Suzurandai Station: conversion to an elevated station building

First written in FY2017-Q2. 6 of 10 entries say "Restated". Latest entry: FY2019.

10entries
4years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2017-Q2 – FY2018AchievedFY2019-Q2 – FY20192016: 120162017: 420172018: 420182019: 12019
Same theme, other companies

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2019AchievedAnnual report

    「In September 2018, the elevated Suzurandai Station building, whose construction had proceeded in conjunction with Kobe City’s station-front redevelopment project, commenced operations, and the bus and taxi stands were relocated and upgraded, improving convenience.」

    The conversion of the Suzurandai Station building to an elevated structure commenced operations in September 2018, and the bus and taxi stands were also relocated and upgraded.
  2. FY2019-Q2AchievedAnnual report

    「Suzurandai Station, where construction to convert the station building to an elevated structure had been proceeding in conjunction with Kobe City’s station-front redevelopment project, commenced operations in September 2018.」

    The previous target for commencing operations was achieved, with operations commencing in September 2018.
  3. FY2019-Q1ReframedAnnual report

    「Construction is proceeding so that the elevated Suzurandai Station building can commence operations in line with the scheduled September 2018 opening of Kobe City’s redevelopment building in front of Suzurandai Station.」

    The wording changed from the previous target of commencing operations around summer 2018 to commencing operations in line with the September 2018 opening of the redevelopment building, specifying the timing and condition.
  4. FY2018RestatedAnnual report

    「Construction to convert the Suzurandai Station building to an elevated structure, which is proceeding in conjunction with Kobe City’s station-front redevelopment project, is progressing smoothly toward the commencement of operations around summer 2018.」

    Construction to convert the station building to an elevated structure is continuing toward the commencement of operations around summer 2018.
  5. FY2018-Q3RestatedAnnual report

    「Construction to convert the Suzurandai Station building to an elevated structure, which is proceeding in conjunction with Kobe City’s station-front redevelopment project, is progressing diligently toward the commencement of operations around summer 2018.」

    Construction to convert the Suzurandai Station building to an elevated structure is continuing, with operations targeted to commence around summer 2018.
  6. FY2018-Q2RestatedAnnual report

    「Construction to convert the Suzurandai Station building to an elevated structure, which is proceeding in conjunction with Kobe City’s station-front redevelopment project, is progressing diligently toward the commencement of operations around summer 2018.」

    Construction to convert the Suzurandai Station building to an elevated structure is continuing, with operations targeted to commence around summer 2018.
  7. FY2018-Q1RestatedAnnual report

    「Construction to convert the Suzurandai Station building to an elevated structure is scheduled to be completed and operations to commence around summer 2018.」

    There has been no change to the planned commencement of operations around summer 2018.
  8. FY2017RestatedAnnual report

    「Construction to convert the Suzurandai Station building to an elevated structure is scheduled to be completed and operations to commence around summer 2018.」

    There has been no change to the planned commencement of operations around summer 2018.
  9. FY2017-Q3RestatedAnnual report

    「At Suzurandai Station, we are working diligently on construction to convert the station building to an elevated structure, with the aim of commencing operations around summer 2018.」

    There has been no change to the plan or progress of construction aimed at commencing operations around summer 2018.
  10. FY2017-Q2First statedAnnual report

    「At Suzurandai Station, we are working diligently on construction to convert the station building to an elevated structure, with the aim of commencing operations around summer 2018.」

    Construction to convert the station building to an elevated structure is proceeding, with operations scheduled to commence around summer 2018.
Moved together

"Promoting Rail Use Through Special Tickets, Events and Local Government Partnerships" moved the same way as this thread, in the same document, in 2 of its 10 moves.

222★123
  1. ★This thread
  2. 1Promoting Rail Use Through Special Tickets, Events and Local Government Partnerships2×
  3. 2Strengthening the Financial Condition and Management Base through Interest-Bearing Debt Reduction2×
  4. 3Discussions on the Suzurandai Station-front Redevelopment2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Kobe Electric Railway's next results are scheduled for 2026-10-29. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.