Komori
Iwatani (8088) · InitiativeAdvanced

Construction of a Renewable Energy-Based Hydrogen Energy System in Fukushima Prefecture

First written in FY2019-Q2. 5 of 9 entries say "Advanced", first in FY2019. Latest entry: 2026-05-14.

9entries
9years
1from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2020-Q3 – FY2020RestatedFY2021AdvancedFY2024 – 2026-05-142018: 12019: 220192020: 220202021: 120212022: 020222023: 020232024: 120242025: 120252026: 12026
Same theme, other companies
Construction and operation of the Fukushima Renewable Energy Research Field hydrogen system (FH2R)A theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. 2026-05-14AdvancedRevisions to earnings forecasts

    「福島水素エネルギー研究フィールドで製造した再生可能エネルギー由来の水素を原料として、福島第一原子力発電所構内の溶接型タンク解体工事に供給しました。」

    福島水素エネルギー研究フィールドについて、製造した水素の実際の工事現場への供給へ進展した。
  2. FY2025AdvancedAnnual report

    「At the Fukushima Hydrogen Energy Research Field (FH2R) (Namie, Fukushima Prefecture), we continued supplying hydrogen gas to commercial hydrogen stations and fuel cells installed at facilities in the prefecture. The contract with NEDO has been extended through fiscal 2025, and we will work to optimise the operation of hydrogen production equipment and hydrogen supply-demand management to reduce hydrogen production costs.」

    For FH2R, the NEDO contract was extended through fiscal 2025, and the project progressed to continued supply to commercial facilities and other sites, along with optimisation of production and supply-demand management.
  3. FY2024AdvancedAnnual report

    「At the Fukushima Hydrogen Energy Research Field (FH2R) in Namie, Fukushima Prefecture, we extended our contract with NEDO through fiscal 2025 and continued supplying hydrogen to commercial hydrogen stations and fuel cells installed at facilities in the prefecture. We also began initiatives to reduce hydrogen production costs, including optimisation of hydrogen supply and demand management.」

    The renewable-energy-powered hydrogen system in Fukushima Prefecture progressed to the stage of continuing supply and reducing hydrogen production costs after completion and the start of operations.
  4. FY2021RestatedAnnual report

    「At the Fukushima Hydrogen Energy Research Field (FH2R) (Namie, Fukushima Prefecture), completed in March 2020, we continued efforts to establish practical Power-to-Gas technology.」

    Following completion of the Fukushima Hydrogen Energy Research Field, efforts to establish practical Power-to-Gas technology have continued.
  5. FY2020AchievedAnnual report

    「The Fukushima Hydrogen Energy Research Field, in which we participate and which is equipped with one of the world's largest hydrogen production systems using renewable energy, has been completed and commenced operations.」

    For the renewable-energy-powered hydrogen system in Fukushima Prefecture, it describes completion and the start of operations following the commencement of construction.
  6. FY2020-Q3AdvancedAnnual report

    「In fiscal 2020, liquefied hydrogen is scheduled to be transported by sea and handled at an import terminal.」

    For the renewable-energy-derived hydrogen and liquefied hydrogen supply chain being developed in Fukushima Prefecture and elsewhere, it presents specific plans for marine transport and cargo handling at an import terminal in fiscal 2020.
  7. FY2020-Q1RestatedAnnual report

    「In Fukushima Prefecture, we are also participating in the Fukushima New Energy Social Concept, which uses electricity generated from renewable energy sources such as solar and wind power to produce hydrogen. CO2-free hydrogen produced in Fukushima Prefecture will be transported to the Tokyo metropolitan area, where demand is concentrated, and used as fuel for FCVs and other applications at the 2020 Tokyo Olympic and Paralympic Games.」

    For hydrogen produced from renewable energy in Fukushima Prefecture, it continues to present plans to transport the hydrogen to the Tokyo metropolitan area and use it as fuel for FCVs in 2020.
  8. FY2019AdvancedAnnual report

    「④Construction of hydrogen transport, storage and supply systems as part of the development of one of the world's largest hydrogen energy systems using renewable energy」

    For the renewable-energy-powered hydrogen system whose construction began in Fukushima Prefecture, the transport, storage and supply systems have been developed into a specific research and development project.
  9. FY2019-Q2First statedAnnual report

    「In July, we launched the Kitakyushu Hydrogen Town demonstration and PR project, and in August began construction in Fukushima Prefecture of one of the world's largest hydrogen energy systems using renewable energy.」

    It states that construction of one of the world's largest hydrogen energy systems using renewable energy began in Fukushima Prefecture in August.
Moved together

"Realizing a Hydrogen Energy Society" moved the same way as this thread, in the same document, in 6 of its 9 moves.

654333★123456
  1. ★This thread
  2. 1Realizing a Hydrogen Energy Society6×
  3. 2Building a Liquefied Hydrogen Supply Chain5×
  4. 3Open research and development centered on the Central Research Institute4×
  5. 4Addressing Social Issues and Achieving Sustainable Growth Through PLAN273×
  6. 5Expansion of integrated energy and lifestyle services3×
  7. 6Capital Investment Plan for LP Gas Terminals and High-Pressure Gas Facilities3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Iwatani's next results are scheduled for 2026-11-10. Read the earnings preview It last moved in the Revisions to earnings forecasts of 2026-05-14: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.