Komori
BroadBand Tower (3776) · InitiativeDecline in new-site revenue due to cancellations of reserved racks

Opening of a new 5G- and IoT-enabled Internet data center

First written in FY2016-Q4. 15 of 21 entries say "Advanced", first in FY2017. Latest entry: FY2026-H1.

21entries
10years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2017 – FY2022-Q2RestatedFY2023-Q3 – FY2026-H12017: 320172018: 420182019: 320192020: 220202021: 220212022: 320222023: 320232024: 020242025: 020252026: 12026
Same theme, other companies
Creating new value and expanding existing businesses centered on the data center businessA theme 2 companies write about · 0 as a headwind · 3 as a tailwind

0 other companies' latest entry also says "Other".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026-H1Decline in new-site revenue due to cancellations of reserved racksAnnual report

    「However, sales declined because some customers cancelled part of their reserved rack space following revisions to their usage plans, and the replacement of that space remains in progress.」

    In data center operations, including the new Otemachi site, some reserved rack space was cancelled, and replacement of the space remains in progress.
  2. FY2023-Q3RestatedAnnual report

    「At the new Otemachi site, whose contract rate had exceeded 90% as of the end of June 2022, utilization continued to rise and exceeded 66% as of the end of September 2023.」

    The new Otemachi site continues to operate at a contracted rate of more than 90% and an operating rate of more than 66%.
  3. FY2023-Q1AdvancedAnnual report

    「At the New Otemachi Site, the contract rate exceeded approximately 90% and the utilization rate was approximately 66% at the end of March this year (2023), resulting in higher sales.」

    At the new Otemachi site, which supports 5G and IoT, the contracted rate has remained at approximately 90% or higher, while the operating rate rose to approximately 66%.
  4. FY2022AdvancedAnnual report

    「At the data center, the new Otemachi site had a contract rate of approximately 90% or higher and a utilization rate of approximately 62% as of the end of December 2022, resulting in higher sales throughout the year.」

    The contracted rate at the new Otemachi site exceeded 90%, while the operating rate rose to approximately 62% from approximately 60% previously.
  5. FY2022-Q3RestatedAnnual report

    「At the data center, the new Otemachi site had a contract rate above 90% and a utilization rate of approximately 60% as of the end of September this year (2022), resulting in higher sales.」

    At the new Otemachi site, which supports 5G and IoT, the contracted rate has remained above 90% and the operating rate at approximately 60%.
  6. FY2022-Q2AdvancedAnnual report

    「At the data centers, the contracted capacity rate at the new Otemachi site exceeded 90% and the utilization rate was approximately 60% at the end of June this year (2022), resulting in higher revenue.」

    At the new Otemachi site, which supports 5G and IoT, the contracted rate rose to more than 90%, while the operating rate has remained at approximately 60%.
  7. FY2022-Q1AdvancedAnnual report

    「At the data center, the new Otemachi site had a contract rate of approximately 75% and a utilization rate of approximately 60% as of the end of March this year (2022), resulting in higher sales.」

    At the new Otemachi site, which supports 5G and IoT, the operating rate was approximately 60% at the end of March 2022, improving from more than 45% previously. The contracted rate has remained at approximately 75%.
  8. FY2021-Q1AdvancedAnnual report

    「At the data center, the contract rate at the new Otemachi site was approximately 75% as of the end of March 2021, and the utilization rate exceeded 45%, resulting in higher sales.」

    The new Otemachi site, which supports 5G and IoT, had a contracted rate of approximately 75% and an operating rate of more than 45% at the end of March 2021.
  9. FY2020AdvancedAnnual report

    「At the data center, the contract rate at the new Otemachi site exceeded 70% as of the end of December 2020, and the utilization rate was approximately 45%, resulting in higher sales.」

    At the new Otemachi site, which supports 5G and IoT, the operating rate rose to approximately 45%, in addition to a contracted rate of more than 70%.
  10. FY2020-Q3AdvancedAnnual report

    「At the data centers, the contract rate at the new data center in Otemachi exceeded 70% at the end of September this year (2020), while the utilization rate was approximately 35%. In March this year, we also began inter-data-center connectivity with 株式会社アット東京 to enhance the value of using the new data center.」

    The new Otemachi data center, which supports 5G and IoT, reached a contracted rate of more than 70% and an operating rate of approximately 35%, and is progressing toward the start of inter-data-center connectivity with AT TOKYO.
  11. FY2020-Q1AdvancedAnnual report

    「At the data center, the contract rate at the new Otemachi data center exceeded approximately 70% and the utilization rate exceeded 30% at the end of March this year (2020). In March this year, the company began interconnecting its data center with that of AT TOKYO CORPORATION, which had been preparing to enhance the value of the new data center.」

