How it moved
ProgressHeldSoftenedWorseAdvancedFY2018-Q1 – FY20262016: 320162017: 320172018: 220182019: 320192020: 320202021: 020212022: 220222023: 020232024: 220242025: 020252026: 12026
Same theme, other companies
Investment in aviation facilities and infrastructure renewal driven by industry needsA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「To meet the needs of the aviation industry, the Group made ¥2,147 million in capital investments, primarily in its airport real estate business. In the airport real estate business, the Group invested in replacement of air-conditioning units at the Maintenance Center Annex and west hangar, replacement of extra-high-voltage receiving and transformation equipment at the East Extra-High-Voltage Substation, and replacement of receiving and transformation equipment at the Utility Center Building, among other projects.」

    The Group made ¥2,147 million in capital investments during the fiscal year, advancing replacement of air-conditioning units, receiving and transformation equipment, heat meters and other existing facilities and infrastructure.
  2. FY2025-H1AdvancedAnnual report

    「Cash used in investing activities amounted to ¥3,148 million, compared with ¥2,864 million in the same period of the previous year. This was primarily due to payments for the acquisition of property, plant and equipment.」

    The Group spent ¥3,148 million on acquiring property, plant and equipment, making facility and real estate investments exceeding those of the same period of the previous year.
  3. FY2024AdvancedAnnual report

    「To meet the needs of the aviation industry, the Group made ¥3,594 million in capital investments, primarily in its real estate leasing business. In the real estate business, the Group invested in tenant fit-out work for the Fresh Center tenant at Building W-1 of the Tokyo International Airport Domestic Cargo Terminal and replacement of air-conditioning units at the Utility Center Building, among other projects. In the heat supply business, the Group invested in replacement of chillers at Energy Center R-9 and R-10, among other projects.」

    The Group made ¥3,594 million in capital investments in FY2024, advancing specific facility upgrades including tenant fit-out work at the domestic cargo terminal and replacement of air-conditioning units and chillers.
  4. FY2022AdvancedAnnual report

    「To meet the needs of the aviation industry, the Group made ¥1,899 million in capital investments, primarily in its real estate leasing business. In the real estate leasing business, the Group invested in the replacement of emergency generators at the Utility Center Building and the west hangar, among other projects.」

    The Group made ¥1,899 million in capital investments, advancing specific facility upgrades including replacement of emergency generators at facilities inside Haneda Airport, and replacement of heat meters and boilers.
  5. FY2022-Q3AdvancedAnnual report

    「In addition, during the third quarter, as part of its efforts to expand its business areas, the Group acquired land and buildings in Koshigaya, Saitama Prefecture, and began providing facilities to a customized-car company.」

    To expand its business areas, the Group acquired land and buildings in Koshigaya, Saitama Prefecture, and began providing facilities to a customized-car company. Facility and real estate investment has progressed to the acquisition and commencement-of-provision stage.
  6. FY2021-Q1AdvancedAnnual report

    「Total assets at the end of the first quarter of the current consolidated fiscal year were ¥106,136 million, an increase of ¥1,652 million from the end of the previous consolidated fiscal year. This mainly reflected an increase in advances included in other current assets for construction of the Kanto Gakuin University International Student Dormitory, scheduled for completion in March 2021, and the recognition of prepaid expenses for annual usage fees for national property.」

    An increase in advance payments related to construction of the Kanto Gakuin University International Student Residence reflects progress in facility and construction investment in off-airport real estate.
  7. FY2020AdvancedAnnual report

    「To meet the needs of the aviation industry, the Group made ¥7,153 million in capital investments, primarily in its real estate leasing business. In the real estate leasing business, the Group invested in the expansion and renovation of the Arc Building, construction of the Technical Center warehouse, and expansion of the Kobe hangar, among other projects.」

    The Group made ¥7,153 million in capital investments, advancing investments in the Arc Building and Technical Center warehouse at Haneda, the Kobe hangar, boiler replacement, and water, drainage and communications facilities.
  8. FY2020-Q3AdvancedAnnual report

    「Total assets at the end of the third quarter of the current consolidated fiscal year were ¥104,633 million, up ¥3,248 million from the end of the previous consolidated fiscal year. This reflected the completion of the Kobe Airport hangar extension and equipment warehouse, the increase in construction in progress related to the Arc Building in-flight catering plant expansion and renovation at Haneda Airport completed in January and the aircraft wastewater treatment facility (SD Plant) scheduled for completion in March, as well as an additional investment in Haneda Innovation City in Zone 1 of the former Haneda site.」

    The Group continues to invest in facilities and real estate through the completion of the Kobe Airport facilities, progress on the Haneda in-flight catering plant and SD Plant, and an additional investment in Haneda Innovation City.
  9. FY2020-Q2AdvancedAnnual report

    「Cash used in investing activities amounted to ¥4,088 million, compared with ¥10,434 million in the same period of the previous year. This was primarily due to payments for the acquisition of property, plant and equipment inside and outside Haneda Airport.」

    The Group spent ¥4,088 million on acquiring property, plant and equipment inside and outside Haneda Airport, continuing to invest in airport facilities and off-airport real estate.
  10. FY2020-Q1AdvancedAnnual report

