Miyaji Engineering Group (3431) · RiskRevenue decline due to the reaction to concentrated construction at MMBLatest Earnings (2026-08-06): "Worsened"

Revenue Fluctuations Due to Timing Differences Between Fiscal Periods and Delays in Construction Progress

First written in FY2017-Q3. 13 of 24 entries say "Mitigated", first in FY2019-Q1. Latest entry: 2026-08-06.

24entries
10years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseMaterialisedFY2017-Q3 – FY2017MitigatedFY2019-Q1 – FY2020MitigatedFY2024-Q1 – FY2025-H12017: 220172018: 220182019: 320192020: 220202021: 420212022: 320222023: 420232024: 120242025: 120252026: 22026
Same theme, other companies
Delayed revenue recognition due to delays in starting constructionA theme 46 companies write about · 50 as a headwind · 0 as a tailwind

Miyaji Engineering Group moved to the "Worse" side of this theme in 2026, 7 years after the typical company in this theme (2019).

The whole theme swung hardest in 2026: 10 of 22 companies on the "Worse" side.

2 other companies' latest entry also says "Worsened".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 46 companies compared. The sentences above are computed from all 46.
Full recordFilings, disclosures and news, newest first
  1. FY2026-H1Revenue decline due to the reaction to concentrated construction at MMBAnnual report

    「Revenue was ¥28.307 billion, down 21.6% year on year, mainly because revenue from concentrated construction work and other factors in MMB's large-scale renewal and maintenance-related business had been substantial in the same period of the previous year, while there were no similar projects this fiscal year.」

    Consolidated revenue fell 21.6% year on year, reflecting the absence this fiscal year of the concentrated construction work that had generated revenue at MMB in the same period of the previous year, as well as the absence of similar projects.
  2. FY2025-H1MitigatedAnnual report

    「Revenue was ¥36.1 billion, up 13.9% year on year, as large-scale renewal projects and other major projects progressed smoothly.」

    Large-scale renewal projects and major projects progressed smoothly, and revenue increased 13.9% year on year. No revenue decline due to timing shifts or delays in project progress was reported for the interim consolidated accounting period.
  3. FY2024-Q2MitigatedAnnual report

    「Revenue amounted to ¥3,169.4 million, up 13.4% year on year and slightly exceeding the forecast, as large-scale renewal work and other large projects progressed smoothly.」

    Large-scale renewal work and other large projects progressed smoothly, and revenue slightly exceeded the forecast, increasing 13.4% year on year. No revenue decline due to timing shifts or delays in progress was reported.
  4. FY2024-Q1MitigatedAnnual report

    「Revenue amounted to ¥1,568.4 million, up 26.8% year on year, as projects on hand progressed as scheduled.」

    Projects on hand progressed as scheduled, and revenue increased 26.8% year on year. No revenue decline due to timing shifts or delays in progress was reported for this quarter.
  5. FY2023MaterialisedAnnual report

    「Although construction of projects on hand progressed generally smoothly, revenue amounted to ¥6,027.9 million, up 3.9% year on year but well below the initial plan of ¥6.5 billion, as the timing of orders for new projects expected to generate revenue during the year was delayed, plant operations were lower than expected, and progress on large projects scheduled for completion at year-end was carried forward to the following fiscal year.」

    The delayed timing of orders for new projects and the carryover of progress on large projects actually occurred, and revenue fell below the initial plan of ¥6.5 billion.
  6. FY2023-Q3MitigatedAnnual report

    「Revenue amounted to ¥4,380.6 million, up 2.4% year on year, as construction of projects on hand progressed generally smoothly.」

    Construction of projects on hand progressed generally smoothly, and revenue increased 2.4% year on year. No revenue decline due to timing shifts or delays in progress was reported.
  7. FY2023-Q2MitigatedAnnual report

    「Revenue amounted to ¥2,795.1 million, up 6.2% year on year, as large-scale renewal work progressed smoothly.」

    Large-scale renewal work progressed smoothly, and revenue increased 6.2% year on year. No revenue decline due to delays in progress or timing shifts was reported.
  8. FY2023-Q1Revenue decline despite progress as scheduledAnnual report

    「Although projects on hand progressed as scheduled, revenue was ¥1,237.0 million, down 2.8% year on year.」

    Although projects on hand progressed as scheduled, revenue declined 2.8% year on year, indicating a divergence between project progress and revenue trends.
  9. FY2022-Q3MitigatedAnnual report

    「Revenue amounted to ¥4,277.0 million, up 5.0% year on year, as projects on hand progressed generally smoothly.」

    Construction of projects on hand progressed generally smoothly, and revenue increased 5.0% year on year. No revenue decline due to timing shifts or delays in progress was reported.
  10. FY2022-Q2RestatedAnnual report

    「Revenue amounted to ¥2,631.8 million, down 6.1% year on year, despite projects on hand progressing generally as scheduled.」

    Although projects on hand progressed generally as scheduled, revenue declined 6.1% year on year, indicating continued divergence between project progress and revenue fluctuations.
  11. FY2022-Q1Revenue decline despite scheduled progress on projects on handAnnual report

