Operation of Lines 6 and 7 and Line Expansion
First written in FY2016-Q2. 27 of 34 entries say "Advanced", first in FY2016-Q3. Latest entry: FY2026.
- FY2026SoftenedAnnual report
「Except for new installations and similar projects for routine equipment renewal, there are no plans for new installations or similar projects involving significant equipment.」
The company continues to state that there are no plans for new installations of significant equipment, confirming a contraction from the previous trend of line expansion and increased operations. - FY2025SoftenedAnnual report
「Regarding manufacturing, W-SCOPE KOREA CO., LTD. (WSK) has been gradually suspending operations of its separator production lines since the second half of the current fiscal year in response to declining customer demand.」
In response to declining customer demand, WSK has been gradually suspending its separator production lines since the second half, marking a shift from line expansion and increased operations toward contraction. - FY2025-H1RestatedAnnual report
「Meanwhile, the company is continuing to introduce to the new large film-forming lines, whose installation was completed in the fourth quarter of the previous fiscal year, the same productivity-enhancement technology used at WSK.」
The company is continuing to introduce productivity-enhancement technology to the new large film-forming lines. The rollout of equipment on the new lines is continuing, but this filing does not report any newly completed milestones, such as the start of mass-production operations. - FY2024-Q2AdvancedAnnual report
「At W-SCOPE CHUNGJU PLANT CO., LTD. (WCP), mass production continued on the No. 1 through No. 6 large film-forming lines. In parallel, trial operations were conducted on the new large film-forming lines whose installation was completed in the fourth quarter of the previous fiscal year. The company is also introducing the same productivity-enhancement technology used at WSK to these new large film-forming lines and plans to begin mass-production operations sequentially during the current fiscal year.」
WCP continued mass production on the No. 1 through No. 6 large film-forming lines. The new large film-forming lines advanced to the trial-operation stage and the introduction of productivity-enhancement technology. Mass-production operations are scheduled to begin sequentially during the current fiscal year. - FY2024AdvancedAnnual report
「At W-SCOPE CHUNGJU PLANT CO., LTD., installation of 2 new film-forming lines was under way during the fourth-quarter consolidated accounting period. The new lines had not yet begun mass-production operations, while the equipment overall operated stably.」
WCP's 2 new film-forming lines were at the installation stage and had not begun mass-production operations during the fiscal year. - FY2023-Q3AdvancedAnnual report
「Regarding manufacturing, improvement work on existing lines at W-SCOPE KOREA CO., LTD. (WSK) has progressed smoothly. In addition, the relocation of WSK's No. 3 plant to W-SCOPE CHUNGJU PLANT CO., LTD. (WCP) was completed by the end of the third quarter, and the company is proceeding with the consolidation of the separator business at WCP and the expansion of the ion-exchange membrane business at WSK.」
Improvements to WSK's existing lines progressed, and the relocation of WSK's No. 3 plant to WCP was also completed by the end of the third quarter. - FY2023-Q2AdvancedAnnual report
「Shipment-quality evaluation of samples from the film-forming lines where improvements have already been completed is finished, and evaluation of mass-production samples is under way.」
For the improvement of WSK's existing film-forming lines, shipment-quality evaluation of samples from the improved lines has been completed, and the process has advanced to evaluation of mass-production samples. - FY2023-Q1AdvancedAnnual report
「Regarding manufacturing, improvement work on existing lines at W-SCOPE KOREA CO., LTD. (WSK) has progressed smoothly, and samples are being shipped from film-forming lines where the improvements have already been completed.」
Improvement work on WSK's existing film-forming lines progressed to the stage of beginning sample shipments from the improved lines. - FY2022AdvancedAnnual report
「Regarding manufacturing, W-SCOPE KOREA CO., LTD. (WSK) continued to work on improving production efficiency. At W-SCOPE CHUNGJU PLANT CO., LTD. (WCP), production volumes on WCP's No. 5 and No. 6 lines, which correspond to the group's cumulative No. 14 and No. 15 lines and began mass-production operations in the fourth-quarter consolidated accounting period of the previous fiscal year, stabilized, resulting in a substantial increase in film-forming line output.」
Production on WCP's cumulative No. 14 and No. 15 film-forming lines stabilized after the start of mass production, leading to higher film-forming line output. - FY2022-Q3AdvancedAnnual report
「W-SCOPE KOREA CO., LTD. (WSK) continued to work on improving production efficiency. At W-SCOPE CHUNGJU PLANT CO., LTD. (WCP), production volumes on the cumulative No. 14 and No. 15 lines, which began mass-production operations in the fourth-quarter consolidated accounting period of the previous fiscal year, stabilized, resulting in a substantial increase in film-forming line output.」
