Komori
Wood One (7898) · RiskMaterialised

Risk of Disruptions to Production, Logistics and Sales Activities Caused by Natural Disasters

First written in FY2016. 3 of 4 entries say "Materialised", first in FY2019-Q3. Latest entry: FY2023.

4entries
8years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2016MaterialisedFY2019-Q3 – FY20232016: 120162017: 020172018: 020182019: 220192020: 020202021: 020212022: 020222023: 12023
Same theme, other companies

The whole theme swung hardest in 2018: 36 of 132 companies on the "Worse" side.

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 188 companies compared. The sentences above are computed from all 188.Comparing 200 of the theme's 588 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2023MaterialisedAnnual report

    「The Company recorded ¥143 million in losses from a cyclone disaster that occurred at a New Zealand subsidiary in February 2023 as an extraordinary loss.」

    A cyclone disaster occurred at a New Zealand subsidiary, and ¥143 million in disaster-related losses were recorded.
  2. FY2019MaterialisedAnnual report

    「However, recovery efforts following the successive natural disasters that occurred from last summer also contributed to delays in construction schedules by exacerbating the chronic shortage of skilled workers.」

    It is explained that successive natural disasters and the associated recovery efforts affected the shortage of skilled workers, delays in construction schedules and deteriorating earnings in the domestic business.
  3. FY2019-Q3MaterialisedAnnual report

    「In the housing industry, the number of new housing starts, which had been trending downward year on year in the first half, increased moderately in the third quarter. In addition to recovery efforts following the successive natural disasters that occurred from last summer, the chronic shortage of skilled workers has become more serious, and delays in construction schedules have become an industry-wide issue.」

    It is explained that successive natural disasters since last summer and the associated recovery efforts have contributed to the worsening shortage of skilled workers and delays in construction schedules.
  4. FY2016First statedAnnual report

    「Large-scale natural disasters such as earthquakes, tsunamis and typhoons may affect the Group’s production, logistics and sales activities. Although the Group has introduced a safety confirmation system, conducted disaster preparedness drills and taken out earthquake insurance, these measures cannot completely prevent damage from natural disasters and may affect the Group’s financial position and performance.」

    Safety confirmation, disaster preparedness drills and earthquake insurance are listed as countermeasures, while acknowledging that complete avoidance is difficult.
Moved together

"Impact of foreign exchange movements on overseas subsidiary earnings and borrowings" moved the same way as this thread, in the same document, in 3 of its 4 moves.

32★12
  1. ★This thread
  2. 1Impact of foreign exchange movements on overseas subsidiary earnings and borrowings3×
  3. 2Risks from Shortages of Skilled Workers and Rising Land, Freight and Material Prices2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Wood One's next results are scheduled for 2026-11-11. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.