Reconstruction and reopening of stores damaged in the Great East Japan Earthquake
First written in FY2018-Q1. 1 of 2 entries say "Advanced", first in FY2019-Q1. Latest entry: FY2019-Q1.
No other company in this theme has enough history to compare yet.
- FY2019-Q1AdvancedAnnual report
「The H&G Naraha store in Naraha, Fukushima Prefecture, had been forced to suspend operations because of the Great East Japan Earthquake in March 2011. In line with the town's reconstruction plan and following numerous requests from local residents, it reopened after approximately 7 years. The company will continue working to help local residents in any way it can.」
The store in Naraha, Fukushima Prefecture, which had suspended operations because of the Great East Japan Earthquake, reopened after approximately 7 years in line with the reconstruction plan. - FY2018-Q1First statedAnnual report
「The HC store in Rikuzentakata, Iwate Prefecture, was swept away by the tsunami from the Great East Japan Earthquake in March 2011 and was forced to close. Preparations were made in line with the city's reconstruction plan, and the store reopened after 6 years.」
The initiative to prepare for and reopen the Rikuzentakata store, which was swept away by the tsunami from the Great East Japan Earthquake, after 6 years in line with the reconstruction plan is described for the first time.