Establishing a Preparatory Framework for Large-Scale Shinkansen Renovation

First written in FY2016. 3 of 7 entries say "Advanced", first in FY2020. Latest entry: FY2026.

7entries
11years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2016 – FY2017AdvancedFY2020 – FY20262016: 120162017: 120172018: 120182019: 120192020: 120202021: 020212022: 020222023: 020232024: 120242025: 020252026: 12026
Same theme, other companies
Preparing technical and construction capabilities for large-scale Shinkansen refurbishmentA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「Development of construction methods, materials and construction machinery for large-scale Shinkansen renovation, including projects being jointly developed with JR East.」

    The Company positioned its response to large-scale Shinkansen renovation as a target of the five-year, ¥50 billion technology development and mechanization investment under Action Plan 2029, incorporating it into an investment plan that includes joint development with JR East.
  2. FY2024AdvancedAnnual report

    「Increasing the number of large track-maintenance machines and upgrading them to improve functionality; developing machines to improve efficiency and reduce labor; and developing construction methods, materials and construction machinery for large-scale Shinkansen renovation, including projects being jointly developed with JR East.」

    Under the ¥50 billion in technology development and mechanization investment in the Action Plan 2029, the Company specified the development of construction methods, materials and construction machinery for large-scale Shinkansen renovation as an investment target.
  3. FY2020AdvancedAnnual report

    「We are also proceeding with construction to establish full-scale test facilities at the JR East General Training Center in preparation for the planned large-scale renovation of the Shinkansen railway.」

    In preparation for large-scale Shinkansen renovation, the project advanced to the construction stage for establishing full-scale test facilities.
  4. FY2019RestatedAnnual report

    「We worked on developing the [new STARS] group of machines for tunnel seismic reinforcement and new construction methods for large-scale Shinkansen renovation.」

    Development of new construction methods for large-scale Shinkansen renovation is continuing.
  5. FY2018ReframedAnnual report

    「The headquarters were reorganized: the Internal Control Headquarters was reorganized as the Internal Control Office, the Safety and Technology Promotion Headquarters as the Safety and Quality Headquarters, and the Large-Scale Shinkansen Renovation Headquarters as a department within the Civil Engineering Headquarters.」

    The Large-Scale Shinkansen Renovation Headquarters was reorganized from an independent headquarters into a department within the Civil Engineering Headquarters, incorporating the preparation structure into the existing business headquarters.
  6. FY2017RestatedAnnual report

    「Regarding the large-scale renovation of the Shinkansen railway planned by East Japan Railway Company, we determined that it was necessary for the Company to establish a preparation structure as soon as possible and established the Large-Scale Shinkansen Renovation Headquarters in May of the previous year. We are proceeding with various preparations, including studying efficient construction methods, developing the necessary machinery, and developing and proposing new materials.」

    Preparations involving construction methods, machinery and new materials continued after the establishment of the Large-Scale Shinkansen Renovation Headquarters.
  7. FY2016First statedAnnual report

    「Having determined that it was necessary to establish a preparation structure as soon as possible, we newly established the Large-Scale Shinkansen Renovation Headquarters in May of this year and are proceeding diligently with preparations, including studying efficient construction methods, developing the machinery required for them, and developing and proposing new materials.」

    The establishment of the Large-Scale Shinkansen Renovation Headquarters in May 2016 and the development of construction methods, machinery and new materials were disclosed.
Moved together

"“3D Strategy” to Expand Customer Segments, Business Scope and Quality" moved the same way as this thread, in the same document, in 3 of its 7 moves.

333333★123456
  1. ★This thread
  2. 1“3D Strategy” to Expand Customer Segments, Business Scope and Quality3×
  3. 2Focused Investment in JR East and Expansion of Non-JR Customers3×
  4. 3Deepening business domains based on strengths in railways, infrastructure and related areas3×
  5. 4Stable Dividends and Introduction of Interim Dividends3×
  6. 5Research and Development in Safety, Construction Efficiency and Environmental Fields3×
  7. 6Workstyle Reform, Four-Week, Eight-Day Rest at Worksites, and Strengthening Human Resource Development3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Totetsu Kogyo yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.