    「Total assets at the end of the first quarter of the current fiscal year were ¥103,290 million, an increase of ¥1,905 million from the end of the previous consolidated fiscal year. The increase was due mainly to growth in construction in progress associated with the expansion and renovation of the Arc Building for an inflight catering plant in preparation for additional international flight slots at Haneda Airport, the expansion of a hangar at Kobe Airport and other projects, as well as the recognition of prepaid expenses for annual usage fees for national property.」

    The Arc Building expansion and renovation for the in-flight catering plant at Haneda Airport and the expansion of the hangar at Kobe Airport are progressing, increasing construction in progress by ¥1,905 million from the end of the previous consolidated fiscal year.
  11. FY2019AdvancedAnnual report

    「To meet the needs of the aviation industry, the Group made ¥13,611 million in capital investments, primarily in its real estate leasing business.」

    Capital investment increased to ¥13,611 million, including the acquisition of 5 hotels in Kyoto, boiler replacement, and construction work at Haneda facilities.
  12. FY2019-Q2AdvancedAnnual report

    「Cash used in investing activities was ¥10,434 million, compared with ¥1,801 million in the previous corresponding period. This was primarily attributable to the acquisition of 5 hotels in Kyoto as fixed assets.」

    The acquisition of 5 hotels in Kyoto resulted in ¥10,434 million of cash used in investing activities during the cumulative period, demonstrating the execution of a large-scale business investment.
  13. FY2018AdvancedAnnual report

    「To meet the needs of the aviation industry, the Group made ¥4,504 million in capital investments, primarily in its real estate leasing business.」

    Capital investment reached ¥4,504 million, including specific investments in the Kamata shared housing project, the Kawasaki Daishi shared housing project, boiler replacement and solar power generation facilities.
  14. FY2018-Q2AdvancedAnnual report

    「Total assets at the end of the second quarter of the current consolidated fiscal year were ¥87,840 million, an increase of ¥260 million from the end of the previous consolidated fiscal year. This mainly reflected an increase in construction in progress due to the acquisition of land for multi-unit housing and payments for solar power generation equipment construction.」

    The Group acquired land for a housing development and made payments for solar power generation facility construction, demonstrating concrete progress in facilities and real estate investment.
  15. FY2018-Q1AdvancedAnnual report

    「Total assets at the end of the first quarter of the current consolidated fiscal year were ¥89,947 million, an increase of ¥2,367 million from the end of the previous consolidated fiscal year. This mainly reflected an increase in construction in progress related to the start of solar power generation equipment construction in Heiwajima and boiler replacement work by Tokyo Airport Heating and Cooling Co., Ltd., as well as the recognition of prepaid expenses for annual usage fees for national property.」

    Construction began on solar power generation facilities in Heiwajima and boiler replacement work at Tokyo Airport Heating and Cooling, demonstrating concrete progress in capital investment.
  16. FY2017-Q3RestatedAnnual report

    「The Group regards as its business foundation the provision of facilities that complement airport functions, including shared-use facilities for airlines such as multipurpose comprehensive buildings, district heating and cooling facilities, aircraft washing facilities and aircraft wastewater treatment facilities, as well as facilities used by individual airlines, such as hangars, engine plants and training facilities. It will make new investments proactively as necessary, pursue expansion and improvement in business scale and earnings capacity, and work to secure stable rental income.」

    The Group has stated its policy of continuing to make new investments as necessary, expand business scale and earnings capacity, and secure stable rental income based on facilities that complement airport functions.
  17. FY2017-Q2RestatedAnnual report

    「The Group regards as its business foundation the provision of facilities that complement airport functions, including shared-use facilities for airlines such as multipurpose comprehensive buildings, district heating and cooling facilities, aircraft washing facilities and aircraft wastewater treatment facilities, as well as facilities used by individual airlines, such as hangars, engine plants and training facilities. It will make new investments proactively as necessary, pursue expansion and improvement in business scale and earnings capacity, and work to secure stable rental income.」

    The Group has reiterated its policy of continuing, as necessary, to make new investments and expand business scale and earnings capacity based on facilities that complement airport functions.
  18. FY2017-Q1RestatedAnnual report

    「The company will make new investments proactively as necessary, expand and improve its business scale and earning power, and work to secure stable rental income.」

    The Group has reiterated its policy of continuing to make new investments as necessary, based on shared-use facilities and training facilities for airlines as its business foundation.
  19. FY2016First statedAnnual report

    「To meet the needs of the aviation industry, the Group made ¥2,973 million in capital investments, primarily in its real estate leasing business.」

    Capital investments were made in a hotel, the Kitakyushu Airport hangar, heat supply facilities, solar power generation facilities and other assets.
Moved together

"Expanding Business Scale and Earnings Power and Securing Stable Rental Income" moved the same way as this thread, in the same document, in 12 of its 19 moves.

1277754★123456
  1. ★This thread
  2. 1Expanding Business Scale and Earnings Power and Securing Stable Rental Income12×
  3. 2Off-Airport Hotel and Multi-Unit Housing Development7×
  4. 3Facility and equipment development to accommodate capacity expansion at Tokyo International Airport7×
  5. 4Expansion of facilities at regional airports and consideration of participation in the operation of airports under private-sector initiatives7×
  6. 5Continuing stable dividends while maintaining retained earnings5×
  7. 6Complementing the Board of Directors’ Oversight Function through the Nomination and Compensation Committees4×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Airport Facilities's next results are scheduled for 2026-10-29. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Capital investment to meet the needs of the aviation industry | AIRPORT FACILITIES Co.,LTD. (8864) | Komori