Komori
Fukuoka Financial Group (8354) · TargetAdvanced

Zero project finance outstanding for the construction of coal-fired power plants by fiscal 2035

First written in FY2023. 3 of 4 entries say "Advanced", first in FY2024. Latest entry: FY2026.

4entries
4years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2023AdvancedFY2024 – FY20262023: 120232024: 120242025: 120252026: 12026
Same theme, other companies
Phased reduction and elimination of investment and financing exposure to coal-fired power generationA theme 3 companies write about · 0 as a headwind · 3 as a tailwind

1 other company's latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「The Group’s project finance loans outstanding for the construction of coal-fired power plants totaled ¥1.6 billion as of the end of March 2026, and the Company will reduce the balance to zero by around fiscal 2035.」

    Outstanding project finance for the construction of coal-fired power plants decreased from ¥1.9 billion to ¥1.6 billion, and the target of reducing the balance to zero by around fiscal 2035 continues.
  2. FY2025AdvancedAnnual report

    「The Group’s project finance loans outstanding for the construction of coal-fired power plants totaled ¥1.9 billion as of the end of March 2025, and the Company will reduce the balance to zero by around fiscal 2035.」

    Outstanding project finance for the construction of coal-fired power plants decreased from ¥2.1 billion to ¥1.9 billion, and the target of reducing the balance to zero by around fiscal 2035 continues.
  3. FY2024AdvancedAnnual report

    「The Group’s project finance loans outstanding for the construction of coal-fired power plants totaled ¥2.1 billion as of the end of March 2024, and the Company will reduce the balance to zero by around fiscal 2035.」

    Project finance outstanding for the construction of coal-fired power plants decreased from ¥2.3 billion to ¥2.1 billion, and the target of reducing the balance to zero by around fiscal 2035 continues.
  4. FY2023First statedAnnual report

    「The Group’s project finance loans outstanding for the construction of coal-fired power plants totaled ¥2.3 billion as of the end of March 2023, and the Company will reduce the balance to zero by around fiscal 2035.」

    The Company newly disclosed a target of reducing the ¥2.3 billion of project finance outstanding for the construction of coal-fired power plants to zero by around fiscal 2035.
Moved together

"Growth in deposits and steady lending to corporate and individual customers" moved the same way as this thread, in the same document, in 3 of its 4 moves.

333333★123456
  1. ★This thread
  2. 1Growth in deposits and steady lending to corporate and individual customers3×
  3. 2Decrease in consolidated ordinary profit and net income attributable to owners of the parent3×
  4. 3¥6.50 interim dividend per common share for the 10th fiscal period3×
  5. 4Performance-linked dividends and a consolidated payout ratio of approximately 30%3×
  6. 5Increase in net interest income3×
  7. 6Strengthening group-wide risk management and compliance systems3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Fukuoka Financial Group's next results are scheduled for 2026-11-10. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.