Komori
Hiroshima Electric Railway (9033) · InitiativeAdvanced

Real-time provision of service and emergency information

First written in FY2016. 3 of 5 entries say "Advanced", first in FY2017. Latest entry: FY2022.

5entries
7years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2016AdvancedFY2017 – FY20202016: 120162017: 120172018: 020182019: 020192020: 120202021: 120212022: 12022
Same theme, other companies
Measures to Improve Convenience and Promote Use for Bus PassengersA theme 7 companies write about · 0 as a headwind · 8 as a tailwind

4 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2022AdvancedAnnual report

    「While carrying out renovations to the Yokogawa Station location system to improve customers’ travel experience,」

    The Yokogawa Station location system was renovated, updating the infrastructure for providing service information and other data.
  2. FY2022-Q2RestatedAnnual report

    「We continued to ask passengers to stagger their commuting times and use services during off-peak periods by providing information on onboard congestion,」

    The promotion of staggered commuting and off-peak use through the provision of onboard congestion information is continuing.
  3. FY2020AdvancedAnnual report

    「PASPY Center System terminal equipment renewal 297」

    We invested ¥297 million in renewing the terminal equipment for the PASPY Center System, updating the transportation information and payment infrastructure.
  4. FY2017AdvancedAnnual report

    「In the railway business, we added 2 low-floor Type 1000 vehicles, whose introduction is under way, and installed a train location system at 2 tram stops on the city lines, in addition to」

    A train location system was installed at 2 tram stops on the city lines in addition to the existing bus location system.
  5. FY2016First statedAnnual report

    「We completed the bus location system and Hiroshima Public Transport Navigation “Kuruken,” which provide customers with real-time bus service information, thereby improving convenience and streamlining service management.」

    Customer convenience and service management efficiency are being improved through completion of the bus location system.
Moved together

"Introduction of ultra-low-floor streetcars, low-floor buses and hybrid buses" moved the same way as this thread, in the same document, in 3 of its 5 moves.

332222★123456
  1. ★This thread
  2. 1Introduction of ultra-low-floor streetcars, low-floor buses and hybrid buses3×
  3. 2Renewal of existing real estate, utilization of idle land and improvement in occupancy rates3×
  4. 3Building a Stable Earnings Structure and Improving Profitability2×
  5. 4Expanding Public- and Private-Sector Orders and Managing Construction Costs2×
  6. 5Addressing demand and reorganizing routes alongside public transport infrastructure development2×
  7. 6Track record of earnings recovery and improvement in the financial base2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Hiroshima Electric Railway's next results are scheduled for 2026-11-13. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.