Komori
Towa (6315) · InitiativeRestated

Stable Supply System in Emergencies Through Production Site Diversification

First written in FY2021. 2 of 4 entries say "Advanced", first in FY2022-Q2. Latest entry: FY2026.

4entries
6years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2022-Q2 – FY20222021: 220212022: 120222023: 020232024: 020242025: 020252026: 12026
Same theme, other companies
Strengthening BCP through the geographic diversification of headquarters, logistics, and production sitesA theme 34 companies write about · 0 as a headwind · 34 as a tailwind

14 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 34 companies compared. The sentences above are computed from all 34.
Full recordFilings, disclosures and news, newest first
  1. FY2026RestatedAnnual report

    「From a business continuity planning (BCP) perspective, our Group has established a system that enables alternative production at other production facilities if natural disasters or other events make it difficult to operate a major production facility.」

    The Company continues to maintain a stable supply structure during emergencies through the diversification of production sites and alternative production.
  2. FY2022AdvancedAnnual report

    「Against this backdrop, to further strengthen its business activities in China’s expanding market, the Group established 東和半導体設備研究開発(蘇州)有限公司, its first overseas development site, and established a structure enabling it to complete all activities, from design and development through production, sales and after-sales service, within China.」

    The Company established an overseas development site in China and built a structure covering design and development through production, sales and after-sales service entirely within China.
  3. FY2022-Q2AdvancedAnnual report

    「Regarding the impact of power shortages in China, the Company’s Suzhou plant was subject to power restrictions for several days, but it minimized the impact on production by using in-house power generation equipment and shifting production to other sites. Both the Malaysia plant and the Suzhou plant are currently operating normally.」

    Regarding the diversification of production sites and the stable supply structure, the Company actually used in-house power generation and alternative production at other sites during power restrictions at the Suzhou plant, minimizing the impact. Both plants are currently operating normally.
  4. FY2021First statedAnnual report

    「In February 2021, the Company completed a new plant of 東和半導体設備(南通)有限公司. In addition to increasing production capacity in China’s expanding market, it established a production structure capable of maintaining stable supplies even during emergencies through measures including the diversification of production sites.」

    Following completion of the new plant, the Company disclosed for the first time, as a standalone theme, the production-structure initiative of diversifying production sites and establishing a system capable of maintaining stable supplies even during emergencies.
Moved together

"Risk of a sharp decline in capital investment due to changes in the economic environment and semiconductor supply-demand conditions" moved the same way as this thread, in the same document, in 2 of its 4 moves.

222★123
  1. ★This thread
  2. 1Risk of a sharp decline in capital investment due to changes in the economic environment and semiconductor supply-demand conditions2×
  3. 2Creation of a laser equipment business through the integration of laser-related technologies and semiconductor back-end process technologies2×
  4. 3Thorough Cost Review, Viewing Challenging Market Conditions as a Time for Transformation2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Towa's next results are scheduled for 2026-11-06. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Stable Supply System in Emergencies Through Production Site Diversification | TOWA CORPORATION (6315) | Komori