Komori
Kvk (6484) · InitiativeAdvanced

Mass production using new plastic plating equipment at the Tomika Plant

First written in FY2016. 3 of 5 entries say "Advanced", first in FY2024. Latest entry: FY2025.

5entries
10years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2016 – FY2017-Q1AdvancedFY2024 – FY20252016: 220162017: 020172018: 020182019: 020192020: 020202021: 020212022: 020222023: 020232024: 220242025: 12025
Same theme, other companies
Mass production using new resin plating equipment at the Tomika PlantA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2025AdvancedAnnual report

    「The 2 new factory buildings constructed to expand production capacity have established injection molding and plastic plating lines, creating a system for increasing production of plastic components. Utilization rates have also risen, and the facilities are operating stably.」

    The 2 new factory buildings have established injection molding and plastic plating lines, creating a system for increased production of plastic components and reaching stable operation.
  2. FY2025-H1AdvancedAnnual report

    「The injection molding machines and plastic plating equipment introduced in stages at the 2 new factory buildings to expand production capacity have seen rising utilization rates and are operating stably.」

    The plastic plating equipment installed in the 2 new factory buildings has progressed to stable operation, accompanied by rising utilization rates.
  3. FY2024AdvancedAnnual report

    「The 2 new factory buildings constructed to expand production capacity have begun full-scale operation after the installation of injection molding machines and plastic plating equipment.」

    The company reported the installation and full-scale operation of plastic plating equipment at the 2 new factory buildings, indicating progress from the previous equipment installation plan to the full-scale operating stage.
  4. FY2017-Q1RestatedAnnual report

    「Starting in January this year, the company began operating the new plastic plating equipment at the Tomika Plant and started mass production of plastic components, while」

    The company has again stated that it began mass production of plastic components using the new plastic plating equipment, but has not indicated that it has reached a new stage.
  5. FY2016First statedAnnual report

    「The company began mass production using the new plastic plating equipment at the Tomika Plant in January this year and is also working to increase the plant’s value added.」

    The company is linking the specific production measure of starting mass production with the new equipment to increasing the plant’s value added.
Moved together

"Product Development to Meet Safety, Reliability, Comfort and Environmental Needs" moved the same way as this thread, in the same document, in 3 of its 5 moves.

33222★12345
  1. ★This thread
  2. 1Product Development to Meet Safety, Reliability, Comfort and Environmental Needs3×
  3. 2Eliminating waste and establishing an optimal production system through KPS3×
  4. 3Strengthening cost competitiveness by reducing fixed and variable costs2×
  5. 4Shareholder returns focused on ROE and semiannual dividends2×
  6. 5Acquisition of land adjacent to the head office plant and plans to expand the plant and build a training facility2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Kvk's next results are scheduled for 2026-11-13. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.