Improving Construction and Business Efficiency and Strengthening On-Site Support
First written in FY2016. 7 of 10 entries say "Advanced", first in FY2019. Latest entry: FY2026.
9 other companies' latest entry also says "Advanced".
- FY2026AdvancedAnnual report
「We are using ICT and IoT technologies, including 3D scanners, digital twins and generative AI, to improve the efficiency of construction operations, and are building an environment in which engineers can focus on construction.」
Made construction and operational efficiency tangible through the digitalisation of construction sites using 3D scanners, digital twins and generative AI. - 2026-05-14AdvancedEarnings
「We are using ICT and IoT technologies, including 3D scanners, digital twins and generative AI, to improve the efficiency of construction operations, and are building an environment in which engineers can focus on construction.」
DX推進室を中心とするデジタル化について、3Dスキャナー、デジタルツイン、生成AIの活用を明示し、施策を具体化した。 - FY2024AdvancedAnnual report
「Furthermore, as Japan’s population declines and the environment surrounding the construction industry becomes increasingly challenging, we established a “DX Promotion Office” under the direct supervision of the president to strategically promote DX in order to secure construction capacity and strongly advance digitalisation at construction sites.」
Established a DX Promotion Office under the direct supervision of the president as a means of securing construction capacity and improving productivity, and moved toward a structure for promoting digitalisation at construction sites. - FY2023AdvancedAnnual report
「Under “Improving productivity and reducing costs,” we have strengthened our construction capabilities and pursued greater safety and productivity by improving the decking plates used in platform screen door construction (patent pending), developing seismic reinforcement methods for electrification poles as part of earthquake-resistance measures, including for Shinkansen lines (patent rights secured), and further advancing the Pillar-Pile Spotto construction method (patent pending) and Smart Wixis construction method (patent pending), among others, for station building renovation work.」
Advanced the improvement and patenting of new construction methods and equipment for platform screen doors, seismic reinforcement and station building renovation, thereby achieving tangible improvements in safety and productivity. - FY2022AdvancedAnnual report
「We strengthened construction capabilities to respond to the increase in construction volume by developing new equipment and construction methods for platform screen door projects and station building renovations, including cover plates and maintenance vehicles used in platform screen door construction, compacting platform canopy foundations at station buildings by reducing the size of column-pile joints, and developing the Smart Wixis construction method, for which a patent application is pending, thereby improving safety and productivity.」
Developed new equipment and construction methods for platform screen door projects, station building renovations and other work, and advanced improvements in safety, productivity and field response capabilities. - FY2021AdvancedAnnual report
「"Improving productivity and reducing costs" ・Daily construction output (compared with fiscal 2016) Completed construction revenue / man-days ・20% increase (fiscal 2025)」
Specified productivity improvement as a measurable target: a 20% increase in daily construction output compared with fiscal 2016, rather than simply continuing conventional efficiency measures. - FY2019AdvancedAnnual report
「With regard to personnel development, we are reviewing and enhancing training software and hardware to strengthen effective, practical education and training, improve technical capabilities, and develop a highly skilled professional workforce.」
In addition to reviewing training software and hardware, advanced measures to improve operational efficiency and support field operations, including RPA and a field support system. - FY2018RestatedAnnual report
「In addition, through thorough implementation of detailed construction planning, various improvements and innovations, the promotion of tablet device use, and various technology development initiatives, we worked to improve construction and operational efficiency and shorten construction periods.」
Continued to improve construction and operational efficiency and shorten construction periods through construction planning, improvements and innovations, tablet devices and technology development. - FY2017RestatedAnnual report
「In addition, through thorough implementation of detailed construction planning, various improvements and innovations, and the accelerated use of tablet devices, we worked to improve construction and operational efficiency and shorten construction periods.」
Continued to improve construction and operational efficiency and shorten construction periods through construction planning, improvements and innovations, and the use of tablet devices. - FY2016First statedAnnual report
「Through detailed construction planning, various improvements and innovations, and the accelerated introduction of tablet devices, we worked to improve construction and operational efficiency and shorten construction periods.」
In response to the increase in workload, established the Operations Support Division in February 2016. Strengthened materials procurement, system development and operation, and other operational support.