    「Revenue amounted to ¥1,272.9 million, down 8.0% year on year, despite projects on hand progressing as scheduled.」

    Although projects on hand progressed as scheduled, revenue declined 8.0% year on year, indicating that revenue fluctuated even with progress proceeding as planned.
  12. FY2021Revenue decline despite continued progress on projects on handAnnual report

    「Revenue amounted to ¥5,526.8 million, down 13.4% year on year, despite generally smooth progress on projects on hand.」

    Although projects on hand progressed generally smoothly, annual revenue declined 13.4% year on year, partly due to the reaction to the completion of large-scale projects in the previous fiscal year.
  13. FY2021-Q3Revenue decline despite continued progress on projects on handAnnual report

    「Revenue amounted to ¥4,073.9 million, down 12.8% year on year, despite generally smooth progress on projects on hand.」

    Although projects on hand were said to be progressing generally smoothly, revenue declined 12.8% year on year, confirming a fluctuation in revenue. Timing shifts or delays in progress were not cited as causes.
  14. FY2020MitigatedAnnual report

    「Revenue amounted to ¥6,384.1 million, up 22.6% year on year, as construction of projects on hand progressed smoothly.」

    Construction of projects on hand progressed smoothly, and annual revenue increased 22.6% year on year. No revenue decline due to timing shifts or delays in progress was reported.
  15. FY2020-Q3MitigatedAnnual report

    「Revenue amounted to ¥4,670.5 million, up 26.0% year on year, as construction of projects on hand progressed smoothly.」

    Construction of projects on hand progressed smoothly, and revenue increased 26.0% year on year. No revenue decline due to timing shifts or delays in progress was reported.
  16. FY2020-Q2MitigatedAnnual report

    「Revenue amounted to ¥3,017.9 million, up 25.1% year on year, as construction of projects on hand progressed smoothly.」

    Construction of projects on hand progressed smoothly, and revenue increased 25.1% year on year. No revenue decline due to timing shifts or delays in progress was reported.
  17. FY2020-Q1MitigatedAnnual report

    「Revenue amounted to ¥1,514.7 million, up 30.4% year on year, as construction of projects on hand progressed smoothly.」

    Construction of projects on hand progressed smoothly, and revenue increased 30.4% year on year. No revenue decline due to timing shifts or delays in progress was reported for this quarter.
  18. FY2019-Q3MitigatedAnnual report

    「Revenue amounted to ¥3,707.4 million, up 6.8% year on year, as construction of projects on hand progressed generally smoothly.」

    Construction of projects on hand progressed generally smoothly, and revenue increased 6.8% year on year. No revenue decline due to timing shifts was reported.
  19. FY2019-Q2MitigatedAnnual report

    「Revenue amounted to ¥2,412.6 million, up 1.9% year on year, as construction of projects on hand progressed generally smoothly.」

    Construction of projects on hand progressed generally smoothly, and revenue increased 1.9% year on year. No revenue decline due to timing shifts was reported for this quarter.
  20. FY2019-Q1MitigatedAnnual report

    「Revenue amounted to ¥1,161.7 million, up 12.2% year on year, as construction of projects on hand progressed generally smoothly.」

    Construction of projects on hand progressed generally smoothly, and revenue increased 12.2% year on year. No revenue decline due to timing shifts was reported for this quarter.
  21. FY2017MaterialisedAnnual report

    「Revenue amounted to ¥3,629.8 million, down 9.1% year on year, as construction of projects on hand proceeded generally smoothly, but timing shifts occurred for some projects.」

    Timing shifts occurred for some projects during the year, and revenue fell 9.1% year on year.
  22. FY2017-Q3MaterialisedAnnual report

    「Revenue amounted to ¥2,594.4 million, down 13.3% year on year, as construction of projects on hand proceeded generally smoothly, but timing shifts occurred for some projects.」

    It was explained that timing shifts occurred for some projects, resulting in a 13.3% year-on-year decline in revenue.
Moved together

"Occurrence of construction contracts expected to incur losses" moved the same way as this thread, in the same document, in 14 of its 24 moves.

1411101086★123456
  1. ★This thread
  2. 1Occurrence of construction contracts expected to incur losses14×
  3. 2Establishing a Stable Profit-Generating Structure11×
  4. 3Strengthening end-to-end engineering capabilities from design through erection and profitability10×
  5. 4Cost reduction through manufacturing efficiency, joint procurement, and mutual use of technologies10×
  6. 5Expansion of Maintenance and Repair Businesses, Including Large-Scale Renewals and Major Repairs8×
  7. 6Securing Stable Orders by Leveraging Technical Capabilities6×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Miyaji Engineering Group yet. It last moved in the Earnings of 2026-08-06: "Worsened".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Revenue Fluctuations Due to Timing Differences Between Fiscal Periods and Delays in Construction Progress | MIYAJI ENGINEERING GROUP,INC. (3431) | Komori