Komori
The Royal Hotel,Limited (9713) · InitiativeRestated

Converting RIHGA Royal Hotel Kyoto to an Operating Agreement, Renovating It and Pursuing a Premium Position

First written in FY2016. 2 of 5 entries say "Advanced", first in FY2017-Q1. Latest entry: FY2017.

5entries
2years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2017-Q1 – FY2017-Q2RestatedFY2017-Q3 – FY20172016: 320162017: 22017
Same theme, other companies
Becoming Asset-Light Through Asset Portfolio Replacement and Strengthening the Earnings BaseA theme 10 companies write about · 0 as a headwind · 11 as a tailwind

The whole theme swung hardest in 2026: 1 of 7 companies on the "Worse" side.

2 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2017RestatedAnnual report

    「リーガロイヤルホテル京都は、改装工事により約7ヶ月間にわたり全館休業しておりましたが、昨年9月、京の風情と現代的なデザインが散りばめられたホテルとしてリニューアルオープンしました。」

    京都ホテルの所有から運営受託方式への転換後の改装・リニューアルオープンを再掲している。
  2. FY2017-Q3RestatedAnnual report

    「リーガロイヤルホテル京都は、改装工事により全館休業しておりましたが、昨年9月にリニューアルオープンしました。」

    京都ホテルの改装後のリニューアルオープンを再掲しており、新たな進捗は記載していない。
  3. FY2017-Q2AdvancedAnnual report

    「リーガロイヤルホテル京都は、改装工事により約7ヵ月間にわたり全館休業しておりましたが、今年9月、京の風情と現代的なデザインが散りばめられたホテルとしてリニューアルオープンしました。」

    京都ホテルの改装・運営受託化に関する具体的なマイルストーンとして、全館改装後のリニューアルオープンが完了した。京都ナンバーワンホテルの目標自体は継続している。
  4. FY2017-Q1AdvancedAnnual report

    「リーガロイヤルホテル京都の改装休業に伴う運営受託料の減少や、熊本地震発生に伴う需要の落ち込み等により、当第1四半期連結累計期間の売上高は9,755百万円と前年同期比175百万円の減収となりました。」

    京都ホテルの改装が休業を伴う段階に進み、運営受託料の減少として業績にも表れている。
  5. FY2016First statedAnnual report

    「Regarding RIHGA Royal Hotel Kyoto, we transferred the entire business, including the land and buildings owned by us, last March and converted the business model to an operating agreement. The hotel underwent renovation and reopened this September as a hotel combining the atmosphere of Kyoto with contemporary design. We aim to make it the No. 1 hotel in Kyoto.」

    Transferred the owned assets and converted to an operating agreement, with the aim of achieving a leading position in Kyoto through renovation and reopening.
Moved together

"Renovation Focused on Guest Rooms and Strengthening Accommodation Capacity" moved the same way as this thread, in the same document, in 2 of its 5 moves.

22★12
  1. ★This thread
  2. 1Renovation Focused on Guest Rooms and Strengthening Accommodation Capacity2×
  3. 2Improving Financial Strength by Reducing Interest-Bearing Debt2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
The Royal Hotel,Limited's next results are scheduled for 2026-11-13. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.