Business continuity targets for pandemics, earthquakes and floods
First written in FY2023. 1 of 3 entries say "Restated". Latest entry: FY2026.
The whole theme swung hardest in 2026: 10 of 86 companies on the "Worse" side.
98 other companies' latest entry also says "Restated".
- FY2026RestatedAnnual report
「Business suspension period No occurrence No occurrence; target achieved Target recovery time To be determined based on the extent of damage (provisional: begin collecting disaster waste within 7 days, during the initial restoration of transportation networks) No assumed earthquake occurred」
The Company reconfirmed that it achieved the target of no business suspension during a pandemic, while the earthquake and flood targets remain unverified because no assumed events occurred. - FY2024Pandemic target achieved; disaster targets unverifiedAnnual report
「Business suspension period No occurrence No occurrence; target achieved」
The target of no business suspension during a pandemic was achieved. As no assumed earthquake or flood event occurred, the 7-day and 3-day recovery targets remain unverified. - FY2023First statedAnnual report
「a Pandemic Metric: Business suspension period Target: No occurrence b Earthquake Metric: Target recovery time Target: To be determined based on the extent of damage (provisional: begin collecting disaster waste within 7 days, during the initial restoration of transportation networks) c Flood Metric: Target recovery time Target: 3 days」
For the first time, the Company set targets of no business suspension during a pandemic, a provisional target recovery time of 7 days following an earthquake, and a target recovery time of 3 days following a flood.