Komori
Moriya (1798) · InitiativeRestated

Research and Commercialization of Geothermal Energy Technology

First written in FY2016. 6 of 12 entries say "Advanced", first in FY2017. Latest entry: FY2026.

12entries
11years
1from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2019 – FY2023RestatedFY2024 – FY20252016: 120162017: 120172018: 120182019: 120192020: 120202021: 120212022: 120222023: 120232024: 120242025: 120252026: 22026
Same theme, other companies
Research and Commercialization of Geothermal Energy TechnologyA theme 2 companies write about · 0 as a headwind · 2 as a tailwind

1 other company's latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026RestatedAnnual report

    「In these circumstances, the Company is promoting the wider adoption of the Heat-Gw-Power cascade type, a geothermal and groundwater-heat heating and cooling technology with strong potential as a means of achieving zero-energy buildings (ZEB), and is vigorously promoting energy efficiency in buildings.」

    The Company continues to promote wider adoption of the Heat-Gw-Power cascade type, based on its track record of ETV demonstration, awards and ZEB and BELS conformity determinations.
  2. 2026-05-12RaisedManagement Plan

    「Expansion of the business based on the groundwater-circulation-type underground heat extraction and dissipation system (HeatーGW-Power) developed by the company」

    For its geothermal technology, the company has expanded its measures from promoting adoption to expanding the business and branding its ZEB products.
  3. FY2025RestatedAnnual report

    「The Company is promoting the wider adoption of the Heat-Gw-Power cascade type, a geothermal and groundwater-heat heating and cooling technology with strong potential as a means of achieving zero-energy buildings (ZEB), and is vigorously promoting energy efficiency in buildings.」

    The Company continues to promote wider adoption of the technology, based on its track record of ETV certification, the Energy Conservation Grand Prize and ZEB and BELS conformity determinations.
  4. FY2024RestatedAnnual report

    「In these circumstances, the Company is promoting the wider adoption of the Heat-Gw-Power cascade type, a geothermal and groundwater-heat heating and cooling technology with strong potential as a means of achieving zero-energy buildings (ZEB), and is vigorously promoting energy efficiency in buildings.」

    The Company continues to promote wider adoption of the Heat-Gw-Power cascade type, based on its track record of ETV certification, the Energy Conservation Grand Prize and ZEB and BELS conformity determinations.
  5. FY2023AdvancedAnnual report

    「In April 2023, the Company installed Heat-Gw-Power in an office building it had won the order to construct in Iiyama, Nagano Prefecture, and obtained conformity determinations for ZEB and BELS: 5★ (five-star).」

    The geothermal technology has progressed from demonstration, awards and wider adoption to actual installation in buildings that the Company has won orders to construct and has completed, with conformity determinations for ZEB and BELS 5★.
  6. FY2022AdvancedAnnual report

    「In these circumstances, the Company is promoting the wider adoption of the Heat-Gw-Power cascade type, a geothermal and groundwater-heat heating and cooling technology with strong potential as a means of achieving zero-energy buildings (ZEB), and is vigorously promoting energy efficiency in buildings.」

    The geothermal technology, having been demonstrated under ETV and having won the Energy Conservation Grand Prize, has progressed to the stage of wider adoption for achieving ZEB and improving energy efficiency in buildings.
  7. FY2021AdvancedAnnual report

    「In FY2020, the Heat-Gw-Power cascade type received the ETV logo mark from the Ministry of the Environment as a verified technology under the Environmental Technology Verification (ETV) program. The results were published on the Ministry of the Environment’s website and elsewhere, and in December of the same year the technology received the Energy Conservation Grand Prize in the Product and Business Model category based on its performance evaluation results under the ETV program.」

    The geothermal technology received the ETV logo mark as a verified technology and progressed to the point of winning the Energy Conservation Grand Prize in December 2020.
  8. FY2020AdvancedAnnual report

    「In FY2019, the technology was selected for demonstration under the Ministry of the Environment’s Environmental Technology Verification (ETV) program and was demonstrated. As a result, it significantly exceeded the target performance values of the comparison technologies and obtained ETV certification as a verified technology.」

    The geothermal technology was demonstrated under the ETV program and progressed to certification as a verified technology. It has advanced from the research and demonstration stages to the certification stage leading to wider adoption.
  9. FY2019AdvancedAnnual report

    「In September 2014, as part of efforts to commercialize this research technology, the project was selected for the FY2014 Renewable Energy Heat Utilization Technology Development Program solicited by the New Energy and Industrial Technology Development Organization (NEDO), then an incorporated administrative agency, and the Company conducted five years of joint research. Subsequently, in August 2018, it implemented a cascade type that combines conventional open-loop technology, with the aim of expanding the scope of applications for the technology developed through the five-year joint research. In February 2019, based on performance data from the initial stage of the cascade type, the technology was selected by the Ministry of the Environment as a technology for demonstration under its FY2019 Environmental Technology Verification (ETV) program. The Company plans to obtain certification as a verified technology.」

    The Company completed five years of joint research with NEDO and implemented the cascade type in August 2018. It was also selected as a technology for demonstration under the FY2019 ETV program and plans to obtain certification as a verified technology.
  10. FY2018RestatedAnnual report

    「The five-year development period for the joint research runs through 2018. Following the construction and operation of a demonstration plant and verification of its various performance characteristics, the Company plans to commercialize the technology.」

    The Company continues to disclose its joint research with NEDO, development period through 2018, verification using a demonstration plant and patent acquisition.
  11. FY2017AdvancedAnnual report

    「The five-year development period for the joint research runs through 2018. Following the construction and operation of a demonstration plant and verification of its various performance characteristics, the Company plans to commercialize the technology. The research and development resulted in Patent No. 5963790, “Groundwater-circulation geothermal heat extraction system and geothermal heating, cooling or hot-water supply system,” granted on 8 July 2016.」

    The Company continued its joint research with NEDO, disclosed the development period through 2018 and verification using a demonstration plant, and obtained a patent on 8 July 2016. Its priority measures also include monetizing the geothermal energy business.
  12. FY2016First statedAnnual report

    「The Company is developing technologies aimed at improving the performance of geothermal heat extraction equipment for geothermal heat pumps. In September 2014, as part of efforts to commercialize this technology, the project was selected for the FY2014 Renewable Energy Heat Utilization Technology Development Program solicited by the New Energy and Industrial Technology Development Organization (NEDO), and joint research with NEDO is currently under way. The research and development period is expected to be 3 to 5 years. Following the construction and operation of a demonstration plant and verification of its various performance characteristics, the Company plans to commercialize the technology.」

    As research toward a low-carbon society, the Company describes its joint research with NEDO, the construction and operation of a demonstration plant, and a 3-to-5-year research and development period.
Moved together

"Strengthening the Financial Base and Financial Soundness" moved the same way as this thread, in the same document, in 5 of its 12 moves.

533333★123456
  1. ★This thread
  2. 1Strengthening the Financial Base and Financial Soundness5×
  3. 2Improving the Consolidated Operating Margin and Construction Project Profitability3×
  4. 3Improving Each Employee’s Capabilities3×
  5. 4Measures to Address Work-Style Reform and Reduce Overtime Work3×
  6. 5Enhancement and improvement of overall technical capabilities and internal training3×
  7. 6Company-wide rollout of SDG initiatives3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Moriya yet. It last moved in the Management Plan of 2026-05-12: "Raised".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Research and Commercialization of Geothermal Energy Technology | MORIYA CORPORATION (1798) | Komori