How it moved
ProgressHeldSoftenedWorseAdvancedFY2019 – 2026-11-112018: 120182019: 120192020: 120202021: 020212022: 020222023: 120232024: 120242025: 120252026: 12026
Same theme, other companies
Advancing Construction Capabilities and Construction Management Operations through DX and ICTA theme 22 companies write about · 0 as a headwind · 22 as a tailwind

13 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 22 companies compared. The sentences above are computed from all 22.
Full recordFilings, disclosures and news, newest first
  1. 2026-11-11AdvancedEarnings presentation

    「DC向けデジタルツイン※1構築で建設テックのスタートアップ企業・ONESTRUCTIONと協業開始」

    データセンターの熱・気流・PUEを可視化するデジタルツインについて、スタートアップ企業との協業開始を新たに示している。
  2. FY2025AdvancedAnnual report

    「We are introducing technology to build 3D models of site conditions using laser surveying and photogrammetry for field surveys and construction inspections at renovation sites.」

    We apply 3D recording and modelling technologies to surveying renovation sites, preparing CAD drawings, animating the delivery process and construction results, and sharing construction plans with customers.
  3. FY2024AdvancedAnnual report

    「In addition, at the Niigata Branch, completed in March 2024, we established a Meta Studio to use the virtual construction site “Meta Site®,” which connects each construction site with the branch’s command functions in the cloud.」

    In addition to 3D surveying and recording technologies, we have established the virtual construction site “Meta Site” and Meta Studio, applying them to construction progress monitoring and remote technical guidance by experienced personnel.
  4. FY2023AdvancedAnnual report

    「In 2022, with the cooperation of a university, we developed a method for evaluating the surveying accuracy of three-dimensional records. This has enabled us to standardize the quality of three-dimensional models created using the technology. We have also begun developing technology to recognize not only three-dimensional shape models, but also instruments, control valves and other items.」

    For Construction Visualizer 4D, a method for evaluating surveying accuracy was developed, advancing efforts to standardize the quality of three-dimensional models. Development has also begun on technology to recognize instruments and control valves.
  5. FY2020AdvancedAnnual report

    「During the consolidated fiscal year, with the cooperation of Waseda University, we developed a method for creating three-dimensional records of site conditions using camera images.」

    A method for creating three-dimensional records from camera images was developed and is being used to record progress, share information with remote support personnel, and propose renovations.
  6. FY2019AdvancedAnnual report

    「We are developing technology that converts camera images of site conditions into 3D data, enabling more detailed monitoring of construction progress and quality, at a level equivalent to visual inspection on site. This fiscal year, the technology entered the demonstration phase, and we are verifying its effectiveness at our construction sites.」

    The technology for converting camera images into 3D data using ICT has entered the demonstration phase, and verification of its effectiveness has begun at construction sites. The document also describes efforts to improve the efficiency of consensus-building through BIM and VR.
  7. FY2018First statedAnnual report

    「Strategy 1: Strengthen field capabilities ① Establish a field support structure ② Strengthen initiatives to improve technical capabilities ③ Improve productivity through initiatives promoting i-Construction」

    The new medium-term management plan explicitly includes i-Construction, and R&D is advancing the efficient management of progress and quality, as well as consensus-building, through wearable cameras, BIM and VR.
Moved together

"Development of an Air Barrier Booth for Regenerative Medicine" moved the same way as this thread, in the same document, in 5 of its 7 moves.

554443★123456
  1. ★This thread
  2. 1Development of an Air Barrier Booth for Regenerative Medicine5×
  3. 2Applying IoT Technology to Building Systems5×
  4. 3Creating New Business Areas by Leveraging Technologies for Light, Air and Water4×
  5. 4Research and Development of Energy-Saving, Clean and Resource-Efficient Technologies4×
  6. 5Rebuilding and Operational Verification of the Kyushu Branch Office ZEB Demonstration Facility4×
  7. 6Personnel Evaluation, Women’s Advancement and Working Environment Improvements3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Dai-Dan's next results are scheduled for 2026-11-11. Read the earnings preview It last moved in the Earnings presentation of 2026-11-11: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.