Komori
Toa (1885) · RiskMaterialised

Damages Claims and Fewer Contract Opportunities Resulting from Accidents and Occupational Injuries

First written in FY2016. 2 of 5 entries say "Materialised", first in FY2023-Q1. Latest entry: FY2026.

5entries
11years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2016 – FY2019MaterialisedFY2023-Q1 – FY20262016: 120162017: 020172018: 020182019: 120192020: 020202021: 120212022: 120222023: 020232024: 020242025: 020252026: 12026
Same theme, other companies
Risk of Loss of Customer Confidence and Orders Due to Construction AccidentsA theme 27 companies write about · 29 as a headwind · 0 as a tailwind

Toa moved to the "Worse" side of this theme in 2022.

The whole theme swung hardest in 2025: 2 of 10 companies on the "Worse" side.

1 other company's latest entry also says "Materialised".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 27 companies compared. The sentences above are computed from all 27.
Full recordFilings, disclosures and news, newest first
  1. FY2026MaterialisedAnnual report

    「A serious accident occurred on 7 April 2026 during construction of the “Demolition Work for Public Conversion of Ogishima Pilot Area A and B Berths,” which the company was undertaking.」

    Although after the fiscal year-end, a serious accident actually occurred, and the Company disclosed the establishment of an internal accident investigation committee involving external experts and the formulation of measures to prevent recurrence.
  2. FY2023-Q1MaterialisedAnnual report

    「On 11 July 2022, an accident occurred at a building construction site in Eniwa, Hokkaido, where the Company was carrying out construction, when the second-floor slab collapsed during concrete placement. Restoration costs and other expenses are expected to arise, but the Company is currently investigating the cause and other matters, making a reasonable estimate difficult.」

    After the end of the quarter, a floor-collapse accident actually occurred at a building construction site, and the Company disclosed that restoration costs and other expenses were expected, while the cause remained under investigation and the amount was difficult to estimate.
  3. FY2021MitigatedAnnual report

    「The Group works to prevent accidents and occupational injuries by communicating and enforcing its occupational health and safety management plan and strengthening safety education and safety patrols.」

    Measures to address accident and occupational injury risks were specified, including strengthening the safety and health management plan, safety training, and safety patrols.
  4. FY2019RestatedAnnual report

    「Accidents and occupational injuries may occur due to unforeseen factors. In such cases, operating results may be affected by a decline in order opportunities resulting from damages liability, suspension from bidding for designated contracts, or other factors.」

    Continues to disclose the risk that accidents and occupational injuries could affect performance through damages claims and suspension of bidding eligibility.
  5. FY2016First statedAnnual report

    「Accidents and occupational injuries may occur due to unforeseen factors. In such cases, operating results may be affected by a decline in order opportunities resulting from damages liability, suspension from bidding for designated contracts, or other factors.」

    Describes residual accident and occupational injury risks after safety measures, and the channels through which they affect performance.
Moved together

"Domestic building business: revenue and earnings declined" moved the same way as this thread, in the same document, in 2 of its 5 moves.

222222★123456
  1. ★This thread
  2. 1Domestic building business: revenue and earnings declined2×
  3. 2Transformation into a “New TOA Construction Co., Ltd. that earns customers’ trust through technology and quality”2×
  4. 3Embedding compliance awareness across the Group and strengthening risk management2×
  5. 4Safety First and Preventive Occupational Health and Safety Activities2×
  6. 5Decline in the Fair Value of Real Estate and Securities2×
  7. 6Impact of the spread of COVID-19 on the economy, continuation of construction work, and accounting estimates2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Toa yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.