Komori
Estic (6161) · InitiativeAchievedLatest General Meetings of Shareholders (2026-05-27): "Advanced"

Establishment of a New Technology Development Center

First written in FY2022. 2 of 4 entries say "Advanced", first in FY2023. Latest entry: 2026-05-27.

4entries
5years
1from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2022AdvancedFY2023 – 2026-05-272022: 120222023: 120232024: 120242025: 020252026: 12026
Same theme, other companies
Establishment and commencement of operations of a technology development centerA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. 2026-05-27AdvancedGeneral Meetings of Shareholders

    「Total capital investment made during the consolidated fiscal year was ¥963 million, of which the principal item was construction costs for the Product Assembly Center (PAC).」

    Regarding the Product Assembly Center construction plan, the company reports that construction costs formed part of the ¥963 million in capital investment made during the fiscal year.
  2. FY2024AchievedAnnual report

    「September 2023 Technology Development Center (TDC) opened in Moriguchi, Osaka Prefecture」

    The Technology Development Center planned in the previous fiscal year opened in September 2023 and is operating as a research and development facility.
  3. FY2023AdvancedAnnual report

    「(tentative name) Technology Development Center Moriguchi, Osaka Prefecture Building 757,900 222,200 Internal funds January 2023 September 2023」

    The plan for the Technology Development Center was specified as a construction project funded by internal funds, with construction scheduled to begin in January 2023 and be completed in September of the same year, at a total cost of ¥757.9 million, of which ¥222.2 million had already been paid.
  4. FY2022First statedAnnual report

    「The company plans to establish a Technology Development Center (tentative name) from July 2022 onward, but the specific details, including the investment amount, have not yet been determined.」

    The company disclosed for the first time its plan to establish a Technology Development Center from July 2022 onward. The specific details, including the investment amount, have not yet been determined.
Moved together

"Rising Overseas Sales Ratio" moved the same way as this thread, in the same document, in 3 of its 4 moves.

332222★123456
  1. ★This thread
  2. 1Rising Overseas Sales Ratio3×
  3. 2Executive Compensation System Based on Fixed Compensation and Performance-Linked Bonuses3×
  4. 3Significant Increase in Net Sales and Profit2×
  5. 4Growing demand for airless, electric hand nut runners2×
  6. 5Expanding Sales in the Thai and Mexican Markets2×
  7. 6Sharp increase in order backlog for screw-tightening equipment2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Estic's next results are scheduled for 2026-10-29. Read the earnings preview It last moved in the General Meetings of Shareholders of 2026-05-27: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Establishment of a New Technology Development Center | ESTIC CORPORATION (6161) | Komori