Airport Facilities (8864) · InitiativeRestated

Facility and equipment development to accommodate capacity expansion at Tokyo International Airport

First written in FY2016. 8 of 15 entries say "Advanced", first in FY2018. Latest entry: FY2021-Q2.

15entries
5years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY2018-Q3AdvancedFY2018 – FY2021-Q12016: 320162017: 220172018: 220182019: 420192020: 42020
Same theme, other companies
Strengthening Haneda Airport Access and Investment in Surrounding DevelopmentA theme 3 companies write about · 0 as a headwind · 4 as a tailwind

0 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2021-Q2RestatedAnnual report

    「In the real estate leasing business, operations at the Technical Center warehouse building and Arc Building inflight catering plant at Haneda Airport, and the expanded hangar building at Kobe Airport, all completed since December 2019, contributed to net sales of ¥9,545 million, up 1.5% year on year.」

    Completed facilities at Haneda Airport and Kobe Airport continued to operate and contribute to higher sales in the real estate leasing business. This is a continuing confirmation of the operating performance of existing facilities, not a report of newly completed facilities.
  2. FY2021-Q1AdvancedAnnual report

    「In the real estate leasing business, operations at the Technical Center warehouse building and Arc Building inflight catering plant at Haneda Airport, and the expanded hangar building at Kobe Airport, all completed since December 2019, contributed to net sales of ¥4,738 million, up 2.2% year on year, and operating income of ¥907 million, up 0.1%.」

    The Technical Center warehouse building and Arc Building inflight catering plant at Haneda Airport, and the expanded Kobe Airport hangar building, began operations after completion and contributed to net sales and operating income in the real estate leasing business.
  3. FY2020AdvancedAnnual report

    「In the real estate leasing business, factors included progress in tenant occupancy at Haneda Airport, the Kyoto hotel operating for the full year after beginning operations in late June 2018, the start of leasing training aircraft to the Civil Aviation College in April 2019, the start in December of leasing the expanded Kobe Airport hangar building and the aircraft-equipment warehouse at Haneda Airport, and the start in January 2020 of leasing the expanded and renovated Arc Building as an inflight catering plant.」

    The expanded Kobe Airport hangar building, the aircraft-equipment warehouse and the conversion of the Arc Building at Haneda Airport into an inflight catering plant were completed and began operations as leased facilities. In addition, in anticipation of tightening supply capacity at Haneda Airport, the Group is considering expanding its heat-supply facilities.
  4. FY2020-Q3AdvancedAnnual report

    「In the real estate leasing business, net sales were ¥14,003 million, up 3.4% year on year, and operating income was ¥2,654 million, up 10.9%. This reflected progress in tenant occupancy at Haneda Airport, rent increases under some existing contracts, the Kyoto hotel operating for the full year after beginning operations in late June two years ago, the start of leasing training aircraft to the Civil Aviation College in April last year, and the start of leasing the expanded hangar building and aircraft-equipment warehouse at Kobe Airport, completed in December.」

    The expanded Kobe Airport hangar building and aircraft-equipment warehouse were completed in December and began operations as leased facilities. At Haneda, expansion and renovation of the Arc Building into an inflight catering plant was completed in January, and construction of the new SD Plant was scheduled for completion in March, bringing facility development close to completion.
  5. FY2020-Q2AdvancedAnnual report

    「Total assets at the end of the second quarter of the current fiscal year were ¥104,905 million, an increase of ¥3,520 million from the end of the previous consolidated fiscal year, due mainly to growth in construction in progress associated with the expansion and renovation of the Arc Building into an inflight catering plant at Haneda Airport, the construction of a new SD Plant, the construction of a new warehouse building at the Technical Center, and the expansion of a hangar at Kobe Airport, all scheduled for completion during the fiscal year.」

    In addition to the inflight catering plant, SD Plant and Technical Center warehouse building at Haneda Airport, expansion work on the Kobe Airport hangar is progressing as part of the specific facility plan scheduled for completion during the fiscal year.
  6. FY2020-Q1AdvancedAnnual report

    「Total assets at the end of the first quarter of the current fiscal year were ¥103,290 million, an increase of ¥1,905 million from the end of the previous consolidated fiscal year. The increase was due mainly to growth in construction in progress associated with the expansion and renovation of the Arc Building for an inflight catering plant in preparation for additional international flight slots at Haneda Airport, the expansion of a hangar at Kobe Airport and other projects, as well as the recognition of prepaid expenses for annual usage fees for national property.」

    The expansion and renovation of the Arc Building at Haneda Airport in preparation for additional international flight slots, and the hangar expansion at Kobe Airport, are progressing as increases in construction in progress.
  7. FY2019AdvancedAnnual report

    「At Haneda Airport, an increase of 39,000 annual takeoff and landing slots was scheduled for 2020. The Group decided to develop facilities to accommodate the increase in international flights accompanying growing inbound demand. As concrete initiatives, it is expanding and renovating the Arc Building before the Olympics to provide it as an inflight catering plant, establishing a new warehouse for onboard equipment, and relocating the aircraft wastewater treatment facility, the SD Plant, to substantially increase its processing capacity.」

