Komori
Ntn (6472) · InitiativeAdvanced

Smart factory initiatives at the Wakayama Plant and RPA and work-style reforms

First written in FY2018. 3 of 5 entries say "Advanced", first in FY2021. Latest entry: FY2023.

5entries
6years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2018 – FY2019AdvancedFY2021 – FY20232018: 120182019: 120192020: 020202021: 120212022: 120222023: 12023
Same theme, other companies
Supply Chain and Factory Resilience and Smart Factory PromotionA theme 35 companies write about · 0 as a headwind · 37 as a tailwind

The whole theme swung hardest in 2021: 2 of 16 companies on the "Worse" side.

16 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 35 companies compared. The sentences above are computed from all 35.
Full recordFilings, disclosures and news, newest first
  1. FY2023AdvancedAnnual report

    「In Japan, the company made ¥9,293 million in capital expenditures, including construction of buildings and the installation of bearing manufacturing equipment at its Wakayama Plant (tentative name), as well as expansion of constant-velocity joint manufacturing equipment at the Iwata Plant.」

    The Company carried out investments including construction of the Wakayama Plant building, installation of bearing manufacturing equipment, and expansion of equipment at the Iwata Plant, advancing smart-factory initiatives and strengthening production capacity.
  2. FY2022AdvancedAnnual report

    「In Japan, the company made ¥9,114 million in capital expenditures, including construction of buildings and the installation of bearing manufacturing equipment at its Wakayama Plant (tentative name).」

    The Company carried out investments related to the smart factory, including construction of the Wakayama Plant building and installation of equipment.
  3. FY2021AdvancedAnnual report

    「In Japan, the company made ¥11,099 million in capital expenditures, including construction of buildings and the installation of bearing manufacturing equipment at its Wakayama Plant.」

    The Company carried out construction of the Wakayama Plant building and installation of bearing manufacturing equipment, and advanced domestic capital investment including smart-factory initiatives.
  4. FY2019RestatedAnnual report

    「At the Wakayama Plant, scheduled for completion this autumn, the Company will promote smart-factory initiatives in manufacturing and work to significantly shorten manufacturing lead times.」

    Regarding the Wakayama Plant’s smart-factory initiatives, the Company has stated that completion is scheduled for this autumn and that manufacturing lead times will be shortened through the use of IoT, AI, and robots. This describes a specific plan, not a newly completed achievement.
  5. FY2018First statedAnnual report

    「At the “Wakayama Plant” (provisional name), where mass production of ball bearings is scheduled to begin next June, the Company will promote smart-factory initiatives, including optimization and automation using IoT and AI and labor-saving through the introduction of robots. In response to labor shortages and rising labor costs resulting from the future decline in Japan’s working population, it also aims to build a structure capable of expanding the business through process automation using RPA and work-style reforms in indirect functions.」

    The Company has presented the use of IoT, AI, and robots to develop the Wakayama Plant into a smart factory, together with RPA and work-style reforms in indirect functions, as new initiatives.
Moved together

"Expanding the aftermarket business and achieving No. 1 customer satisfaction worldwide" moved the same way as this thread, in the same document, in 3 of its 5 moves.

333332★123456
  1. ★This thread
  2. 1Expanding the aftermarket business and achieving No. 1 customer satisfaction worldwide3×
  3. 2Innovating manufacturing methods through next-generation technologies3×
  4. 3Globalizing the R&D structure and developing new technologies and products3×
  5. 4Reviewing the Rationale for Cross-Shareholdings and Reducing Holdings3×
  6. 5Strengthening inventory and lead-time management through a new core IT system3×
  7. 6Strengthening earnings management and improving asset efficiency2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Ntn's next results are scheduled for 2026-10-30. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.