Renova (9519) · InitiativeReframedLatest General Meetings of Shareholders (2026-05-28): "Advanced"

Diversification into Multiple Renewable Energy Sources

First written in FY2017. 12 of 17 entries say "Advanced", first in FY2021-Q1. Latest entry: 2026-05-28.

17entries
10years
3from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2017 – FY2018AdvancedFY2021-Q1 – FY2022-Q3AdvancedFY2023-Q1 – FY2023AdvancedFY2024-Q32017: 120172018: 120182019: 020192020: 120202021: 320212022: 420222023: 220232024: 120242025: 120252026: 32026
Same theme, other companies
Expanding the Solar, Wind and Biomass Power PortfolioA theme 31 companies write about · 0 as a headwind · 38 as a tailwind

The whole theme swung hardest in 2025: 2 of 20 companies on the "Worse" side.

21 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 31 companies compared. The sentences above are computed from all 31.
Full recordFilings, disclosures and news, newest first
  1. FY2025ReframedAnnual report

    「The Group owns multiple types of power sources, including solar, biomass, onshore wind and geothermal power, but going forward seeks to focus development on solar and onshore wind power.」

    While maintaining its policy of diversifying its power sources, the Group has clarified that future focused development will target solar and onshore wind power.
  2. FY2024-Q3AdvancedAnnual report

    「The Hitoyoshi Solar silent partnership business (20.8MW output, with generation capacity based on generator-terminal output) commenced commercial operations in June 2023, 合同会社杜の都バイオマスエナジー (75.0MW output, with generation capacity based on generator-terminal output) in November 2023, and Tokushima Tsuda Biomass Power Plant (74.8MW output, with generation capacity based on generator-terminal output) in December 2023.」

    In addition to solar power, 75.0MW and 74.8MW biomass power plants commenced commercial operations, advancing the operating track record of the diversified power portfolio.
  3. FY2024-Q2Review of the timing of commercial operation commencementAnnual report

    「Tokushima Tsuda Biomass Power GK and Ishinomaki Hibarino Biomass Energy GK had been conducting commissioning toward commencing operations in September 2023, but required additional time for final adjustments to their boiler and turbine equipment for long-term stable operation. Accordingly, the commercial operation commencement date was changed to December 2023 (scheduled) for Tokushima Tsuda Biomass Power GK and January 2024 (scheduled) for Ishinomaki Hibarino Biomass Energy GK.」

    For some of the biomass projects comprising the diversified power portfolio, the commercial operation commencement dates were changed to allow time for final adjustments to boiler and turbine equipment.
  4. FY2023AdvancedAnnual report

    「In March 2023, a financing-related agreement was signed with financial institutions for an onshore wind power project being developed in Kumamoto Prefecture through Reihoku Wind GK, an equity-method affiliate.」

    As part of its diversification of power sources, Reihoku Wind's onshore wind project progressed to the execution of financing-related agreements.
  5. FY2023-Q2AdvancedAnnual report

    「The projects under construction comprise 5 biomass power plants and 1 each of solar, geothermal and hydroelectric power plants, all of which are progressing as planned. In October 2022, the Minami Aso Yunodani geothermal power plant, the Tokushima Tsuda biomass power plant and the Ishinomaki Hibarino biomass power plant commenced commissioning.」

    The Group has specified the projects under construction as 5 biomass plants and 1 each of solar, geothermal and hydroelectric plants, and in October 2022, 3 geothermal and biomass projects commenced commissioning.
  6. FY2023-Q1AdvancedAnnual report

    「The projects under construction comprise 5 biomass power plants and 1 each of solar, geothermal and hydroelectric power plants, all of which are progressing as planned. During the current consolidated fiscal year, the Minami Aso Yunodani geothermal power project was scheduled to commence operations in December 2022, and the Tokushima Tsuda biomass project in March 2023.」

    The Group has specified the projects under construction as 5 biomass plants and 1 each of solar, geothermal and hydroelectric plants, and has also indicated the scheduled start of operations for the geothermal and biomass projects.
  7. FY2022RestatedAnnual report

    「The Group seeks to develop power plants using multiple types of power sources, including solar, biomass, offshore and onshore wind, geothermal and hydroelectric power.」

    The Group continues to develop a diversified portfolio including geothermal and hydroelectric power in addition to solar, biomass and wind power.
  8. FY2022-Q3AdvancedAnnual report

    「Multiple onshore wind power projects in Quang Tri Province, the Socialist Republic of Vietnam, with aggregate capacity of 144.0MW, operated by an equity-method affiliate of the Group, commenced commercial operations.」

    As part of its diversification of power sources, the Group added 144.0MW of Vietnamese onshore wind power to its domestic solar, biomass and other projects, and it commenced commercial operations.
  9. FY2022-Q2AdvancedAnnual report

    「In July 2021, the Kiangan hydropower project under construction in Ifugao Province, the Republic of the Philippines, entered into financing-related agreements with financial institutions.」

    In addition to solar, biomass, wind and geothermal power, the Philippine hydropower project progressed to the execution of financing-related agreements, concretely expanding the scope of the Group's diversified power sources.
  10. FY2022-Q1AdvancedAnnual report

    「In June 2021, Minami Aso Yunodani Geothermal Co., Ltd., which operates a geothermal power business, entered into financing-related agreements with financial institutions.」

    As part of its diversification of power sources, the geothermal power business progressed to the execution of financing-related agreements with financial institutions.
  11. FY2021AdvancedAnnual report

    「In Japan, the Group will promote the development of multiple power sources, centered on offshore wind power and including biomass, onshore wind and geothermal power. Overseas, it will promote the development of new renewable energy sources suited to each country and region, primarily in Asia.」

    The Group has specified a policy of combining domestic offshore wind power as the core source with biomass, onshore wind, geothermal power and overseas power sources.
  12. FY2021-Q1AdvancedAnnual report

    「In May 2020, the Group participated in projects involving investment in multiple onshore wind power projects with aggregate capacity of 144.0MW under construction in Quang Tri Province, the Socialist Republic of Vietnam.」

    In addition to solar and biomass, the Group invested in onshore wind power projects in Vietnam, giving concrete form to its diversification of power sources.
  13. FY2018RestatedAnnual report

    「The Group seeks to develop power plants using multiple types of power sources, including biomass, offshore and onshore wind, and geothermal power, in addition to large-scale solar power.」

    The Group continues to diversify its power sources to include biomass, wind and geothermal power in addition to solar.
  14. FY2017First statedAnnual report

    「The Group seeks to develop power plants using multiple types of power sources, including biomass, offshore and onshore wind, and geothermal power, in addition to large-scale solar power.」

    The Group has specified measures to expand from a solar-focused portfolio to multiple power sources, including biomass, wind and geothermal.
Moved together

"Emphasis on EBITDA to Enhance Enterprise Value and Equity Value" moved the same way as this thread, in the same document, in 8 of its 17 moves.

887766★123456
  1. ★This thread
  2. 1Emphasis on EBITDA to Enhance Enterprise Value and Equity Value8×
  3. 2Large-Scale Power Plant Development Investment Using Debt Financing with a Focus on Capital Efficiency8×
  4. 3Accelerating the Development of Large-Scale Biomass Power Generation7×
  5. 4Issuance of Stock Acquisition Rights for Officers and Employees7×
  6. 5Managing Reliance on Net Debt6×
  7. 6Recurring revenue from power plants in operation and development and operating businesses6×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Renova yet. It last moved in the General Meetings of Shareholders of 2026-05-28: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Diversification into Multiple Renewable Energy Sources | RENOVA,Inc. (9519) | Komori