Strengthening Product- and System-Level Quality Management

First written in FY2016. 6 of 8 entries say "Advanced", first in FY2017. Latest entry: FY2025.

8entries
10years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2017 – FY2019AdvancedFY2022 – FY20252016: 120162017: 120172018: 120182019: 120192020: 020202021: 120212022: 120222023: 120232024: 020242025: 12025
Same theme, other companies
Strengthening the Framework for Product Quality Assurance and Safety Regulatory ComplianceA theme 36 companies write about · 1 as a headwind · 35 as a tailwind

6 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 36 companies compared. The sentences above are computed from all 36.
Full recordFilings, disclosures and news, newest first
  1. FY2025AdvancedAnnual report

    「The principal capital investments made by the Group during the consolidated fiscal year were, mainly, a complete verification environment for system testing of new features and technical support, and a complete set of products for customer demonstrations.」

    The Company invested ¥88.940 million in a verification environment and products for customer demonstrations, specifically strengthening equipment for quality verification, support and proposals.
  2. FY2023AdvancedAnnual report

    「The principal capital investments made by the Group during the consolidated fiscal year were a complete verification environment, mainly for system testing of new features and technical support, and inspection equipment for conducting shipment tests on the Company's products.」

    The Company continued investing in a verification environment and inspection equipment for shipment testing, bringing total capital investment to ¥74.831 million. This increased from ¥29.620 million in the previous fiscal year, indicating specific strengthening of the quality verification and shipment inspection framework.
  3. FY2022AdvancedAnnual report

    「The principal capital investments made by the Group during the consolidated fiscal year were a complete verification environment, mainly for system testing of new features and technical support, and inspection equipment for conducting shipment tests on the Company's products.」

    The Company continued investing in a verification environment and inspection equipment for shipment testing, bringing total capital investment to ¥29.620 million. It is specifically strengthening its quality control framework for design verification and shipment inspections.
  4. FY2021RestatedAnnual report

    「The principal capital investments made by the Group during the consolidated fiscal year were a complete verification environment, mainly for system testing of new features and technical support, and inspection equipment for conducting shipment tests on the Company's products.」

    The Company continued investing in a verification environment and inspection equipment for shipment testing, bringing total capital investment to ¥28.129 million. There was no change in the direction of its quality control measures.
  5. FY2019AdvancedAnnual report

    「All of the Company's products undergo shipment inspections, and the inspection process is critical in determining whether products should be shipped. Enhancing the inspection equipment is intended to ensure durability against changes in the operating environment and the stability and reliability of functions capable of withstanding long-term use, thereby enabling the supply of products, as well as to conduct efficient inspections compatible with mass production. Total capital investment during the consolidated fiscal year was ¥39.872 million.」

    The Company invested a total of ¥39.872 million in a verification environment for new features and inspection equipment for shipment testing, specifically establishing a quality control framework for design verification and shipment inspections.
  6. FY2018AdvancedAnnual report

    「All of the Company's products undergo shipment inspections, and the inspection process is critical in determining whether products should be shipped. Enhancing the inspection equipment is intended to ensure durability against changes in the operating environment and the stability and reliability of functions capable of withstanding long-term use, thereby enabling the supply of products, as well as to conduct efficient inspections compatible with mass production. Total capital investment during the consolidated fiscal year was ¥43.154 million.」

    The Company invested ¥43.154 million in a verification environment for new features and inspection equipment for shipment testing, specifically strengthening its quality control framework for design verification and shipment inspections.
  7. FY2017AdvancedAnnual report

    「The principal capital investments made by the Group during the consolidated fiscal year were a complete verification environment for system testing of new features and technical support, and inspection equipment for conducting shipment tests on the Company's products. … Total capital investment during the consolidated fiscal year was ¥152.372 million.」

    The Company invested in a verification environment for new features and inspection equipment for shipment testing, specifically strengthening its quality verification and shipment inspection framework.
  8. FY2016First statedAnnual report

    「In addition to focusing on the continual improvement of ISO9001, we will thoroughly educate and guide not only companies within our Group but also outsourced manufacturers, and strengthen our overall quality control system from design checks through pre-shipment inspections and post-shipment support.」

    It cites ISO 9001, training for contractors, and process management covering the entire process from design and shipment through support.
Moved together

"Sharing Value with Employees Through a Share Benefit Trust" moved the same way as this thread, in the same document, in 6 of its 8 moves.

655444★123456
  1. ★This thread
  2. 1Sharing Value with Employees Through a Share Benefit Trust6×
  3. 2Containing SG&A through ongoing expense reduction5×
  4. 3Service and Support Structure Closely Aligned with Customers' Businesses5×
  5. 4Securing Stable Revenue Sources4×
  6. 5Development of Next-Generation IP Products and a Product Roadmap4×
  7. 6Risk of dependence on third-party manufacturers4×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Media Links yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Strengthening Product- and System-Level Quality Management | MEDIA LINKS CO.,LTD. (6659) | Komori