Komori
West Japan Railway Company (9021) · InitiativeAdvanced

System Change in Railway Operations

First written in FY2016. 18 of 23 entries say "Advanced", first in FY2017-Q1. Latest entry: 2026-08-05.

23entries
11years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2017-Q1 – FY2019-Q1AdvancedFY2022 – 2026-08-052016: 320162017: 420172018: 320182019: 220192020: 220202021: 220212022: 120222023: 120232024: 120242025: 120252026: 32026
Same theme, other companies
Railway System Innovation through ICT and Open InnovationA theme 2 companies write about · 0 as a headwind · 2 as a tailwind

1 other company's latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. 2026-08-05AdvancedResults presentation

    「Remote inspection of ground facilities (IoT and sensor deployment) to begin sequentially」

    The company advanced railway operations system changes to the stage of beginning remote inspection of ground facilities using IoT and sensors.
  2. FY2026AdvancedAnnual report

    「• Launch of joint verification with NTT West in November toward applying optical-fiber sensing technology to the railway sector, using communications optical fiber as a vibration sensor to detect train locations, facility abnormalities and other conditions」

    Regarding system changes in railway operations, we launched joint verification of the use of optical fiber to detect train locations and facility abnormalities.
  3. 2026-05-01AdvancedResults presentation

    「Introduction of automated Shinkansen operation (Kanazawa–Tsuruga)」

    The company advanced railway operations system changes into plans for automated operation of the Hokuriku Shinkansen, remote inspections, sensor deployment and the use of generative AI.
  4. FY2025AdvancedAnnual report

    「• Initiatives toward introducing autonomous operation on the Shinkansen (aiming to begin on the Hokuriku Shinkansen in fiscal 2029 [December] and on the Sanyo Shinkansen in the 2030s [September])」

    Regarding system changes in railway operations, we set targets to begin autonomous operation on the Hokuriku Shinkansen in fiscal 2029 and on the Sanyo Shinkansen in the 2030s. The document also describes the launch of multifunctional railway heavy machinery and the application of generative AI to operations.
  5. FY2024AdvancedAnnual report

    「Completion of demonstration testing on a dedicated test track for the autonomous and platooning BRT development project (July), followed by public-road demonstration testing (November to February)」

    We advanced the system change in railway operations from completing demonstrations on a dedicated course for autonomous and platooning BRT to conducting demonstrations on public roads.
  6. FY2023AdvancedAnnual report

    「• Rebuilding the customer experience and realizing the station of the future with the opening of Osaka Station's Umekita area as a catalyst (full-screen platform doors, digital guidance linked to smartphones, facial-recognition ticket gates, interactive spaces and other features) • Establishing technology for autonomous operation and platooning BRT, and considering practical implementation in cooperation with local governments and other parties」

    We have translated system changes in railway operations into the customer experience at stations of the future, facial recognition, digital guidance, autonomous operation, platooning BRT and other initiatives.
  7. FY2022AdvancedAnnual report

    「We are advancing technology development that contributes to system changes in railway operations leading to further improvements in safety, reduced maintenance labor and lower fixed costs through simpler facilities, as well as energy conservation through reduced power consumption. • Technology development for converting trackside inspections to onboard inspections and maintaining facilities based on their condition」

    We are translating the Technology Vision initiatives into specific measures, including onboard inspections and condition-based maintenance, linking them not only to safety but also to reduced maintenance labor, lower fixed costs and energy conservation.
  8. FY2022-Q1RestatedAnnual report

    「To improve convenience on the Sanyo Shinkansen, we will optimize train operating arrangements in line with demand and establish a rolling-stock deployment structure through the introduction of the latest N700S trains, creating an environment in which Shinkansen trains can be used stably over the long term.」

    Regarding system changes in railway operations, we identified as initiatives the optimization of operating arrangements in line with demand and the establishment of a rolling-stock deployment structure through the introduction of N700S trains.
  9. FY2021AdvancedAnnual report

    「We are advancing technology development that contributes to system changes in railway operations leading to further improvements in safety, reduced maintenance labor and lower fixed costs through simpler facilities, as well as energy conservation through reduced power consumption. • Development of wireless ATC • Qualitative improvement in maintenance through the conversion of trackside inspections to onboard inspections」

    We are advancing the Technology Vision initiatives to deliver not only greater safety but also lower fixed costs, energy conservation and the conversion of inspections to onboard operations.
  10. FY2021-Q1RestatedAnnual report

    「In addition, as medium- to long-term challenges, and taking into account structural changes in the future use of railways and our creative businesses, we will work to improve our ability to respond to customer needs, raise productivity and reform work styles while also using digital technologies, thereby seeking to enhance corporate value over the longer term.」

    We continue to pursue higher future corporate value by responding to customer needs through digital technologies, raising productivity and reforming work styles.
  11. FY2020RestatedAnnual report

    「We formulated a Technology Vision to pursue innovation every day with various partners and take on the challenge of creating new value, and decided to advance R&D activities in line with that direction.」

    We are continuing R&D in line with the Technology Vision, focusing on wireless ATC, a system for responding to weather-related disasters, onboard inspection and other areas.
  12. FY2020-Q1AdvancedAnnual report

    「• Completion of the deployment of new 323 series trains on the Osaka Loop Line (June)」

    The deployment of new 323 series trains was completed under the Osaka Loop Line Renewal Project.
  13. FY2019RestatedAnnual report

