other businesses.」

    In the power generation business, construction of the Hofu biomass and coal co-fired power plant and the Ako biomass power plant was advanced, with total capital investment of ¥61.309 billion recorded.
  16. FY2018-Q1AdvancedAnnual report

    「㈱日本海水 Ako Plant (Ako, Hyogo) Other Power generation equipment 10,000 First half of FY2020」

    The plan to construct new power-generation facilities at the Ako Plant of Nihon Kaisui, with a planned investment of ¥10 billion, has been finalized, with completion scheduled for the first half of fiscal 2020.
  17. FY2017RestatedAnnual report

    「In addition, the wood biomass power generation business operated smoothly throughout the year and contributed to performance.」

    The stable operation of the woody biomass power generation business and its contribution to operating performance have been confirmed for the full fiscal year.
  18. FY2017-Q2RestatedAnnual report

    「The wood biomass power plant constructed at the Ako Plant also began operating smoothly and contributed to results.」

    The operation of the wood biomass power generation business and its contribution to results continue to be reported, as in the previous quarter.
  19. FY2017-Q1AdvancedAnnual report

    「In addition, the wood biomass power plant constructed at the Ako Plant began operating smoothly and contributed to performance.」

    Wood biomass power generation began operations, and its contribution to business performance has also been disclosed.
  20. FY2016First statedAnnual report

    「As businesses expected to drive the group's next phase of growth, the company will accelerate power-generation initiatives tailored to the characteristics of each region, including woody biomass and coal-fired power generation, while further expanding overseas operations and pursuing structural reform of the logistics business.」

    The company positions power generation, including wood biomass and coal-fired power, as a next-generation growth business.
Moved together

"A comprehensive healthcare model covering everything from advanced medical care to everyday healthcare" moved the same way as this thread, in the same document, in 12 of its 20 moves.

1298876★123456
  1. ★This thread
  2. 1A comprehensive healthcare model covering everything from advanced medical care to everyday healthcare12×
  3. 2Structural Reform of the Logistics Business9×
  4. 3Strengthening the Earning Power of the Energy and Chemicals Business8×
  5. 4Strengthening the supply chain from cultivation through sourcing, processing and sales8×
  6. 5Deepening regional coverage and strengthening the earnings base of the domestic industrial gas business7×
  7. 6Research and development through cross-functional collaboration between the business and research divisions6×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Air Water yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.