Komori
C.S. Lumber Co.,Inc (7808) · RiskRestated

Declining rental income and real estate impairment caused by lease cancellations

First written in FY2017. 4 of 6 entries say "Restated". Latest entry: FY2022.

6entries
5years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseMaterialisedFY2017RestatedFY2018 – FY2019MitigatedFY2020RestatedFY2021 – FY20222018: 120182019: 220192020: 120202021: 120212022: 12022
Same theme, other companies

The whole theme swung hardest in 2020: 51 of 96 companies on the "Worse" side.

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 189 companies compared. The sentences above are computed from all 189.Comparing 200 of the theme's 420 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2022RestatedAnnual report

    「新規の賃貸開始前に保育所事業者に関する情報を収集して与信判断するとともに、介護事業を含めて事業者の分散を図っております。」

    賃料減額・契約解除リスクに対する事前与信と保育所・介護事業者の分散を継続している。
  2. FY2021RestatedAnnual report

    「新規の賃貸開始前に保育所事業者に関する情報を収集して与信判断するとともに、介護事業を含めて事業者の分散を図っております。」

    賃料減額・契約解除リスクに対する事前与信と事業者分散の対応を継続している。
  3. FY2020MitigatedAnnual report

    「新規の賃貸開始前に保育所事業者に関する情報を収集して与信判断するとともに、事業者の分散を図っております。」

    賃料減額・契約解除による収益減少リスクに対し、賃貸開始前の与信判断と事業者分散を対応策として明示している。
  4. FY2019RestatedAnnual report

    「今後、賃貸料の減額、契約解除等が発生した場合、当社グループの経営成績及び財政状態に影響を及ぼす可能性があります。」

    賃貸料減額・契約解除による収益減少や不動産価値への影響を継続して記載している。
  5. FY2018RestatedAnnual report

    「今後、賃貸料の減額、契約解除等が発生した場合、当社グループの経営成績及び財政状態に影響を及ぼす可能性があります。」

    賃貸料減額・契約解除による収益減少や不動産価値への影響をリスクとして再掲している。当期は減損損失の計上はなかった。
  6. FY2017MaterialisedAnnual report

    「上記の賃貸不動産については、賃貸先との契約解除に伴い、帳簿価額を回収可能価額まで減額し、減損損失を計上しております。」

    当期は千葉市中央区の賃貸不動産について減損損失61,517千円を計上。前期にも25,416千円を計上している。
Moved together

"Fluctuations in imported timber prices, foreign exchange rates and transportation costs" moved the same way as this thread, in the same document, in 2 of its 6 moves.

22★12
  1. ★This thread
  2. 1Fluctuations in imported timber prices, foreign exchange rates and transportation costs2×
  3. 2Shortages, financial distress and schedule delays among subcontractors in the construction-contracting business2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for C.S. Lumber Co.,Inc yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Declining rental income and real estate impairment caused by lease cancellations | C.S. LUMBER CO.,INC (7808) | Komori