    「We formulated a Technology Vision to pursue innovation every day with various partners and take on the challenge of creating new value, and decided to advance R&D activities in line with that direction.」

    We are continuing R&D in line with the Technology Vision and addressing issues including safety, maintenance work and energy conservation.
  14. FY2019-Q1AdvancedAnnual report

    「• Launch of the new onboard-based safety system (D-TAS) between Nishi-Hiroshima and Iwakuni stations on the Sanyo Main Line (May) • Development of wireless ATC, which ensures safe spacing between trains through continuous wireless communication (scheduled for introduction between Hashimoto and Wakayama stations on the Wakayama Line around spring 2023)」

    D-TAS began operation between Nishi-Hiroshima and Iwakuni stations on the Sanyo Main Line, and the introduction of wireless ATC was scheduled for around spring 2023.
  15. FY2018AdvancedAnnual report

    「We formulated a Technology Vision to pursue innovation every day with various partners and take on the challenge of creating new value, and decided to advance R&D activities in line with that direction.」

    We reorganized the system change in railway operations as our Technology Vision. We are advancing the R&D and implementation of onboard train control, a system for responding to weather-related disasters, sensor networks, track-facility diagnostic systems and other technologies.
  16. FY2018-Q3AdvancedAnnual report

    「• Development of a “track infrastructure diagnostic system” that uses onboard equipment to perform inspections previously conducted visually by staff, and trial introduction on the Sanyo Shinkansen (September of the same year) • Development and introduction of a “utility pole handling vehicle” to improve the efficiency of utility pole replacement work (October of the same year) • Development and introduction of a “rolling stock condition monitoring system” for conventional lines that automatically measures and records rolling stock condition when trains enter a rolling stock depot or other facility (scheduled for introduction in spring of the current year)」

    The track infrastructure diagnostic system progressed to trial introduction on the Sanyo Shinkansen and the utility pole handling vehicle was introduced, while plans for introducing the rolling stock condition monitoring system were also specified.
  17. FY2018-Q2AdvancedAnnual report

    「Development of a “utility pole handling vehicle” to improve the efficiency of utility pole replacement work (introduction from October onward)」

    The Company presented plans to introduce equipment to improve the efficiency of utility pole replacement work from October onward.
  18. FY2018-Q2AdvancedAnnual report

    「Development of a “track infrastructure diagnostic system” that uses onboard equipment to perform inspections previously conducted visually by staff (trial introduction in September)」

    The track infrastructure diagnostic system progressed to the trial introduction stage in September, giving concrete form to improved safety and work efficiency through technology.
  19. FY2017AdvancedAnnual report

    「On the Sanyo Shinkansen, to strengthen competitiveness while maintaining safety as a prerequisite, the Company began using the new ATC with the timetable revision in March of the current year, shortening average travel times between Shin-Osaka and Hakata by approximately 1 minute for “Nozomi” and “Mizuho” trains and approximately 15 minutes for “Kodama” trains.」

    The Company introduced the new ATC and demonstrated shorter travel times by train category.
  20. FY2017-Q3AdvancedAnnual report

    「To improve transportation quality in the Kinki area, the Company began commercial operation in December of the previous year of the new 323 series trains developed under the Osaka Loop Line Improvement Project to provide trains that are “safe and bright, spacious, quiet and comfortable.” It also proceeded with station improvements, restroom improvements and development beneath elevated tracks, including the renovation of Momodani Station, to improve customer satisfaction and renew the line’s image.」

    The Company began commercial operation of the new 323 series trains developed under the Osaka Loop Line Improvement Project and also proceeded with improvements to stations, restrooms and areas beneath elevated tracks.
  21. FY2017-Q2AdvancedAnnual report

    「To enter into a capital alliance with Nippon Signal Company,Limited, with which it has had a technical partnership since 2009, to promote the development, design and manufacture of new signal-system equipment, the Company acquired a portion of the shares of that company.」

    As a means of advancing technology development, the Company progressed to acquiring shares in Nippon Signal Company,Limited.
  22. FY2017-Q1AdvancedAnnual report

    「The Company announced the new 323 series trains scheduled for introduction on the Osaka Loop Line during the current fiscal year.」

    The Company specified a plan to introduce new trains as a measure to improve transportation quality and the value of railway lines.
  23. FY2016First statedAnnual report

    「The Company promoted technology development aimed at transforming railway operations through continuous innovation supporting “safety” and “CS,” while seeking to resolve challenges through technology, including training engineers and developing free-gauge train technology.」

    The Company links technological innovation supporting safety and customer satisfaction with system transformation in railway operations and engineer training.
Moved together

"Key Station Development and Enhancing the Value of Group Assets" moved the same way as this thread, in the same document, in 16 of its 22 moves.

161414141211★123456
  1. ★This thread
  2. 1Key Station Development and Enhancing the Value of Group Assets16×
  3. 2Improving Safety through the Safety Action Plan 201714×
  4. 3Improving Customer Satisfaction and Attracting Fans of JR West14×
  5. 4Station-centered community development in collaboration with local communities and tourism promotion14×
  6. 5Plan for Accumulation and Drawdown of the Provision for Major Shinkansen Railway Repairs12×
  7. 6Capturing demand from inbound tourists11×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for West Japan Railway Company yet. It last moved in the Results presentation of 2026-08-05: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.