    In anticipation of an increase of 39,000 takeoff and landing slots at Haneda Airport, the Group has outlined specific facility plans: converting the Arc Building into an inflight catering plant, establishing a new warehouse for onboard equipment, and relocating the SD Plant.
  8. FY2019-Q3AdvancedAnnual report

    「Although foreign-exchange gains and losses at the Singapore subsidiary improved, ordinary income was ¥2,824 million, down 4.8% year on year, due mainly to the recognition of a provision for the cost of demolishing the Arc Building in connection with the expansion and renovation of a new inflight catering plant at Tokyo International Airport, which began in late January 2019, and other factors.」

    The Group began work on the expansion and renovation of a new inflight catering plant at Tokyo International Airport and recognized a provision for the cost of demolishing the existing building. Development of the inflight catering plant has moved into the implementation phase.
  9. FY2018AdvancedAnnual report

    「At Haneda Airport, we are working to reuse space by drawing on our accumulated knowledge and skills, renovating existing facilities to meet customer needs, and establishing facilities including crew training centers and an inflight catering plant. We are also working to provide apartments and hotels in response to the growing number of airport employees and users. In March this year, we began providing the fourth apartment complex for airport employees near Haneda Airport.」

    In addition to renovating existing facilities and establishing a crew training center and an inflight catering plant, the Group began providing its fourth apartment complex for airport employees near Haneda.
  10. FY2018-Q3RestatedAnnual report

    「The Group recognizes the issue of how to contribute to the development and enhancement of ground facilities in light of the further expansion of Tokyo International Airport's capacity and the expected increase in training demand.」

    The Group continues to indicate its recognition of the need to respond to the development and enhancement of ground facilities in anticipation of expanded capacity at Tokyo International Airport and increased training demand.
  11. FY2018-Q1RestatedAnnual report

    「For the cumulative first quarter of the current fiscal year, consolidated net sales were ¥5,503 million, up 5.5% year on year, operating income was ¥1,040 million, up 2.9%, ordinary income was ¥1,034 million, up 0.8%, and quarterly net income attributable to owners of the parent was ¥595 million, up 0.5%.」

    The Group explains that the leasing of space within Haneda Airport progressed and the utilization of airport facilities contributed to performance.
  12. FY2017-Q3RestatedAnnual report

    「To promote the reuse of leased space at Tokyo International Airport, the Group is identifying new demand for flight-operations support facilities, aviation-related facilities and other facilities arising from the expansion of airport capacity, and is actively seeking to utilize its facilities, with results emerging.」

    The Group continues measures to identify demand for new flight-operations support facilities and aviation-related facilities arising from the expansion of capacity at Haneda Airport and reuse leased space.
  13. FY2017-Q2RestatedAnnual report

    「To promote the reuse of leased space at Tokyo International Airport, the Group is identifying new demand for flight-operations support facilities, aviation-related facilities and other facilities arising from the expansion of airport capacity, and is actively seeking to utilize its facilities, with results emerging.」

    The Group continues its policy of identifying new facility demand arising from the expansion of capacity at Haneda Airport and reusing leased space.
  14. FY2017-Q1RestatedAnnual report

    「To promote the reuse of leased space at Tokyo International Airport, the Group is identifying new demand for flight-operations support facilities, aviation-related facilities and other facilities arising from the expansion of airport capacity, and is actively seeking to utilize its facilities.」

    The Group continues its policy of identifying demand for new flight-operations support facilities and aviation-related facilities arising from the expansion of capacity at Haneda Airport and utilizing existing facilities.
  15. FY2016First statedAnnual report

    「The Group is providing new aviation-related facilities, including through the renewal of existing facilities, and is proceeding with upgrades to related equipment in anticipation of increased demand for heat supply within the airport.」

    The Group's policy is to develop aviation-related facilities and heat-supply equipment in anticipation of increased international flight slots and expanded airport functions at Haneda Airport.
Moved together

"Capital investment to meet the needs of the aviation industry" moved the same way as this thread, in the same document, in 7 of its 15 moves.

776533★123456
  1. ★This thread
  2. 1Capital investment to meet the needs of the aviation industry7×
  3. 2Expansion of facilities at regional airports and consideration of participation in the operation of airports under private-sector initiatives7×
  4. 3Expanding Business Scale and Earnings Power and Securing Stable Rental Income6×
  5. 4Off-Airport Hotel and Multi-Unit Housing Development5×
  6. 5Pressure on heat supply earnings from higher electricity and gas prices and rising repair costs3×
  7. 6Responding to Demand for Pilot Training and Expanding Simulator Facilities3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Airport Facilities's next results are scheduled for 2026-10-29. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Facility and equipment development to accommodate capacity expansion at Tokyo International Airport | AIRPORT FACILITIES Co.,LTD. (8864) | Komori