Production on WCP's cumulative No. 14 and No. 15 lines stabilized after the start of mass production, and film-forming line output increased. WSK continued to improve production efficiency. - FY2022-Q2AdvancedAnnual report
「WSK continued to work on improving production efficiency. At W-SCOPE CHUNGJU PLANT CO., LTD. (WCP), production volumes on the cumulative No. 14 and No. 15 lines, which began mass-production operations in the fourth-quarter consolidated accounting period of the previous fiscal year, stabilized, resulting in a substantial increase in film-forming line output. Output from the coating lines also increased as 2 lines were added year on year.」
WSK continued to improve production efficiency, while production on WCP's cumulative No. 14 and No. 15 lines stabilized after the start of mass production. Output from the coating lines also increased, with 2 lines added year on year. - FY2022-Q1AdvancedAnnual report
「At W-SCOPE CHUNGJU PLANT CO., LTD. (WCP), production on the cumulative No. 14 and No. 15 film-forming lines, which began mass-production operations in the fourth-quarter consolidated accounting period of the previous fiscal year, has stabilized and sales volumes have increased.」
Production on WCP's cumulative No. 14 and No. 15 film-forming lines stabilized after mass production began, leading to higher sales volumes. - FY2021AdvancedAnnual report
「At W-SCOPE CHUNGJU PLANT CO., LTD. (WCP), 2 new film-forming lines and 2 coating lines began mass-production operations during the fourth-quarter consolidated accounting period, substantially increasing production of coated separators.」
At WCP, 2 new film-forming lines and 2 coating lines began mass-production operations, advancing the expansion of production facilities from the preparation stage to mass production and increased output. - FY2021-Q3AdvancedAnnual report
「At W-SCOPE CHUNGJU PLANT CO., LTD. (WCP), the 4 existing production lines continued to operate smoothly in mass production, while preparations for mass-production shipments from 2 new production lines were also completed.」
WCP's existing 4 lines continued mass-production operations, and preparations for mass-production shipments from 2 new production lines were completed. - FY2021-Q2AdvancedAnnual report
「Regarding manufacturing, WCP's 4 existing lines continued to operate smoothly in mass production, while installation of the cumulative No. 14 and No. 15 lines was completed. Following product prototyping, the company was awaiting the start of mass-production shipments from the new lines. However, because the start was slightly delayed, the transfer of production of products for automotive projects manufactured by WSK to WCP's new lines has not progressed, resulting in a delay of several months in optimizing production across the group.」
WCP's existing 4 lines continued mass-production operations, while installation of the cumulative No. 14 and No. 15 lines was completed and the company was awaiting the start of mass-production shipments after the prototyping stage. However, the start of mass production on the new lines and the production transfer were delayed. - FY2021-Q1AdvancedAnnual report
「At WSK, mass-production testing is being conducted on separators for a new automotive battery model scheduled to begin mass-production sales from the fourth quarter of the current consolidated fiscal year on some production lines. At W-SCOPE CHUNGJU PLANT CO., LTD. (WCP), the existing 4 lines have been operating smoothly in mass production, construction of the new mass-production lines, WCP's No. 5 and No. 6 film-forming lines, has progressed, and trial operations are expected to begin in the second quarter of the current consolidated fiscal year.」
WCP's existing 4 lines have been operating smoothly in mass production. Construction of the No. 5 and No. 6 film-forming lines has progressed, and trial operations are expected to begin in the second quarter. WSK has also begun mass-production testing for new-model mass-production sales in the fourth quarter. - FY2020AdvancedAnnual report
「Demand for coating products also increased on production lines for consumer applications, so 2 coating lines were added during the fourth-quarter consolidated accounting period and preparations for mass production are under way. At W-SCOPE CHUNGJU PLANT CO., LTD. (WCP), production for automotive batteries likewise recovered during the fourth-quarter consolidated accounting period, creating a situation in which production had to be expanded urgently. Demand for consumer applications also continued to recover. Since demand for coating products has increased substantially across all projects, the company is proceeding with the addition of 4 new coating lines.」
The company progressed to the stage of adding 2 coating lines at WSK and 4 at WCP to respond to recovering demand for both automotive and consumer applications. - FY2020-Q2AdvancedAnnual report
「At some WSK production lines, we suspended operations on certain production lines from mid-April through May because European automotive OEMs closed their plants as a COVID-19 countermeasure, but resumed production in June. W-SCOPE CHUNGJU PLANT CO., LTD. (WCP) likewise suspended operations on some production lines from mid-April through May, but resumed production in June.」