    The new Otemachi data center, which supports 5G and IoT, reached a contracted rate of approximately 70% and an operating rate of more than 30%, and progressed to the stage of initiating inter-data-center connectivity with AT TOKYO.
  12. FY2019-Q3AdvancedAnnual report

    「In January of this year (2019), we made 株式会社ティエスエスリンク a subsidiary through a share exchange to expand our service platform, and in September completed Phase 2 construction of our new data center.」

    Phase 2 construction of the new Otemachi data center, which supports 5G and IoT, was completed in September 2019, marking the completion of one stage of the planned facility development.
  13. FY2019-Q2AdvancedAnnual report

    「At the data center, construction of Phase 2 of the new Otemachi data center is under way. Once Phase 2 is complete, the entire new data center will have capacity for approximately 750 racks. As of the end of June this year, the contract rate for the 750 racks was approximately 70%, and customer use has expanded to CASE (Note) and AI applications.」

    The new 5G- and IoT-enabled Otemachi data center continued Phase 2 construction, and the contract rate for approximately 750 racks reached approximately 70%. The Company also disclosed expanded use for CASE and AI applications.
  14. FY2019-Q1AdvancedAnnual report

    「At the data center, construction of Phase 2 of the new data center, which began operations in September last year (2018), has commenced, partly because a large order was secured. Following completion of Phase 2, the new data center as a whole will have approximately 750 racks available for installation, and the contract ratio for the 750 racks was approximately 40% as of the end of March this year.」

    The new 5G- and IoT-enabled Otemachi data center proceeded to Phase 2 construction following a large order, with plans for approximately 750 racks and a contract rate of approximately 40%.
  15. FY2018-Q3AdvancedAnnual report

    「At the end of August this year, the company opened a new data center in Otemachi compatible with next-generation information and communications infrastructure serving IoT applications such as 5G (fifth-generation mobile communications systems), and began operations in September.」

    The new Otemachi data center began operations in September following its opening. In response to inquiries from customers, the Company is also advancing negotiations to secure orders.
  16. FY2018AdvancedAnnual report

    「Filing company New Otemachi site Computer Platform Business Data center building, air-conditioning and electrical equipment, etc. (Phase 2 construction) ¥2,500 million Borrowings February 2019 September 2019」

    For the new Otemachi site, which has already begun operations, the Company plans Phase 2 construction at a total cost of ¥2.5 billion, scheduled for completion in September 2019, financed through borrowings.
  17. FY2018AchievedAnnual report

    「In addition, as a pioneer in dedicated Internet data centers, the Company will open a new Internet data center in Otemachi in August of this year, supporting next-generation information and communications infrastructure designed for IoT use, including 5G (fifth-generation mobile communications systems).」

    The new 5G- and IoT-enabled data center in Otemachi, scheduled to open in August 2018, was opened.
  18. FY2018-Q1AdvancedAnnual report

    「In March of this year, the Company entered into a committed syndicated loan agreement totaling ¥4 billion with 5 transaction banks and other lenders to secure flexible financing for the funding needs associated with investment in the new data center scheduled to open in August of this year.」

    For the new data center scheduled to open in August 2018, the Company entered into a committed syndicated loan agreement totaling ¥4 billion with 5 lenders, establishing a specific means of financing the investment.
  19. FY2017AdvancedAnnual report

    「5GなどIoTを利用対象とする情報通信インフラに対応した新インターネットデータセンターの開設を平成30年8月に予定しており、準備を進めております。」

    The planned opening date of August 2018 was specified for the new data center.
  20. FY2017-Q1RestatedAnnual report

    「As a pioneer in dedicated internet data centers, the company is also preparing to open a new internet data center capable of supporting information and communications infrastructure using IoT, including 5G mobile services.」

    The Company has continued preparations to open a new Internet data center designed for IoT use, including 5G mobile communications.
  21. FY2016-Q4First statedAnnual report

    「As a pioneer in dedicated Internet data centers, the Company has begun preparations to open a new Internet data center capable of supporting information and communications infrastructure using IoT, including 5G mobile communications.」

    The Company has for the first time disclosed the commencement of preparations to open a new Internet data center supporting information and communications infrastructure designed for IoT use, including 5G mobile communications.
Moved together

"データセンター・クラウド・データソリューションの既存事業強化" moved the same way as this thread, in the same document, in 14 of its 20 moves.

14127755★123456
  1. ★This thread
  2. 1データセンター・クラウド・データソリューションの既存事業強化14×
  3. 2Strengthening Collaboration with the CATV Business by Making Japan CableCast a Subsidiary12×
  4. 3Planned annual dividend of ¥2 for the next fiscal year7×
  5. 4Allocation of shares to directors as restricted stock compensation7×
  6. 5Service expansion using artificial intelligence and natural language processing technologies5×
  7. 6Expansion into natural language processing, drug discovery, and multilingual communication5×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
BroadBand Tower's next results are scheduled for 2026-10-30. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.