Komori
Kobe Electric Railway (9046) · InitiativeAchieved

Barrier-Free Improvements at Nagata Station

First written in FY2020-Q2. 2 of 4 entries say "Achieved", first in FY2020. Latest entry: FY2022.

4entries
4years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAchievedFY2020-Q3 – FY20222019: 120192020: 220202021: 020212022: 12022
Same theme, other companies
Barrier-Free Improvements at Nagata StationA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2022AchievedAnnual report

    「In addition, at Nagata Station, where barrier-free improvement work had been underway, the ramps and multifunctional restroom were opened for use in December 2019, and the elevator was opened for use in March 2020.」

    Because the completed status of the existing thread was also confirmed in the equipment details for the current fiscal year, there was no additional status change, but the completed construction results are being reposted.
  2. FY2020AchievedAnnual report

    「In addition, at Nagata Station, where barrier-free improvement work had been underway, the ramps and multifunctional restroom were opened for use in December 2019, and the elevator was opened for use in March 2020.」

    Regarding the barrier-free improvement work at Nagata Station, the elevator was also opened for use in March 2020, following the ramps and multifunctional restroom.
  3. FY2020-Q3AdvancedAnnual report

    「In addition, at Nagata Station, where barrier-free improvement work was underway, the ramps and multifunctional restroom were opened for use in December 2019, and work on the elevator was progressing steadily toward completion in March 2020.」

    The barrier-free improvement work at Nagata Station made specific progress with the opening of the ramps and multifunctional restroom, while the elevator work was progressing toward completion in March 2020.
  4. FY2020-Q2First statedAnnual report

    「In addition, barrier-free improvement work is underway at Nagata Station, including the installation of an elevator, ramps and a multifunctional restroom.」

    Barrier-free improvement work is underway at Nagata Station, including the installation of an elevator, ramps and a multifunctional restroom.
Moved together

"Strengthening the Financial Condition and Management Base through Interest-Bearing Debt Reduction" moved the same way as this thread, in the same document, in 3 of its 4 moves.

32222★12345
  1. ★This thread
  2. 1Strengthening the Financial Condition and Management Base through Interest-Bearing Debt Reduction3×
  3. 2Strengthening the Competitiveness of Food Supermarkets2×
  4. 3Securing Flexibility and Stability in Funding Through Commitment Lines2×
  5. 4Periodic review and reduction of cross-shareholdings2×
  6. 5Improving Taxi Vehicle Utilization and Expanding Service Areas2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Kobe Electric Railway's next results are scheduled for 2026-10-29. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.