Design and construction defects and product liability
First written in FY2016. 3 of 6 entries say "Restated". Latest entry: FY2025.
Raiznext moved to the "Worse" side of this theme in 2020.
The whole theme swung hardest in 2025: 1 of 8 companies on the "Worse" side.
10 other companies' latest entry also says "Restated".
- FY2025RestatedAnnual report
「We have established systems that contribute to quality improvement and are working to ensure the quality of design, construction and other operations and prevent quality nonconformities by complying with the quality management system based on ISO9001 and various technical standards, strengthening management through enhanced internal training and appropriate staffing, reviewing and developing rules and procedures for conducting operations, and strengthening information sharing.」
The company continues to address quality control, training, staffing, procedure development and information sharing in connection with design and construction quality and liability for breach of contract and product liability. - FY2024RestatedAnnual report
「We have established systems that contribute to quality improvement and are working to ensure the quality of design, construction and other operations and prevent quality nonconformities by complying with the quality management system based on ISO9001 and various technical standards, strengthening management through enhanced internal training and appropriate staffing, reviewing and developing rules and procedures for conducting operations, and strengthening information sharing.」
The company continues to address quality control, training, staffing, procedure development and information sharing in response to the risks of liability for breach of contract and product liability. - FY2021ReframedAnnual report
「Although we take every possible measure to ensure the quality of design and construction, if damages arise based on liability for breach of contract or product liability, this may affect our business performance.」
The wording was revised from the previous liability for non-conformity to contract to liability for breach of contract, and measures to ensure quality through ISO9001, technical standards, internal training and insurance are described. - FY2020ReframedAnnual report
「Although we take every possible measure to ensure the quality of design and construction, if damages arise from liability for non-conformity to contract or product liability, this may affect our business performance.」
The wording was revised from the former warranty liability to liability for non-conformity to contract, with quality control under ISO9001 and insurance coverage explicitly identified as countermeasures. - FY2017RestatedAnnual report
「Although we take every possible measure to ensure the quality of design and construction, if damages arise from warranty liability or product liability, this may affect our business performance.」
The company continues to describe compensation risks arising from defects in design and construction and from product liability. - FY2016First statedAnnual report
「Although we take every possible measure to ensure the quality of design and construction, if damages arise from warranty liability or product liability, this may affect our business performance.」
The company describes compensation risks arising from warranty liability and product liability while maintaining quality control.