Development of Global IT Infrastructure under the One TOYO Framework

First written in FY2016. 11 of 12 entries say "Advanced", first in FY2017. Latest entry: FY2026.

12entries
11years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2017 – FY20262016: 120162017: 120172018: 120182019: 120192020: 120202021: 120212022: 020222023: 120232024: 120242025: 120252026: 32026
Same theme, other companies

45 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 83 companies compared. The sentences above are computed from all 83.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「From the perspective of corporate management reform, the company is using the “CMC (Corporate Management Cockpit)” as a support tool for each committee, which serves as an important decision-making body, and is promoting data utilization that links resource planning, DX investment, and risk management.」

    DXoT has expanded beyond AWP and 3D CAD-based delay detection to integrated use of management data on resources, DX investment, and risk management through CMC.
  2. FY2025AdvancedAnnual report

    「As a specific result, the system for detecting the risk of schedule delays in underground construction from 3D CAD models, which began application to actual projects in 2022 through joint development with HEROZ株式会社, produced clear results in 2023 and contributed to improved performance across the project. In addition, following efforts in 2024 to implement the AWP (Advanced Work Packaging) that the company emphasizes in projects, application in the EPC field expanded to 12 projects, and visualization and streamlining of schedules through DX made a significant contribution to improved profitability.」

    For DXoT, the effects of applying 3D CAD-based delay-risk detection to actual projects became clear, and AWP application expanded to 12 projects in 2024.
  3. FY2024AdvancedAnnual report

    「In 2023, the effects began to emerge in actual projects, and the contribution to improved project performance has continued to increase. The company will continue to deepen AWP implementation in projects, pursue end-to-end digitalization of project execution, and contribute to society through business reform and enhanced value delivered.」

    The company states that the application of the data integration platform to actual projects is beginning to produce results and that its contribution to project performance is increasing. It will continue end-to-end implementation of AWP.
  4. FY2023AdvancedAnnual report

    「In fiscal 2022, the company also completed the construction and demonstration of an engineering data integration platform. The shift from document-centered to data-centered operations accelerated, and initiatives to digitally transform EPC projects as a whole through integrated management of data managed by the project, supply-chain, and construction departments, as well as application to actual projects, are progressing.」

    For DXoT, construction and demonstration of the engineering data integration platform were completed, progressing to integrated management of project, supply-chain, and construction data and application to actual projects.
  5. FY2021AdvancedAnnual report

    「Specifically, real-time monitoring of project status was applied to 10 projects (7 overseas, including 3 projects originated independently by overseas offices, and 3 domestic projects), 3D design quality checks previously performed manually with substantial effort were systematized, design operations were automated, construction sites were digitized, and a framework was established to apply AWP (Advanced Work Package), a new EPC work process that enables engineering backcast from construction and commissioning, to actual projects.」

    For DXoT, the scope of real-time monitoring expanded to 10 projects, and progress was made in systematizing 3D quality checks, automating design, digitizing construction sites, and establishing a framework for applying AWP.
  6. FY2020AdvancedAnnual report

    「In July 2019, the company established the DXoT (Digital Transformation of TOYO) Promotion Department and formulated a vision and roadmap toward 2025. Specifically, real-time monitoring of project status was applied to 5 projects, 3D design quality checks previously performed manually with substantial effort were systematized, and a framework was established to apply AWP (Advanced Work Package), a new EPC work process that enables engineering backcast from construction and commissioning, to actual projects.」

    Progress was made in establishing the DXoT Promotion Department, formulating a roadmap toward 2025, applying real-time monitoring to 5 projects, systematizing 3D quality checks, and establishing a framework for applying AWP.
  7. FY2019AdvancedAnnual report

    「During the year, the company introduced Hexagon’s Smart Plant Construction and began construction management using AWP (Advanced Work Packaging). It also improved design quality and streamlined quality checks by systematizing 3D design quality checks that had relied on experience. The company aims to improve productivity and operational speed by verifying digital technologies such as RPA (Robotic Process Automation), BI (Business Intelligence), and AI and applying them to operations sequentially.」

    DXoT has progressed to construction management using AWP, systematization of 3D design quality checks, and verification of the application of RPA, BI, and AI to operations.
  8. FY2018AdvancedAnnual report

    「During the year, the company considered reforms to its methods for executing EPC projects and proposed Advanced Project Execution, which uses Digital technologies that have seen significant functional improvements in recent years, linking it to implementation from the next fiscal year onward. It also developed a vendor evaluation and management system to reduce loss costs arising from quality problems with vendor-supplied equipment and materials, seeking to improve procurement quality through appropriate vendor selection and ordering. In addition, it began considering productivity improvements through the use of robotic technology for repetitive tasks such as transcription and aggregation in many design and administrative operations, removing them from sequential manual processing through RPA (Robotic Process Automation). As the first such initiative, it developed a Digital Assistant service to improve the accuracy of work-hour management and streamline the recording of actual work hours.」

    The development of the IT platform has progressed to implementation of Advanced Project Execution from the next fiscal year onward, development of a vendor evaluation and management system, and development of a Digital Assistant service using RPA, and is being promoted comprehensively as DXoT.
  9. FY2017AdvancedAnnual report

    「To enable smooth communication with its globally distributed offices and partners, the company is promoting use of a new information platform for sharing information and workflows. During the year, it evaluated the introduction of an engineering workflow management system, enhanced the functions of its document management system, and verified the migration of its 3D system to the cloud.」

    For the new information platform, the company evaluated the introduction of an engineering workflow management system, enhanced its document management system, and verified migration of its 3D system to the cloud.
  10. FY2016First statedAnnual report

    「To develop an IT platform that improves the efficiency of its globally deployed operations, the company is promoting the use of a new information platform for smooth communication and information and workflow sharing with offices and partners. It is also continuously working to enhance project management and on-site construction management and visualize information, focusing on creating an environment for project execution across remote locations and multiple offices.」

    The company is advancing its new information platform, enhancing project and on-site construction management, and visualizing information.
Moved together

"Scale-up and Commercialization of the ACES21® Urea Process" moved the same way as this thread, in the same document, in 9 of its 12 moves.

988876★123456
  1. ★This thread
  2. 1Scale-up and Commercialization of the ACES21® Urea Process9×
  3. 2Exploration and expansion into new fields8×
  4. 3Reforming Project Execution and Strengthening Quality, Schedule and Cost Management8×
  5. 4Collaboration Framework with Overseas Companies for Seabed Resource Development8×
  6. 5Strengthening the Corporate Foundation through Management Resource Allocation and Organizational Restructuring7×
  7. 6Improving Profitability and Controlling Selling, General and Administrative Expenses6×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Toyo Engineering yet. It last moved in the Management plan of 2026-06-19: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Development of Global IT Infrastructure under the One TOYO Framework | TOYO ENGINEERING CORPORATION (6330) | Komori