Following the closure of European automotive OEM plants, some WSK and WCP lines were suspended from mid-April through May, but both sites resumed production in June. - FY2020-Q1AdvancedAnnual report
「At W-SCOPE CHUNGJU PLANT CO., LTD. (WCP), the cumulative No. 12 and No. 13 lines, which began operations in the second half of last year, steadily increased mass supply of automotive separators and made a significant contribution to the increase in revenue for the fiscal year.」
WCP's cumulative No. 12 and No. 13 lines progressed to the stage of increasing mass supply of automotive separators and contributing to higher revenue for the quarter. - FY2019AdvancedAnnual report
「Regarding manufacturing, WSK began mass production in the first half for a new automotive battery project on some production lines and focused on improving productivity, achieving improvement to a certain level by the end of the fiscal year. At WCP, some production adjustments were made on certain lines due to weak orders for consumer applications, as at WSK. However, the cumulative No. 12 and No. 13 lines, whose installation was completed in the second half, were prepared to begin mass supply of automotive separators within a short period. Mass production began sequentially from the fourth quarter, making a significant contribution to the increase in revenue for the fiscal year.」
WCP completed preparations for mass supply of automotive separators on its No. 12 and No. 13 lines, and began mass production sequentially from the fourth quarter. - FY2019-Q3AdvancedAnnual report
「WSK's 9 production lines have generally operated smoothly, although some lines have been used for trial mass production of new products and sample production for new projects. WCP has continued mass-production sales on its cumulative No. 10 and No. 11 lines. Installation of the No. 12 line was completed at the end of June this year, customer approval has already been obtained, and preparations for mass production are complete. Similar preparations for the No. 13 line are scheduled to be advanced by the end of this year.」
WSK's 9 production lines have generally operated smoothly. WCP has continued mass-production sales on its No. 10 and No. 11 lines, while customer approval has been obtained for the No. 12 line and preparations for mass production have been completed. The No. 13 line has also progressed according to the plan to complete preparations by year-end. - FY2019-Q2AdvancedAnnual report
「Regarding manufacturing operations, W-SCOPE KOREA CO., LTD.'s 9 production lines were engaged in sample production for EV projects and mass-production trials for line certification on some lines, but overall, all production lines are operating smoothly. At W-SCOPE CHUNGJU PLANT CO., LTD., installation of cumulative Lines 10 and 11 was completed in the second half of the previous year, and mass-production sales have begun, while production of samples for technical approval by major customers is also under way. Installation of cumulative Lines 12 and 13 is nearly complete, and trial operations will begin in the second half of the year.」
The 9 W-SCOPE KOREA lines operated generally smoothly, and mass-production sales began on WCP's No. 10 and No. 11 lines. Installation of the No. 12 and No. 13 lines was nearly complete, and they had advanced to the stage of beginning trial operations in the second half. - FY2019-Q1AdvancedAnnual report
「Regarding manufacturing operations, W-SCOPE CHUNGJU PLANT CO., LTD. (WCP), whose installation work was completed in the second half of the previous year, began producing samples for technical approval by major customers on its cumulative Lines 10 and 11, while also beginning production for mass-production sales. WCP is also installing cumulative Lines 12 and 13, which are scheduled for completion in the second half of the current year.」
WCP began producing technical-approval samples and products for mass-production sales on Lines 10 and 11, and progressed with installation of Lines 12 and 13, which are scheduled for completion in the second half of the current year. - FY2018AdvancedAnnual report
「At the beginning of fiscal 2019, 11 film-forming lines for mass production were operating. In the second half of the year, W-SCOPE CHUNGJU PLANT CO., LTD. is expected to complete construction of large film-forming Lines 12 and 13 and transition them to mass production.」
The company indicated that 11 film-forming lines for mass production were operating at the beginning of fiscal 2019, with plans to complete and transition large film-forming Lines 12 and 13 to mass production in the second half of 2019. - FY2018-Q3RestatedAnnual report
「The company has continued introducing large, state-of-the-art manufacturing lines and improving the manufacturing environment within its plants to address the expansion of the lithium-ion battery market and stringent quality requirements for separators used as safety materials.」
The company has continued introducing large, state-of-the-art manufacturing lines and improving the manufacturing environment within its plants. - FY2018-Q2AdvancedAnnual report
