Natural Disaster and Damage Risks for Renewable Energy Facilities

First written in FY2022. 5 of 9 entries say "Materialised", first in FY2022. Latest entry: 2026-10-15.

9entries
5years
3from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseMaterialisedFY2022 – FY2024-Q1MitigatedFY2024-Q2MitigatedFY2025-H1 – 2026-07-312022: 120222023: 220232024: 220242025: 120252026: 32026
Same theme, other companies
Risk of Damage to Solar Power Generation Equipment from Typhoons and Other EventsA theme 8 companies write about · 8 as a headwind · 1 as a tailwind

1 other company's latest entry also says "Materialised".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2025MitigatedAnnual report

    「Business interruption compensation for the period during which generation was suspended was received in January 2025 and recorded during the fourth-quarter consolidated accounting period.」

    Following the cable-cutting damage at the Tochigi Prefecture power plant, restoration work was completed and business interruption compensation was received. Measures using insurance and compensation against natural disaster and theft risks progressed.
  2. FY2025-H1MitigatedAnnual report

    「Restoration work for the damage caused by the cutting of part of the electrical cables at Akuto Solar Park, a power generation plant in Tochigi Prefecture owned and managed by our group, was completed in early August 2024.」

    Regarding the cable-cutting damage in February 2024, restoration work was completed in early August 2024. Business interruption compensation for the period during which generation was suspended has not yet been received and procedures are under way, while measures including the use of a security company, police patrols and additional security sensors have been implemented.
  3. FY2024MaterialisedAnnual report

    「In February 2024, part of the electrical cables at Akuto Solar Park, a power generation plant in Tochigi Prefecture owned and managed by our group, was cut, causing damage.」

    Following the theft in March 2023, cable-cutting damage recurred in February 2024, reducing generation capacity by approximately half. We recorded restoration costs of ¥13 million as an extraordinary loss and are considering additional measures.
  4. FY2024-Q2MitigatedAnnual report

    「Part of the cables at a power generation plant owned by our group in Tochigi Prefecture was stolen in March 2023. Restoration work was completed during the second-quarter consolidated accounting period, and we have also received insurance proceeds covering the restoration costs and business interruption compensation.」

    Following the cable theft at the Tochigi Prefecture power plant, restoration work was completed, and insurance proceeds covering restoration costs and business interruption compensation were received.
  5. FY2024-Q1MaterialisedAnnual report

    「In March 2023, part of the cables at a power generation plant owned by our group in Tochigi Prefecture was stolen.」

    Part of the cables at an owned power generation plant was stolen, and we plan to file insurance claims for restoration work, the associated costs and business interruption compensation.
  6. FY2022MaterialisedAnnual report

    「This represents our share of the loss determined in March 2022 in connection with damage caused by a slope collapse at a solar power generation facility in Nahari, Kochi Prefecture, for which we provide maintenance and other services.」

    A slope collapse occurred at a solar power generation facility, and we recorded our share of the burden, ¥11 million, as a loss from a natural disaster.
Moved together

"Output Curtailment in Solar Power Generation" moved the same way as this thread, in the same document, in 5 of its 9 moves.

544433★123456
  1. ★This thread
  2. 1Output Curtailment in Solar Power Generation5×
  3. 2Expansion of the Renewable Energy Business and Early Return to Profitability4×
  4. 3Management Indicators Emphasizing ROE, Net Assets and Free Cash Generation Capacity4×
  5. 4Integrated New Business Development for an Integrated Energy Business by the New Functions Development Division4×
  6. 5Diversification of revenue sources and improved capital efficiency in the dealing business3×
  7. 6Full-Scale Entry into the Retail Electricity Business and Acquisition Platform3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Astmax's next results are scheduled for 2026-11-02. Read the earnings preview It last moved in the Monthly of 2026-10-15: "Materialised".