Order Backlog in the Real Estate, Construction and Related Businesses

First written in FY2021. 2 of 6 entries say "Worsened", first in FY2022. Latest entry: 2026-08-07.

6entries
6years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2021WorsenedFY2022 – FY20232021: 120212022: 120222023: 120232024: 020242025: 020252026: 32026
Same theme, other companies
Changes in Order Intake and Order BacklogA theme 157 companies write about · 29 as a headwind · 112 as a tailwind

Azuma House moved to the "Worse" side of this theme in 2022, 1 year before the typical company in this theme (2023).

The whole theme swung hardest in 2020: 15 of 92 companies on the "Worse" side.

57 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 157 companies compared. The sentences above are computed from all 157.
Full recordFilings, disclosures and news, newest first
  1. 2026-08-07AdvancedFinancial results briefing materials

    「The order backlog was 139.5% of the prior-year level.」

    不動産・建設事業の受注残額が前年を上回る水準となったことを示している。
  2. FY2026AdvancedAnnual report

    「合計 7,809,423千円(前年同期比94.9%) 3,051,126千円(前年同期比119.4%)」

    全体の受注高は前年同期比94.9%となった一方、受注残高は3,051,126千円、前年同期比119.4%へ増加した。
  3. 2026-05-15MitigatedFinancial results briefing materials

    「受注残につきましては、受注残件数及び受注残金額ともに例年通りにまで持ち直すこととなりました。」

    前期まで減少していた不動産・建設事業の受注残について、件数・金額の双方が持ち直したと記載している。資料上の受注残額は前年比133.90%となっている。
  4. FY2023WorsenedAnnual report

    「不動産・建設事業 受注高8,148,956千円(前年同期比90.3%) 受注残高2,743,892千円(前年同期比79.8%) 土地有効活用事業 受注高1,081,504千円(前年同期比104.6%) 受注残高302,928千円(前年同期比109.3%) 合計 9,230,460千円(前年同期比91.7%) 3,046,821千円(前年同期比82.0%)」

    土地有効活用事業の受注高・受注残高は前年同期比で増加したが、全体の受注高は91.7%、受注残高は82.0%となり、合計受注残高は前年の3,714,075千円から3,046,821千円へ減少した。
  5. FY2022WorsenedAnnual report

    「不動産・建設事業 受注高9,026,324千円(前年同期比98.4%) 受注残高3,436,968千円(前年同期比80.6%)、土地有効活用事業 受注高1,034,296千円(前年同期比120.2%) 受注残高277,106千円(前年同期比34.5%)」

    不動産・建設事業と土地有効活用事業の受注高・受注残高を更新した。受注高は合計で前年同期比100.3%だが、受注残高は合計3,714,075千円、前年同期比73.3%へ減少している。
  6. FY2021First statedAnnual report

    「不動産・建設事業 受注高9,174,841千円(前年同期比98.7%) 受注残高4,263,529千円(前年同期比67.4%)、土地有効活用事業 受注高860,343千円(前年同期比76.4%) 受注残高803,452千円(前年同期比101.2%)」

    不動産・建設事業および土地有効活用事業について、通期の受注高・受注残高を初めてテーマとして記録する。合計受注残高は5,066,982千円、前年同期比71.1%となっている。
Moved together

"Concern over rising labor costs" moved the same way as this thread, in the same document, in 4 of its 6 moves.

432222★123456
  1. ★This thread
  2. 1Concern over rising labor costs4×
  3. 2Increase in net assets and equity ratio due to higher retained earnings3×
  4. 3Selling asset-utilization properties and built-for-sale rental housing2×
  5. 4Uncertainty Driven by China’s Economic Slowdown and Lower Crude Oil Prices2×
  6. 5Scale of rental operations involving company-owned and managed properties2×
  7. 6CSR Activities Through Sports Tournament Hosting2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Azuma House yet. It last moved in the Financial results briefing materials of 2026-08-07: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Order Backlog in the Real Estate, Construction and Related Businesses | AZUMA HOUSE Co.,Ltd. (3293) | Komori