Namura Shipbuilding (7014) · RiskMaterialised
Extensive rework due to design defects at the Imari Plant
First written in FY2020-Q2. 2 of 2 entries say "Materialised", first in FY2020-Q2. Latest entry: FY2020-Q3.
2entries
2years
0from disclosures
How it moved
Same theme, other companies
Risk of Rework Costs and Liability for Damages Due to Design DefectsA theme 2 companies write about · 2 as a headwind · 0 as a tailwind
Namura Shipbuilding moved to the "Worse" side of this theme in 2019.
0 other companies' latest entry also says "Materialised".
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
- FY2020-Q3MaterialisedAnnual report
「Extensive rework occurred at our Imari facility」
Extensive rework stemming from design defects at the Imari facility continues to appear in the results as a factor behind the increase in provisions for loss on construction contracts. - FY2020-Q2MaterialisedAnnual report
「Extensive rework resulting from design defects occurred at our Imari facility」
Extensive rework caused by design defects actually occurred at the Imari facility and was cited as a factor behind the increase in provisions for loss on construction contracts in the newbuild business.