Komori
Shibuya (6340) · InitiativeAdvanced

Capital investment in the Morimoto No. 2 Machine Plant and the Wakamıya Medical Equipment Plant, including rebuilding projects

First written in FY2018. 7 of 10 entries say "Advanced", first in FY2020. Latest entry: FY2026.

10entries
9years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2018AdvancedFY2020 – FY2021AdvancedFY2023 – FY2026-H12018: 12019: 020192020: 120202021: 120212022: 120222023: 120232024: 020242025: 120252026: 42026
Same theme, other companies
Expansion and Rationalization of Production FacilitiesA theme 378 companies write about · 0 as a headwind · 417 as a tailwind
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 182 companies compared. The sentences above are computed from all 182.Comparing 200 of the theme's 417 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「The main projects included construction of the Company’s Morimoto No. 3 Machine Plant, SX Morimoto Plant and Nomi No. 2 Machine Plant (Packaging Plant Business), and Building B of the Medical Equipment Wakamiya Plant (Mechatronics Systems Business), as well as new construction and replacement investments in machine tools, tools, fixtures and equipment, among others.」

    Construction and investment were carried out at the Morimoto No. 3 Machine Plant, SX Morimoto Plant, Nomi No. 2 Machine Plant and Medical Equipment Wakamiya Plant Building B, bringing total capital investment to ¥8.002 billion. Completion of the respective plants is scheduled for September through November 2026.
  2. FY2026-H1AdvancedAnnual report

    「In addition to the lower operating rate resulting from the decline in revenue, the increase in depreciation expenses associated with completion of the new head office plant also had an impact」

    For the Agricultural Equipment Business, the new head office plant was completed, and depreciation expenses after completion affected profit or loss for the interim period.
  3. FY2025AdvancedAnnual report

    「The main projects included the construction site for the Company’s SX Morimoto Plant (Packaging Plant Business) and the Hamamatsu New Head Office Plant of consolidated subsidiary シブヤ精機㈱ (Agricultural Equipment Business), as well as new construction and replacement investments in machine tools, tools, fixtures and equipment, among others.」

    Investment was made in the Hamamatsu New Head Office Plant, bringing total capital investment to ¥7.143 billion. Plans for the construction of the SX Morimoto Plant, Morimoto No. 3 Machine Plant, Nomi No. 2 Machine Plant and Medical Equipment Wakamiya Plant Building B from 2025 through 2026 have also been specified.
  4. FY2023AdvancedAnnual report

    「The main projects included the Nomi High-Tech Plant of the Company’s Packaging Plant Business, as well as new construction and replacement investments in machine tools, tools, fixtures and equipment, among others. シブヤ精機㈱ Hamamatsu New Head Office Plant (Note 2) Hamamatsu, Shizuoka Agricultural Equipment Business Produce grading and sorting system production facilities and R&D facilities ¥6,800 million ¥686 million Internal funds and borrowings January 2024 June 2025」

    The Company made capital investments in the Nomi High-Tech Plant, and the Hamamatsu New Head Office Plant project was updated to a planned investment of ¥6.8 billion, with construction scheduled to start in January 2024 and be completed in June 2025.
  5. FY2022Progress at the Nomi High-Tech Plant and postponement of the Hamamatsu New Head Office Plant projectAnnual report

    「The Company | Nomi High-Tech Plant | Nomi, Ishikawa | Packaging Plant Business | Packaging plant production facilities | ¥7,500 million | ¥3,297 million | Internal funds and borrowings | April 2021 | July 2022 シブヤ精機㈱ | Hamamatsu New Head Office Plant | Hamamatsu, Shizuoka | Agricultural Equipment Business | Produce grading and sorting system production facilities and R&D facilities | ¥6,200 million | ¥546 million | Internal funds and borrowings | January 2024 | July 2025」

    The Nomi High-Tech Plant has a planned investment of ¥7.5 billion, with ¥3.297 billion already paid, and is scheduled for completion in July 2022. The Hamamatsu New Head Office Plant is listed as a ¥6.2 billion project, scheduled to start in January 2024 and be completed in July 2025, with the timeline pushed back from the previous plan.
  6. FY2021AdvancedAnnual report

    「The Company | Nomi High-Tech Plant | Nomi, Ishikawa | Packaging Plant Business | Packaging plant production facilities | ¥7,500 million | ¥1,065 million | Internal funds and borrowings | April 2021 | July 2022 シブヤ精機㈱ | Hamamatsu New Head Office Plant | Hamamatsu, Shizuoka | Agricultural Equipment Business | Produce grading and sorting system production facilities and R&D facilities | ¥6,200 million | ¥573 million | Internal funds and borrowings | April 2022 | April 2023」

    The Nomi High-Tech Plant has a planned investment of ¥7.5 billion, with ¥1.065 billion already paid, and is scheduled for completion in July 2022. A plan to build the ¥6.2 billion Hamamatsu New Head Office Plant of シブヤ精機 was also added.
  7. FY2020AdvancedAnnual report

    「Major projects included the Medical Equipment Wakamiya Plant in the Mechatronics Systems business, a multistory car park at our head office, and new construction and renewal investments in machine tools, tools and equipment, and other assets. The company also lists the Nomi High-Tech Plant with planned investment of ¥7 billion, work beginning in April 2021 and scheduled completion in July 2022.」

    The company made capital investments, including the replacement of the Medical Equipment Wakamiya Plant, while presenting a plan for the Nomi High-Tech Plant involving planned investment of ¥7 billion, work beginning in April 2021 and scheduled completion in July 2022.
  8. FY2018First statedAnnual report

    「Our company, Morimoto No. 2 Machine Plant: planned investment of ¥1,051 million; start May 2018; scheduled completion February 2019 Our company, Medical Equipment Wakamiya Plant: replacement; planned investment of ¥1,980 million; start September 2018; scheduled completion August 2019 根上シブヤ Co., Ltd.: head office plant and office building; planned investment of ¥1,250 million; start June 2018; scheduled completion March 2019」

    The company provides specific investment amounts, start dates and scheduled completion dates for the Morimoto No. 2 Machine Plant, the replacement of the Medical Equipment Wakamiya Plant, and the 根上シブヤ head office plant and office building.
Moved together

"Increase in the interim dividend to ¥15 per share" moved the same way as this thread, in the same document, in 5 of its 10 moves.

543333★123456
  1. ★This thread
  2. 1Increase in the interim dividend to ¥15 per share5×
  3. 2Development of a high-precision wire bonder using ultrasonic-assisted thermocompression bonding4×
  4. 3Enhancing Corporate Governance3×
  5. 4Lower demand for semiconductor manufacturing equipment due to restrained domestic capital investment3×
  6. 5Continuation of R&D Activities3×
  7. 6Expanding overseas medical-equipment sales and improving quality control3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Shibuya's next results are scheduled for 2026-11-09. Read the earnings preview It last moved in the Presentation materials for financial results of 2026-08-18: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.