Komori
Caster (9331) · RiskRestated

Risk of Dependence on Infrastructure and System Availability

First written in FY2023. 1 of 3 entries say "Materialised", first in FY2024-Q1. Latest entry: FY2024.

3entries
2years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseMaterialisedFY2024-Q12023: 120232024: 22024
Same theme, other companies
Systems and Communications Infrastructure Failure RiskA theme 223 companies write about · 223 as a headwind · 2 as a tailwind

The whole theme swung hardest in 2026: 16 of 81 companies on the "Worse" side.

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 199 companies compared. The sentences above are computed from all 199.Comparing 200 of the theme's 225 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2024RestatedAnnual report

    「Although we have strengthened our systems and security for stable operations and take every possible precaution in operating and managing our systems, our high dependence on systems because remote work is our primary operating foundation means that unforeseen natural disasters, accidents causing substantial facility damage, system or network failures, virus infections, software or hardware defects and cyberattacks could disrupt operations and materially affect the group’s business and results.」

    Continues to disclose the risk of disruption arising from dependence on remote-work infrastructure while describing system and security enhancements.
  2. FY2024-Q1MaterialisedAnnual report

    「We extend our deepest sympathies to everyone affected by the 2024 Noto Peninsula Earthquake and pray for the swift recovery of the affected areas. The earthquake had only a minor impact on our business, and although some employees live in the region, there were no injuries.」

    The Noto Peninsula Earthquake occurred as a natural disaster, but its impact on the business was minor and there were no personal injuries.
  3. FY2023First statedAnnual report

    「Because remote work is our primary operating foundation, we are highly dependent on various systems. If facilities suffer substantial damage from an unforeseen natural disaster or accident, or if a system failure, network failure, virus infection, software or hardware defect, cyberattack or other event occurs, operations could be disrupted and our business and results could be materially affected.」

    Probability: medium; timing: unspecified; impact: high.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
Caster's next results are scheduled for 2026-10-14. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Risk of Dependence on Infrastructure and System Availability | Caster Co.Ltd. (9331) | Komori