Komori
Matsuoka (3611) · InitiativeAdvanced

Higher productivity through the introduction of new equipment, including IoT and automated cutting machines

First written in FY2019. 10 of 19 entries say "Advanced", first in FY2024-Q3. Latest entry: 2026-11-12.

19entries
8years
10from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2019 – FY2020AdvancedFY2024-Q3 – 2026-05-142019: 320192020: 220202021: 020212022: 020222023: 020232024: 220242025: 120252026: 112026
Same theme, other companies
Expansion of Smart Factories Centered on a Production Management SystemA theme 18 companies write about · 0 as a headwind · 18 as a tailwind

The whole theme swung hardest in 2024: 1 of 9 companies on the "Worse" side.

11 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 18 companies compared. The sentences above are computed from all 18.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「While continuing to advance quality, cost and delivery performance, the Company will promote smart-factory transformation through the introduction of MES (manufacturing execution systems) and ERP (enterprise resource planning systems), thereby enhancing production management and visualizing shop-floor operations.」

    The previous measures involving equipment installation and data digitization have been made more concrete through the introduction of MES and ERP, smart-factory transformation, enhanced production management and shop-floor visualization.
  2. FY2025AdvancedAnnual report

    「The Group is considering expanding system investment further to advance its transformation into a smart factory. System investment aimed at accelerating the full-scale transformation into smart factories, promoting visualization at plants, and improving productivity through stronger coordination with headquarters is viewed as one of the pillars of the next medium-term management plan.」

    The previous measures involving equipment installation and productivity improvement have been expanded into system investment covering smart-factory transformation, plant visualization and coordination with headquarters, and are being considered as one of the pillars of the next medium-term management plan.
  3. FY2024AdvancedAnnual report

    「The Company introduced equipment that contributes to higher productivity and production efficiency by digitizing and visualizing data, and used it to build efficient production lines.」

    At the second-phase plant of ISHWARDI in Bangladesh, the Company introduced equipment that supports the digitization and visualization of productivity and production-efficiency data and used it to build production lines.
  4. FY2024-Q3AdvancedAnnual report

    「The introduction of machinery and equipment that contributes to higher productivity and quality contributed to improved production efficiency and higher profit margins.」

    Machinery and equipment were introduced to improve productivity and quality, and their contribution to higher production efficiency and profit margins was described.
  5. FY2020RestatedAnnual report

    「The Company will work to improve productivity by leveraging IoT technology and introducing new equipment, including automated cutting machines (CAM), standing sewing machines and hanger systems.」

    Measures to improve productivity through the introduction of new equipment, including IoT, automated cutting machines, standing sewing machines and hanger systems, continued to be described for the full fiscal year.
  6. FY2020-Q3RestatedAnnual report

    「The Company focused on improving productivity and reducing costs by proceeding with the introduction of new equipment to further strengthen and improve the efficiency of its production system, among other measures.」

    Measures to improve the efficiency of the production system, productivity and costs through the introduction of new equipment continue to be described. No completion of equipment installation or new numerical targets were presented.
  7. FY2020-Q2RestatedAnnual report

    「The Company proceeded with the introduction of new equipment to improve efficiency」

    The introduction of new equipment to improve the efficiency of the production system continues to be described, but no new specific information was presented regarding the types of equipment or completion of their installation.
  8. FY2020-Q1RestatedAnnual report

    「The Company proceeded with the introduction of new equipment to strengthen and improve the efficiency of its production system」

    Measures to improve productivity through the introduction of new equipment continue to be described, but no new specific information was presented during the quarter regarding the types of equipment or completion of their installation.
  9. FY2019First statedAnnual report

    「The Company will work to improve productivity by leveraging IoT technology and introducing new equipment, including automated cutting machines (CAM), standing sewing machines and hanger systems.」

    The introduction of IoT, automated cutting machines, standing sewing machines and hanger systems was specifically presented as a means of addressing labor shortages, rising labor costs and the shift toward a wider variety of products in small lots.
Moved together

"Expansion of production capacity and production sites, primarily in Vietnam" moved the same way as this thread, in the same document, in 8 of its 16 moves.

887766★123456
  1. ★This thread
  2. 1Expansion of production capacity and production sites, primarily in Vietnam8×
  3. 2Sales and profit results for the third quarter of the 62nd fiscal year8×
  4. 3Cash flow from operating activities and cash balance7×
  5. 4Optimization of production sites, reduced dependence on China and expansion in ASEAN7×
  6. 5Increase in net assets and capital surplus6×
  7. 6Deteriorating profitability at some factories due to insufficient orders6×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Matsuoka's next results are scheduled for 2026-11-12. Read the earnings preview It last moved in the Financial results presentation of 2026-11-12: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.