Penta-Ocean Construction (1893) · InitiativeAdvanced

Development of precast-concrete pier structures and labor-saving pier construction

First written in FY2018. 2 of 4 entries say "Advanced", first in FY2020. Latest entry: FY2026.

4entries
9years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2018 – FY2019AdvancedFY2020 – FY20262018: 120182019: 120192020: 120202021: 020212022: 020222023: 020232024: 020242025: 020252026: 12026
Same theme, other companies
Construction Streamlining Method for Precast Pier SuperstructuresA theme 2 companies write about · 0 as a headwind · 2 as a tailwind

0 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「The 175 m-long pier superstructure was divided into 3 precast members, each with a maximum length of 58.4 m and weight of 1,660 t, and the Company's smart connection technology was used to join them. Installation using a 2,200 t crane vessel was completed in 3 days.」

    The project progressed from developing a pile-head connection structure for precast-concrete piers to rapid construction in an actual project using large precast members and smart connection technology.
  2. FY2020AdvancedAnnual report

    「The technology was adopted for a construction project ordered by the Tohoku Regional Development Bureau of the Ministry of Land, Infrastructure, Transport and Tourism, achieving an approximately 30% reduction in the construction period for the superstructure beams compared with conventional cast-in-place concrete construction.」

    The pile-head connection structure for precast-concrete piers was applied to an actual construction project, achieving an approximately 30% reduction in the construction period compared with the conventional method.
  3. FY2019RestatedAnnual report

    「Through joint research with Tokyo Institute of Technology and the National Institute of Maritime, Port and Aviation Technology, the Company developed, through structural testing, a pile-head connection structure with excellent structural performance (straight piles: sleeve-pipe method; batter piles: socket-rebar method).」

    The Company continues to develop pile-head connection structures for various precast-concrete pier configurations through joint research with universities and research institutions.
  4. FY2018First statedAnnual report

    「Through joint research with Tokyo Institute of Technology and the National Institute of Maritime, Port and Aviation Technology, the Company developed, through structural testing, a pile-head connection structure with excellent structural performance and applied it to a pier construction project ordered by the Tohoku Regional Development Bureau.」

    The Company developed a pile-head connection structure through joint research with universities and research institutions and proceeded to apply it to pier construction.
Moved together

"Stable dividend policy targeting a consolidated dividend payout ratio of 20–25%" moved the same way as this thread, in the same document, in 2 of its 4 moves.

222222★123456
  1. ★This thread
  2. 1Stable dividend policy targeting a consolidated dividend payout ratio of 20–25%2×
  3. 23-Year Medium-Term Management Plan and the Planning, Execution and Verification Cycle2×
  4. 3Reform of the Construction Production System and Promotion of ICT, BIM, CIM and Robotics2×
  5. 4Validation of the practical utility of a remote-controlled boat system for port structure inspection and diagnosis2×
  6. 5Development of energy-saving technologies for conversion to ZEB2×
  7. 6Changes in laws and regulations, terrorism, war and conflict in overseas construction operations2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Penta-Ocean Construction yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.