「The company has been making capital investments in preparation for the expansion of EV demand from the second half of 2019. Over the past year, 4 film-forming lines and 2 coating lines have started operations, increasing fixed costs including depreciation expenses.」
In response to expanding EV demand, 4 film-forming lines and 2 coating lines began operating over the past year. - FY2018-Q1AdvancedAnnual report
「Regarding manufacturing operations, W-SCOPE KOREA CO., LTD.'s Lines 8 and 9, which began operating in the second half of the previous year, continued mass-production shipments to certain customers while also producing samples for line approval by major customers. At WCP, construction of Lines 10 and 11 was completed, and preparations are under way to begin mass production.」
Lines 8 and 9 have continued mass-production shipments, while construction of Lines 10 and 11 has been completed and preparations are under way to begin mass production. - FY2017AdvancedAnnual report
「Lines 8 and 9, the large film-forming lines, transitioned to mass production in the second half of 2017. At W-SCOPE CHUNGJU PLANT CO., LTD., the new production subsidiary, mass production on Lines 10 and 11 is scheduled to begin in the first half of 2018.」
Lines 8 and 9 completed the transition to mass production, and plans progressed for Lines 10 and 11 to begin mass production in the first half of 2018. The facilities table indicates that the completed Lines 8 and 9 will increase production capacity by approximately 60%. - FY2017-Q3AdvancedAnnual report
「Against this market backdrop, the company has continued implementing its mass-production launch plan for large manufacturing lines, from Production Line 8 onward, in response to the rapid expansion in automotive-related demand. Production Line 8 began operating as planned in the third quarter, and a total of 4 large lines are expected to be operational by the first half of next year. In 2018, production capacity is expected to be more than twice the 2016 level.」
Production Line 8 began operating as planned in the third quarter, and the company progressed to a stage where a total of 4 large lines are expected to be operational by the first half of next year, with production capacity expected to exceed twice the 2016 level in 2018. - FY2017-Q2RestatedAnnual report
「Operating profit declined sharply year on year as repair expenses were incurred for ongoing renovations to manufacturing lines and the plant aimed at improving quality ahead of sales to the automotive market from next year onward, while productivity declined during the repair period. The decline also reflected higher depreciation expenses for expanded production lines, higher expenses from hiring personnel ahead of facility expansion, and increased sample shipments to new customers.」
Higher depreciation expenses for expanded production lines and higher expenses from hiring personnel ahead of facility expansion have continued to be incurred. - FY2017-Q1RestatedAnnual report
「Operating profit was compressed by higher depreciation expenses for Production Lines 5 through 7 added the previous year, higher expenses from hiring personnel ahead of facility expansion planned for the second half of the current year, and increased cost of sales due in part to the appreciation of the South Korean won against the yen.」
Expansion has continued after the start-up of Production Lines 5 through 7, in anticipation of facility expansion in the second half of the current year. - FY2016AdvancedAnnual report
「Lines 6 and 7 transitioned to mass production in September 2016. Line 5 began operating in September 2016, but technical issues delayed its transition to mass production by approximately six months from the original plan, resulting in output below the initial supply plan. Line 5 has since resolved its technical issues, achieved its originally planned production capacity from January 2017, and transitioned to stable mass production. The group has also decided to invest in Lines 8 through 13 and coating equipment, and work has already begun on Lines 8 through 11 and the coating equipment.」
Lines 6 and 7 completed the transition to mass production, while Line 5 transitioned to stable mass production at its originally planned capacity from January 2017. Investment decisions and work have also progressed for Lines 8 through 13 and coating equipment. - FY2016-Q3AdvancedAnnual report
「As a result, Lines 6 and 7 completed the transition to mass production in September.」
Lines 6 and 7 completed the transition to mass production in September, and the facilities table indicates a capacity increase equivalent to approximately 15% growth in production volume versus the end of the previous consolidated fiscal year. - FY2016-Q2First statedAnnual report
「Operating profit was affected as expected by lower initial utilization rates associated with the start-up of Lines 6 and 7 and increased fixed-cost burdens.」
The new lines have begun operations, and further line expansion is expected. The effects of initial utilization rates and fixed costs associated with the expansion of facilities are also noted.