Komori
Tanseisha (9743) · InitiativeRestatedLatest Earnings presentation (2026-06-12): "Advanced"

Implementation of BIM (Building Information Modeling)

First written in FY2021. 3 of 6 entries say "Advanced", first in FY2023. Latest entry: 2026-06-12.

6entries
6years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2021AchievedFY2022 – FY2023RestatedFY20242021: 120212022: 120222023: 120232024: 120242025: 020252026: 22026
Same theme, other companies

The whole theme swung hardest in 2022: 1 of 11 companies on the "Worse" side.

11 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 26 companies compared. The sentences above are computed from all 26.
Moved together

"Increase in order intake" moved the same way as this thread, in the same document, in 3 of its 6 moves.

322222★123456
  1. ★This thread
  2. 1Increase in order intake3×
  3. 2Improving Chain-Store Business Profitability Through Enhanced Proficiency2×
  4. 3Flexible funding combining cash on hand, borrowings, and corporate bonds2×
  5. 4Enhancing Corporate Value over the Medium to Long Term through a Trust-Based Employee Shareholding Incentive Plan2×
  6. 5Maintaining a gross profit margin of 19.4% despite lower revenue2×
  7. 6Operating Cash Flow Shifts to an Outflow, Reducing Cash and Cash Equivalents2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Tanseisha yet. It last moved in the Earnings presentation of 2026-06-12: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Implementation of BIM (Building Information Modeling) | TANSEISHA CO.,LTD. (9743) | Komori